• Title/Summary/Keyword: Available-to-Promise (ATP)

Search Result 17, Processing Time 0.021 seconds

-CTP System Study for Customer Reliability Improvement through Due date Promising- (납기확약을 통해 고객 신뢰성 향상을 도모하기 위한 CTP 시스템에 관한 연구)

  • Oh Sung Hwan;Park Young Ki;Kang Kyong Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.6 no.3
    • /
    • pp.121-130
    • /
    • 2004
  • This Study will introduce the concept of CTP(Capable-to-Promise) Algorithm, CTP process, and the modeling of algorithm. This research is based on the environment of using Job-Shop method. CTP algorithm model use LPST(Latest Possible Start Time) and EPST(Earliest Possible Start Time) method especially. It is important part of executing CTP system. The CTP modeling and implementing develops to system which is able to implement in the various business environment through additional and continuous research.

An Order Promising Procedure for Simulation-Based Scheduling Systems (시뮬레이션에 기초한 일정계획 시스템에서의 납기산정 절차)

  • 박문원;최성훈;이근철;김영대
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2002.05a
    • /
    • pp.103-108
    • /
    • 2002
  • 본 연구는 주문형 반도체 생산공장이나 인쇄회로기판 제조공장과 같이 매우 다양한 제품들을 주문에 의해 생산하며 제조공정이 매우 길고 복잡한 생산 시스템에 대하여 다룬다. 이러한 생산 시스템은 그 특성상 APS (Advanced Planning and Scheduling)의 일정계획(scheduling) 모듈로서 시뮬레이션(simulation)이 유일한 대안이 되는 경우가 발생할 수 있다. 시뮬레이션 기법은 복잡한 상황도 대부분 묘사가 가능하기 때문에 사실적이고 실현 가능한 일정계획을 생성할 수 있다는 장점이 있는 반면 수행시간이 상당히 길다는 단점이 있다. 기업이 경쟁력을 가지기 위해서는 고객이 의뢰한 주문에 대하여 가능 납기(가능한 생산완료 시점)를 빠른 시간 내에 정확히 알려주어야만 한다. 따라서, APS 역시 "즉시 납기산정, 정시 납품:(commit now, deliver on time)을 캐치프레이즈(catch phrase)로 한다. 하지만 시뮬레이션은 :정시 납품:이 가능한 납기를 산정할 수 있을지는 모르지만 "즉시 납기산정"이 불가능하다. 따라서, 본 연구에서는 시뮬레이션에 근거한 일정계획 모듈을 가지고 있는 APS 시스템에서 납기산정을 빠르고 정확하게 할 수 있는 방법론을 제시한다. 이 방법론은 기존의 MRP Ⅱ 및 ERP 시스템에서 행하던 ATP (available to promise) 흑은 CTP (capable to promise) 기법과 차별화 되며, 의뢰한 주문의 생산착수 시점과 제조 리드타임을 합리적이고 신속하게 산출한다.

  • PDF

A Study on Strategic Allocation Algorithm to Make Sales Plan (판매계획 수립을 위한 전략적 할당 알고리듬에 대한 연구)

  • Kang, Chul-Won;Won, Dae-Il;Kim, Sung-Shick
    • IE interfaces
    • /
    • v.16 no.2
    • /
    • pp.117-124
    • /
    • 2003
  • This study focuses on the detailed explanation of the strategic allocation algorithm which can be used as an ATP(Available To Promise) from the perspective of customers, and as a sales plan for sales organizations. A strategic allocation algorithm includes three methods depending on FIXED RATIO, RANK and DEMAND BASIS. In addition, further topics would be discussed regarding the method of system implementation utilizing strategic allocation algorithms and information flow with an aim to integrate such a sales plan into the e-Biz. This study aims to provide a new solution in order to secure emerging competitive factors in today's enterprise world; that is, an achievement of faster business processes. It is suggested that this new solution be implemented in order to achieve an efficient business environment by systemizing the decision making process which in the past was manually conducted.

Real-time Delivery Estimation in Build-to-order Manufacturing (주문형 생산에서의 실시간 납기 산정)

  • 홍태영;강무진;박세형;이상봉
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2002.10a
    • /
    • pp.101-104
    • /
    • 2002
  • Leading companies have embraced the new economy with new and innovative BTO models. Instead of conventional company-oriented manufacturing scheduling, customer-oriented scheduling method attracts more and more attention. To evaluate the delivery of customer order in advance, the real production capacity as well as procurement lead time should be taken into account. This paper describes a quasi-real-time order delivery estimation system using TOC(Theory of Constraints) based scheduling method.

