• 제목/요약/키워드: B 계통

검색결과 874건 처리시간 0.026초

대정전 계통 복구를 위한 시송전 선로에 관한 연구 (A Study on transmission lines energized initially to restore wide black out Power system)

  • 이흥재;김균도;박성민;배주천;황봉환;홍순천;김기동;이남호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 하계학술대회 논문집 A
    • /
    • pp.377-379
    • /
    • 2001
  • When a wide area blackout occurres, reenergizing transmission lines should be done at first. The KEPCO(Korea Electric Power Corporation) divides whole power system grid into seven subsystem, and each subsystem has one of two blackstart power plants which are usually hydro or combined-combustion type, one priority power plant which should be first supplied with electric energy, and transmission lines between them. Voltage rising, line charging, and operation stability problem should be considered when these lines are reenergized. In this paper, building-up process for primary transmission system that should be energized at first is analyzed.

  • PDF

분배계통에 따른 지하주차장 환기설비 성능의 예측

  • 김경환;이재헌;오명도;김종필
    • 설비공학논문집
    • /
    • 제13권10호
    • /
    • pp.982-992
    • /
    • 2001
  • In this paper, the performance of ventilation equipments in enclosed parking garages were investigated for several air distribution systems by numerical method. Air change effectiveness of the non-mixing system was 0.42. It meant that more supply air as much as the design supply air was needed to maintain good indoor air quality. In the high speed nozzle ventilating system which is most expensive one, air change effectiveness was 0.54. Therefore this system satisfied to ventilation design. In the jet fan ventilating systems, air change effectiveness for jet fan ventilating system-A with 18 jet fans and jet fan ventilating system-B with 6 jet fans in circulation mixing arrangement were 0.565 and 0.42 respectively. Jet fan ventilating system-C with 6 jet fans in transport mixing arrangement was 0.535. Jet fan ventilating system-A and jet fan ventilating system-C met the ventilation design. But velocity in jet fan ventilating system-A was over 2.0m/s which is inappropriate in human comfort. Therefore this system is not proper to ventilation. Jet fan ventilating system-C was the optimum one for enclosed parking garages among 5 systems examined in this paper.

  • PDF

전력계통 고장복군 교육 시스템에 관한 연구 (A study on the power system restoration simulator)

  • 이흥재;김종문;이경섭;박성민;송인준;이남호;배주천;황봉환
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 A
    • /
    • pp.181-183
    • /
    • 2003
  • This paper presents an operator training simulator for power system restoration against massive black-out. The system is designed especially focused on the generality and convenient setting up for initial condition of simulation. The former is accomplished by using on line calculation methodology, and PSS/E data is used to define the initial situation. The proposed simulator consists of three major components - the Power flow(PF) module, data conversion(CONV) module and CUI subsystem. PF module calculates power flow, and then checks overvoltage of buses and overflow of lines. CONV module composes an Y-Bus array and a data base at each restoration action. The initial Y-Bus array is constructed from PSS/E data. The user friendly GUI module is developed including graphic editor and built-in operation manual. As a result, the maximum processing time for one step operation is 15 seconds, which is adequate for training purpose. Comparison with PSS/E simulation proves the accuracy and reliability of the training system.

  • PDF

저압배선계통에서 직렬아크의 검출에 관한 연구 (A Study on the Series Arc Detection in Low-voltage Wiring Systems)

  • 김일권;박대원;최수연;박찬용;김황국;길경석
    • 한국전기전자재료학회논문지
    • /
    • 제21권2호
    • /
    • pp.182-187
    • /
    • 2008
  • This paper dealt with the detection algorithm of series arcing, which is a cause of electric fires in low-voltage wiring systems. To find the distinguished electrical features of series arc, we simulated series arcing by the arc generator specified in UL1699. An electric heater, an inverter-controlled vacuum cleaner, and a phase-controlled incandescent lamp were used as loads to generate series arcing. A high-pass filter (HPF) with the low cut-off frequency of 3 kHz at -3 dB was fabricated and applied to separate the series arc signal from the AC voltage source. The experiment showed that the high frequency signal generates randomly during series arcing, and the phase-controlled incandescent lamp produces high frequency pulses even in normal state. In this case, the magnitude, the width, and the randomness of high frequency signal should be analyzed to estimate series arcing precisely.

KSTAR 초전도자석계통 개발현황 (Present Status of the KSTAR Superconducting Magnet System Development)

  • 박현기;김기만;박갑래;임병수;이상일;정우호;추용;백설희
    • 한국초전도저온공학회:학술대회논문집
    • /
    • 한국초전도저온공학회 2003년도 추계학술대회 논문집
    • /
    • pp.298-300
    • /
    • 2003
  • The KSTAR superconducting magnet system consists of 16 TF (Toroidal Field) and 14 PF (Poloidal Field) coils. Both of the TF and PF coil system use internally-cooled Cable-In-Conduit Conductors (CICC). The major achievement in KSTAR magnet system development includes the development of CICC, the development of a full size TF model coil, the development of a background magnetic field generation coil system, the construction of a large scale superconducting magnet. TF and PF coils are in the stage of the fabrication for the KSTAR completion in the year 2005.

