• Title/Summary/Keyword: BASIN MANAGEMENT

Search Result 817, Processing Time 0.029 seconds

Forecasting of changes in the water quality in Sapgyo-Lake in accordance with implementation of Total Water Pollutant Load Management System (수질오염총량관리제 시행에 따른 삽교호의 수질변화 예측)

  • Kim, Hongsu;Cho, Byunguk;Park, Sanghyun;Lee, Mukyu;Kim, Changgi;Choi, Jeongho
    • Journal of Korean Society on Water Environment
    • /
    • v.35 no.3
    • /
    • pp.209-223
    • /
    • 2019
  • Broadly speaking, in order to analyze the water quality improvement effects of the implementation of the Total Water Pollutant Management System in the Sapgy-Lake waterways, a reference was made to the [Plans for implementation of the Total Maximum Daily Load(TMDL)] in 3 cities (Cheonan, Asan, Dangjin). The results of the investigation into the plans to reduce the pollutant load show in that region show that there are plans to reduce pollution for a total of 16 reduction facilities. As for the result of the computation of the reduction in the load, these measurements were computed at the Gokgyo-stream basin and Namwon-stream basin, with BOD and T-P at the Gokgyo-stream basin reduced by 13.9 % and 13.3 %, respectively, while BOD and T-P at the Namwon-stream were reduced by 3.7 % and 3.3 %, respectively. In this way, thus using the results of the water quality forecast of Sapgyo-Lake in measures for the improvement of water quality (in accordance with the implementation of the TMDL), and using the QUAL-MEV model and EFDC model, it is noted that BOD will be improved by 26.4 % from 6.1 mg/L to 4.5 mg/L 0.0 %, T-P by 36.7 % from 0.168 mg/L to 0.107 mg/L and TOC by 26.4 % from 7.7 mg/L to 5.6 mg/L. However, it is forecasted that the targeted standards for the medium influence area will not be achieved. Evidently, Gokgyo-stream and Namwon-stream have been implementing the Total Water Pollutant Management System for the BOD items since January 1, 2019, but the Sapgyo-stream and Muhan-stream were excluded from being designated as subject regions. As such, it is noted now that it is necessary to implement the TMDL for the entire Sapgyo-Lake water systems including Sapgyo-stream and Muhan-stream in order to improve the water quality of Sapgyo-Lake, and likewise the T-P should be designated as the substance subjected to management in addition to BOD.

Case analysis of the drought events in Geum river basin with climatic water balance. (기후학적 물수지에 의한 금강유역 가뭄사례 분석)

  • Kim, Joo-Cheol;Ahn, Jung-Min;Lee, Sang-Jin;Hwang, Man-Ha
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2009.05a
    • /
    • pp.1452-1456
    • /
    • 2009
  • Water related disasters frequently occur in these days due to global warming and climatic change. This give us that the trend of mal-distribution of available water resources would be increased and the environment of water resources management getting much worse. Therefore the establishment of the effective strategy should be required for water resources management urgently. In this paper the hydrological characteristics and corresponding social phenomena of the drought events in Geum river basin are inspected in depth. The word, social phenomena, means not the quantitative damage but the qualitative social influences and its main characters are analyzed by the collections of the mass media articles. This study will be helpful in prognosticating the future drought occurrence and the establishment of counterplan to them.

  • PDF

Development of Rainfall-Runoff Model on Han River(I) - Data setting - (한강수계 유역유출 분석 모형 구축(I) - 자료구성을 중심으로-)

  • Maeng, seung-jin;Chanda, trivedi
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2008.05a
    • /
    • pp.784-787
    • /
    • 2008
  • Growing needs for efficient management of water resources urge the joint operation of dams and integrated management of whole basin. As one of the tools for supporting above tasks, this study aims to constitute a hydrologic model that can simulate the streamflow discharges at some control points located both upper and down stream of dams. One of the currently available models is being studied to be applied with a least effort in order to support the ongoing project of KWATER (Korea Water Resources Corporation), "Establishment of integrated operation scheme for the dams in Han River Basin".

  • PDF

Analysis of Small Hydropower Resources for Han River System Using Resource Management System (자원관리시스템을 이용한 한강수계의 소수력자원 분석)

  • Park, Wan-Soon;Lee, Chul-Hyung
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2011.04a
    • /
    • pp.241-245
    • /
    • 2011
  • Small hydropower is one of the many types of new and renewable energy, which South Korea is planning to develop, as the country is abundant in endowed resources. In order to fully utilize small hydropower resources, there is a need for greater precision in quantifying small hydropower resources and establish an environment in which energy sources can be discovered using the small hydropower resource management system. This study has given greater precision to calculating annual electricity generation and installed capacity of small hydropower plants of Han river system by inquiring into average annual rainfall, basin area and runoff coefficient, which is anticipated to promote small hydropower resources utilization. Small hydropower resource management system was also established by additionally providing base information on quantified small hydropower resources and analysis function and small hydropower generator status, rivers, basin, rainfall gauging station, water level gauging station etc.. Small hydropower resource management system can be used gather basic information for positive applications of small hydropower energy nationwide.

