• Title/Summary/Keyword: Available Safety Egress Time (ASET)

Search Result 15, Processing Time 0.016 seconds

A Study on Evacuees Risk Assesment for Application of Spatial Risk Information (공간위험정보를 적용한 대피자 위험성평가에 관한 연구)

  • Hong, Seungbum;Jang, Jae-Soon;Park, Hyun-A;Rie, Dong-Ho
    • Fire Science and Engineering
    • /
    • v.29 no.2
    • /
    • pp.8-12
    • /
    • 2015
  • Performance Based Design is evaluating after each calculatiuon ASET and RSET. Risk informaion values such as heat, smoke, toxic gas etc are extracted by FDS in this study. These Risk informaion values by FDS apply Artisoc (evacuation simulator). Building structure made $60m{\times}65m$, exit number is made 2 positions and people in this building are 50 ramdonly. 20 times (case1~case 20) simulated and analysis evacuees risk by evacuated route positions.

A Study on Comparison of Life Safety Assessment Results according to Three Coupling Methods of Fire and Evacuation Simulation (화재·피난시뮬레이션의 커플링방식별 인명안전성평가 결과 비교에 관한 연구)

  • Koo, Hyun-Mo;Oh, Ryun-Seok;An, Sung-Ho;Hwang, Chul-Hong;Choi, Jun-Ho
    • Fire Science and Engineering
    • /
    • v.33 no.1
    • /
    • pp.121-129
    • /
    • 2019
  • In Korea, life safety assessment through simulation are mandatory in performance-based design. Generally, there are three types of methods for simulation-based life safety assessments: the non-coupling method that compares available safe egress time (ASET) and required safe egress time (RSET) at a specific point through conducting fire and assessment simulations independently; the semi-coupling method that compares fire and evacuation simulation results by overlaying the result screens; and the coupling method that compares the results of fire effect simulation to an evacuation simulation. Of these methods, all designers in South Korea have used the only non-coupling method. In the non-coupling method, it is important to determine the location of a specific point to compare ASET and RSET. However, without any defined regulation, setting the location is determined based on the designer's experience and knowledge. The number of specific locations and the locations themselves differ with each designer, which can produce contrasting results in a life safety assessment. Therefore, this study conducted a life safety assessment based on the three methods (non-coupling, semi-coupling and coupling) and compared each of the results. Furthermore this study suggests a improvement way in particular for the computer simulation.

Evaluation of Design Fire Curves for Single Combustibles in a Cinema Complex (복합영상관 단일 가연물의 디자인 화재곡선 평가)

  • Jang, Hyo-Yeon;Hwang, Cheol-Hong;Oh, Chang Bo;Nam, Dong-Gun
    • Fire Science and Engineering
    • /
    • v.34 no.3
    • /
    • pp.18-27
    • /
    • 2020
  • An actual fire test was performed on single combustibles placed in a local cinema complex, and quantitative differences in the maximum heat release rate (HRR) and fire growth rate were investigated based on the design fire curve methods (i.e., the general and 2-stage methods). In terms of combustible use and fire load, a total of 12 combustibles were selected, classified into cinema lounge and movie theater. It was found that the maximum HRR and fire growth rate determined using the two-stage method were quantitatively different from those of the general method. The application of the two-stage method, which can be used to determine the fire growth rate of the initial fire stage more precisely, could be useful in accurately predicting the activation time of fire detectors and fire-extinguishing facilities, as well as the available safe egress time (ASET) and required safe egress time (RSET).

Analysis of RSET According to Exit Installation Standards for the Exterior of a Food Manufacturing Plant Building (식품공장 건축물 바깥쪽으로의 출구 설치기준에 따른 RSET 분석)

  • Park, Ha-Soung;Lee, Jae-Wook;Kong, Ha-Sung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.10 no.2
    • /
    • pp.201-208
    • /
    • 2024
  • In this study, we investigated whether the evacuation time according to the exit installation standards specified in the building code during a food factory fire is compatible with the evacuation time based on the performance-based design specified by the fire department, in order to determine if evacuation safety is ensured. We used the Pathfinder program to confirm the evacuation time, and experimented with three scenarios for exit installation standards towards the outside of the building: 60m, 80m, and 100m. The target building in the experiment corresponded to the building code's exit installation standard of 100m from each dwelling. The experimental results showed tt in the cases of 80m and 100m, ASET exceeded RSET, indicating tt evacuation safety was not ensured, while in the case of 60m, evacuation safety was maintained. Through this study, it was confirmed tt even when the exit installation standards towards the outside of the building are met, evacuation safety may not be guaranteed.

Application Plan of Exhaust Systems in Strengthening Evacuation Safety in Apartment Houses (공동주택의 피난안전성 강화를 위한 배기시스템 활용 방안 연구)

  • Lee, Hyun-Sang;Yoon, Myung-Oh;Lee, Young-Ju;Kim, Jeong-Joon
    • Fire Science and Engineering
    • /
    • v.34 no.3
    • /
    • pp.49-57
    • /
    • 2020
  • Apartment buildings are becoming taller and more densely populated with the advancements in science and the development of cities, Consequently, various amenities and safety facilities are being developed to improve the quality of life for residents. However, according to statistics, the number of casualties in apartments accounts for a high proportion of accidents, and the leading cause of the casualties is smoke emitted from fires while sleeping at night. Although it is best to install separate indoor facilities in apartments to minimize smoke damages to occupants, it is useful to minimize the smoke damages by utilizing the installed facilities while reducing the financial burden of occupants. Based on the review, the heat exchanger ventilation system and the kitchen collective exhaust system were selected, and the feasibility of these systems was verified through fire simulation. From the verification results, the available safe egress time improved by 27, 30, and 35 s on the 25th, 35th, 50th floors, respectively.