  • PDF

변동 제주 SMP를 적용한 제주도 육상풍력단지의 경제성 재평가 (Reassessment of Economic Feasibility for a Wind Farm on Jeju Island Considering Variable Jeju SMP)

  • 김효정;고경남;허종철
    • 한국태양에너지학회 논문집
    • /
    • 제33권5호
    • /
    • pp.41-50
    • /
    • 2013
  • Economic feasibility study using weighted average variable Jeju System Marginal Price, SMP, was conducted for Gasiri wind farm of Jeju Island. To predict the variable Jeju SMP, generator share ratio for SMP was calculated from the real time wind power production and the power demand data for years. Also, sensitivity analysis on Net Present Value, NPV, and Benefit/Cost Ratio, B/C ratio, were performed to clarify which factors are more important in assessing economic feasibility. The result shows that the Gasiri wind farm has a minimum of 110 billion won and a maximum of 132 billion won difference between fixed and variable SMP. Also, Capacity Factor, C.F., had the highest sensitivity for NPV, followed by SMP. Accordingly, when economic analysis for a potential wind farm site is carried out, the variable SMP as well as C.F. should be considered for more accurate assessment of the wind farm.

400kV XLPE 케이블 및 부속재 개발 (Development of 400kV XLPE Cable and Accessories)

  • 신희덕;남정세;최영훈;최봉남;김화종;송재혁
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 C
    • /
    • pp.2268-2270
    • /
    • 2005
  • 전력계통분야에서 송전전압의 초고압화는 꾸준히 연구가 진행되는 과제중의 하나이다. 국내에서는 당사가 참여한 한전(KEPCO)의 영서${\sim}$ 영등포 345kV XLPE 지중T/L 건설공사가 2003년 6월 20일 국내 최초로 준공된 이후 현재까지 아무런 문제없이 운전중에 있으며, 향후 그 수요가 꾸준히 증대될 것으로 예상되고 있다. 전 세계적으로 살펴보더라도 400KV급 XLPE 케이블 및 부속재에 대한 수요가 꾸준히 확대되고 있다. 그러므로, 당사에서는 국내에서 345KV 케이블 및 부속재를 개발한 기술력을 바탕으로, 한 단계 업그레이드된 해외시장에서 세계의 업체들과 경쟁하기 위해, 400KV 2500sq.mm XLPE 케이블 및 부속재를 성공적으로 개발하였다. 이에 관해 소개하고자 한다.

  • PDF

PWM 컨버터를 이용한 계통연계형 태양광발전 시스템 (A Utility Interactive Photovoltaic Generation System Using PWM Converter)

  • 정정훈;조정민;전기영;이승환;오봉환;김성남;김용주;한경희
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 B
    • /
    • pp.1253-1255
    • /
    • 2003
  • Since the residential load is an AC load and the output of solar cell is a DC Power, the photovoltaic system needs the DC/AC converter to utilize solar cell. In case of driving to interact with utility line, in order to operate at unity power factor, converter must provide the sinusoidal wave current and voltage with same phase of utility line. Since output of solar cell is greatly fluctuated by insolation. it is necessary that the operation of solar cell output in the range of the vicinity of maximum power point. In this paper DC/AC converter is three phase PWM converter with smoothing reactor. And then, feedforward control used to obtain a superior characteristic for current control and digital PLL circuit used to detect the phase of utility line.

  • PDF

한국전력 송전 계통보호를 위한 웹 서버 개발 (THE DEVELOPMENT OF WEB SERVER FOR KOREAN ELECTRICAL DISTRIBUTION-SYSTEM PROTECTION)

  • 장여;최면송;이승재;민병운;김성훈;오성민
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.178-180
    • /
    • 2003
  • Since faults often occur on power system, relay protection has become an important part to protect the equipments of power system efficiently and safely. Database can store the data about the relay protection efficiently, and these data must be shown to users through the web. Proset2000(an overall program system to protect power system) can realize this function in some measure, but it needs to be developed. This paper is about the further development of Proset2000. In this paper, web of Proset2000 is made by ASP programming technology, and users can browse and search the useful data through the web. There are some new functions, such as the summary of setting values, the message board and the management of administrator.

  • PDF

원전 완전전원상실 사고에 대한 전력계통 특성평가 (A Evaluation on the Characteristics of Electrical Power System for the Station Blackout Events)

  • 오성헌;주운표;류부형;정윤형;김대일;임장현;김건중
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1993년도 하계학술대회 논문집 A
    • /
    • pp.140-143
    • /
    • 1993
  • Station Blackout(SBO) event means the complete loss of alternating current(AC) electrical power to the essential & nonessential switchgear buses in a nuclear power plants. Since many safety systems in nuclear power plants depend upon alternative current power, the SBO event could be an important contributor to damage of reactor core. Therefore, the SBO events have been considered as a very important safety issues in a nuclear power plants. In this paper, as evaluating the design characteristics of offsite & emergency power systems, an acceptable minimum SBO duration is calculated. And it is presented that the design method for alternative AC(AAC) sources to cope with the SBO events.

  • PDF