  • PDF

Analysis of Small Hydropower Resources for Nakdong River System Using Resource Management System (자원관리시스템을 이용한 낙동강수계의 소수력자원 분석)

  • Park, Wan-Soon;Lee, Chul-Hyung
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2011.11a
    • /
    • pp.354-358
    • /
    • 2011
  • Small hydropower is one of the many types of new and renewable energy, which South Korea is planning to develop, as the country is abundant in endowed resources. In order to fully utilize small hydropower resources, there is a need for greater precision in quantifying small hydropower resources and establish an environment in which energy sources can be discovered using the small hydropower resource management system. This study has given greater precision to calculating annual electricity generation and installed capacity of small hydropower plants of Nakdong river system by inquiring into average annual rainfall, basin area and runoff coefficient, which is anticipated to promote small hydropower resources utilization. Small hydropower resource management system was also established by additionally providing base information on quantified small hydropower resources and analysis function and small hydropower generator status, rivers, basin, rainfall gauging station, water level gauging station etc.. Small hydropower resource management system can be used gather basic information for positive applications of small hydropower energy nationwide.

  • PDF

Water, Energy, and Food Nexus: Preserving Local Resources through Inter-Basin Trade

  • Wicaksono, Albert;Jeong, Gimoon;Kang, Doosun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2018.05a
    • /
    • pp.153-153
    • /
    • 2018
  • Water-Energy-Food (WEF) nexus is a new holistic resources management concept that considers the interconnections among resources for sustainable resources planning and management. The current challenge is to fulfill the required demand in the lack of available resources. A traditional way to provide more available resource is by increase in production, but it caused increment of indirect demand of other interlinked resources. Importing resources from other area (where local supply is redundant) is another option to secure local resources with additional economic expenditure. The WEF nexus-trading model adapts the previously developed nationwide nexus simulation model with additional input parameters and functions to simulate trading scenarios. In general, the analysis starts with the quantification of local resources deficit (potential importing amount) and redundancy (potential exporting amount) of each area. Then, a trade module is initiated by determining possible donor area and importation amount. Finally, the nexus simulation for all area is re-run to determine final resources supply-demand results including the trading amount. The trade option provides an opportunity to meet local demands without draining local resources. However, the production capability of donor area may limit the importation amount. The newly developed trade option allows more alternatives for stakeholders to determine resources management plans.

  • PDF

Assessment of streamflow variation considering long-term land-use change in a watershed

  • Noh, Joonwoo;Kim, Yeonsu;Yu, Wansik;Yu, Jisoo
    • Korean Journal of Agricultural Science
    • /
    • v.48 no.3
    • /
    • pp.629-642
    • /
    • 2021
  • Land-use change has an important role in the hydrologic characteristics of watersheds because it alters various hydrologic components such as interception, infiltration, and evapotranspiration. For example, rapid urbanization in a watershed reduces infiltration rates and increases peak flow which lead to changes in the hydrologic responses. In this study, a physical hydrologic model the soil and water assessment tool (SWAT) was used to assess long-term continuous daily streamflow corresponding to land-use changes that occurred in the Naesungchun river watershed. For a 30-year model simulation, 3 different land-use maps of the 1990s, 2000s, and 2010s were used to identify the impacts of the land-use changes. Using SWAT-CUP (calibration and uncertainty program), an automated parameter calibration tool, 23 parameters were selected, optimized and compared with the daily streamflow data observed at the upstream, midstream and downstream locations of the watershed. The statistical indexes used for the model calibration and validation show that the model performance is improved at the downstream location of the Naesungchun river. The simulated streamflow in the mainstream considering land-use change increases up to -2 - 30 cm compared with the results simulated with the single land-use map. However, the difference was not significant in the tributaries with or without the impact of land-use change.

Development of a Integrated Indicator System for Evaluating the State of Watershed Management in the Context of River Basin Management Using Factor Analysis (요인분석을 이용한 수계 관리 맥락에서 유역관리 상태를 평가하기 위한 통합지수 개발)

  • Kang, Min-Goo;Lee, Kwang-Man;Ko, Ick-Hwan;Jeong, Chan-Yong
    • Journal of Korea Water Resources Association
    • /
    • v.41 no.3
    • /
    • pp.277-291
    • /
    • 2008
  • In order to carry out river basin management, it is necessary to evaluate the state of the river basin and make site-specific measures on the basis of management goals and objectives. A river basin is divided into several watersheds, which are composed of several components: water resources, social and economic systems, law and institution, user, land, ecosystems, etc. They are connected among them and form network holistically. In this study, a methodology for evaluating watershed management was developed by consideration of the various features of a watershed system. This methodology employed factor analysis to develop sub-indexes for evaluating water use management, environment and ecosystem management, and flood management in a watershed. To do this, first, the related data were gathered and classified into six groups that are the components of watershed systems. Second, in all sub-indexes, preliminary tests such as KMO (Kaiser-Meyer-Olkin) measure of sampling adequacy and Bartlett's test of sphericity were conducted to check the data's acceptability to factor analysis, respectively. Third, variables related to each sub-index were grouped into three factors by consideration of statistic characteristics, respectively. These factors became indicators and were named, taking into account the relationship and the characteristics of included variables. In order to check the study results, the computed factor loadings of each variable were reviewed, and correlation analysis among factor scores was fulfilled. It was revealed that each factor score of factors in a sub-index was not correlated, and grouping variables by factor analysis was appropriate. And, it was thought that this indicator system would be applied effectively to evaluating the states of watershed management.