  • PDF

On-time Production and Delivery Improvements through the Demand-Lot Pegging Framework for a Semiconductor Business (반도체 산업에서 생산용량을 고려한 오더-로트 페깅기반의 납기약속 방법의 정합성 향상에 대한 연구)

  • Seo, Jeong-Cheol;Bang, June-Young
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.37 no.4
    • /
    • pp.126-133
    • /
    • 2014
  • This paper addresses order-lot pegging issues in the supply chain of a semiconductor business. In such a semiconductor business (memory or system LSI) order-lot pegging issues are critical to achieving the goal of ATP (Available to Promise) and on-time production and delivery. However existing pegging system and researches do not consider capacity limit on bottleneck steps. This paper presents an order-lot pegging algorithm for assigning a lot to an order considering quality constraints of each lot and capacity of bottleneck steps along the entire FAB. As a result, a quick and accurate response can be provided to customer order enquiries and pegged lot lists for each promised orders can be shown transparently and short or late orders can be detected before fixing the order.

A scheduling management system (SMS) using order review and release (ORR) for small & medium sized mold & die makers (ORR(Order Review and Release)을 이용한 중${\cdot}$소 사출금형업체 일정계획시스템 개발)

  • Gil, Guk-Ho;He, Jin-Feng;Kim, Dong-Won
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2004.05a
    • /
    • pp.620-623
    • /
    • 2004
  • Conventionally injection molds & dies are manufactured through an order-oriented manner. This brings unexpected orders into the shop floor such as hot order, re-work, and new types of mold & dies. Thus, there needs appropriate resource assignment plans considering the available times of machines and workers. Further, a scheduling system is required that can create work schedules periodically or by customers' requests. Yet, in small & medium sized mold & die makers, production schedules usually depend on the shop floor workers' experience and their manual preparation. Hence, developed in this study is a scheduling management system (SMS) based on order release and review (ORR) in small and medium sized mold & die companies. The proposed SMS considers delivery dates as well as flexible work schedules, so as to meet frequent changes of customers' order. The system can provide effective resource assigning and work scheduling plans, securing standard data associated with shop floors. Furthermore, the system pursues economical schedules for companies' needs, equipped with an available to promise (ATP) function that can effectively accommodate the changes of production plans.

  • PDF

Design of Advanced Planning System for Supply Chain Management Supporting ATP(Available To Promise) (납기 회답 지원 SCM을 위한 생산 계획 모델의 설계(조립/가공 산업 중심))

  • Bae Joonsoo;Han Jake
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2002.05a
    • /
    • pp.371-377
    • /
    • 2002
  • 근래 정보 시스템의 흐름은 생산 분야의 관리뿐만 아니라, 고객과의 관계를 중시하는 CRM(Costumer Relation Management)과 공급업체와의 협업 관계를 유지하는 eProcurement시스템에 초점을 맞추고 있다. 즉, 기존에는 단위 생산 시스템의 관리에 중점을 두었지만 최근에는 그 외부 요소들에 대한 관리의 중요성을 인식하게 되었고 이를 통징하여 공급망 관리(SCM Supply Chain Management)라고 한다. 본 논문에서는 공급망 관리에서 필요한 생산 계획수립 문제에 대해서 살펴본다. 특히 고객과의 관계에서 중요한 기능인 납기 회답을 지원하는 생산 계획 수립의 실행 주기에 대해서 살펴본다. 첫째, 단위 생산 시스템에서 사용하는 작업지시(Work Order)와 구매 지시(Purchase Order)를 생성하는 정규계획 모델에 대해서 설명한다. 정규계획 모델에서 필요로 하는 정적 정보와 동적 정보의 수집 및 계획의 실행을 담당하는 ERP 시스템과의 관계에 대해서 정의하고 정규계획 모델의 운영 주기를 정의한다. 둘째, 정규계획 모델과 상호 협조하면서 납기 회답을 지원하는 납기회답 모델의 설계에 대해서 살펴본다. 정규계획 모델과 달라지는 입력 부분의 정의와 정규계획 모델과의 상호 관계를 정의한다. 다음으로, 정해진 납기를 지키기 위해서 정규계획 모델에서 고려래야 하는 요소에 대해서 알아본다. 가장 중요한 것으로 작업 부하와 생산 용량을 고려한 계획 일자(PST)와 고객 납기와 제조 공정 LT를 고려한 계획 일자(LPST)중 최소값을 원자재의 납기 일자로 사용하는 것을 제안한다. 동시에 신규 구매 지시 계획을 생성하기보다는 기존에 발생된 구매 지시의 우선적 사용과 기존 구매 지시의 납기 일자를 고객 납기에 가장 잘 맞출 수 있도록 변경하는 방안을 제시한다. 이렇게 함으로써 최대한 고객 납기를 만족하도록 계획을 수립할 수 있게 된다. 본 논문에서 제시하는 계획 모델을 사용함으로써 고객 주문에 대한 대응력을 높일 수 있고, 계획의 투명성으로 인한 전체 공급망의Bullwhip effect를 감소시킬 수 있는 장점이 있다. 동시에 이것은 향후 e-Business 시스템 구축을 위한 기본 인프라 역할을 수행할 수 있게 된다.

  • PDF