• 제목/요약/키워드: Automation in Construction

Search Result 557, Processing Time 0.029 seconds

Reliability Analysis and Utilization of BIM-based Highway Construction Output Volume (BIM기반 고속도로 공사 물량산출 신뢰성 검토 및 활용)

  • Jung, Guk-Young;Woo, Jeong-Won;Kang, Kyeong-Don;Shin, Jae-Choul
    • Journal of KIBIM
    • /
    • v.3 no.3
    • /
    • pp.9-18
    • /
    • 2013
  • In case of applying the BIM method in the civil engineering of irregularly shaped structure, BIM method began to be introduced in the current building engineering area compared with the expected effects of the relatively high construction productivity has been recognized. In this paper, I have developed quantity calculation algorithms applying it to earthwork and bridge construction, tunnel construction, retaining wall construction, culvert construction and implemented BIM based 3D-BIM Modeling quantity calculation. Structure work in which errors occurred in range between -6.28% ~ 5.17%. Especially, understanding of the problem and improvement of the existing 2D-CAD based of quantity calculation through rock type quantity calculation error in range of -14.36% ~ 13.07% of earthwork quantity calculation. It's benefit and applicability of BIM method in civil engineering. In addition, routine method for quantity of earthwork has the same error tolerance negligible for that of structure work. But, rock type's quantity calculated as the error appears significantly to the reliability of 2D-based volume calculation shows that the problem could be. Through the estimating quantity of earthwork based 3D-BIM, proposed method has better reliability than routine method. BIM, as well as the design, construction, maintenance levels of information when you consider the benefits of integration, the introduction of BIM design in civil engineering and the possibility of applying for the effectiveness was confirmed. In addition, as the beginning phase of information integration, quantity document automation program has been developed for activation of BIM. And automatically enter the program code number, linkage and manual volume calculation program, quantity document automation programs, such as the development is now underway, and step-by-step procedures and methods are presented.

Development of Automation Technology for Structural Members Quantity Calculation through 2D Drawing Recognition (2D 도면 인식을 통한 부재 물량 산출 자동화 기술 개발)

  • Sunwoo, Hyo-Bin;Choi, Go-Hoon;Heo, Seok-Jae
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.227-228
    • /
    • 2022
  • In order to achieve the goal of cost management, which is one of the three major management goals of building production, this paper introduces an approximate cost estimating automation technology in the design stage as the importance of predicting construction costs increases. BIM is used for accurate estimating, and the quantity of structural members and finishing materials is calculated by creating a 3D model of the actual building. However, only 2D basic design drawings are provided when making an estimating. Therefore, for accurate quantity calculation, digitization of 2D drawings is required. Therefore, this research calculates the quantity of concrete structural members by calculating the area for the recognition area through 2D drawing recognition technology incorporating computer vision. It is judged that the development technology of this research can be used as an important decision-making tool when predicting the construction cost in the design stage. In addition, it is expected that 3D modeling automation and 3D structural analysis will be possible through the digitization of 2D drawings.

  • PDF

A study of Operation Criteria of Tower-crane for Automatic Transportation Considering Swung Member (양중작업 자동화를 위한 부재진동에 따른 타워크레인의 작업가능 기준 연구)

  • Shin, Yoon-Seok;Jin, Il-Guan;An, Sung-Hoon;Cho, Hun-Hee;Kang, Kyung-In
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.108-116
    • /
    • 2008
  • At present, construction automation is a critical solution for the shortage of labor and the aging of skilled workers. Especially, researches for transportation automation are achieved to improve the efficiency as the construction of tall-building construction. Transportation automation needs to control the swung member by the inertia and/or the wind-force at the end of cable. However, previous to control, the presupposition of the swing is heavily difficult work because the inertia and the wind force are irregularly changable according to work condition. Therefore, in this study, dynamic modeling of crane and simulation was performed to find the characteristic of the swing. In the result, the maximum displacement of the swung material was analyzed. And, on the basis of analysis, the criteria to decide workability of automated transportation considering the material size and the wind force onsite was proposed.

A Development of Prototype Design Automation System for Standard Connections Using High-Strength Bolts based on BIM (BIM 기반의 고력볼트 마찰접합부 설계자동화 시스템의 프로토타입 구축)

  • Eom, Jin-Up;Shin, Tae-Song
    • Journal of Korean Society of Steel Construction
    • /
    • v.23 no.5
    • /
    • pp.637-646
    • /
    • 2011
  • This study is related to the development of a design automation system for the construction design phase of steel structures. The system intended for beam splice friction connections using high-strength bolts. The standard design method and standardization principles that are suggested in the design manual for standard connections using high-strength bolts published by the Korean Society of Steel Construction(KSSC) were reviewed. A structural analysis algorithm was formulated from the review. A design automation system that can automatically calculate the structural design of connections and automatically generate the connection model without separate inputs was developed. To verify the validity of the developed system, its results were compared with the date in the table for the connection design in the Design Manual. The development system was also applied to the sample model. Then the structural design results were compared with the properties of the connection models and drawings created from the results.

3D-based Earthwork Planning and CO2 Emission Estimation for Automated Earthworks (자동화 토공을 위한 3D 토량배분과 탄소발생량 추정)

  • Kim, Sung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.3
    • /
    • pp.1191-1202
    • /
    • 2013
  • The former researches on earthwork automation were mainly focused on GPS and sensor application, environment modelling, equipment path planning, work information management, and remote control etc. Recently, reducing $CO_2$ emission becomes one of main focuses for an automation research. In the case of earthwork operations, many kinds of construction machines or robots are involved, which can cause high level of $CO_2$ in a construction site. An effective earthwork plan and construction machine operation can both increase productivity and safety and decrease $CO_2$ emission level. In this research, some automation concepts for green earthworks are suggested such as a 3D construction site model, a 3D earthwork distribution based on two different earthwork methods, and an earthwork package construction method. A excel-based simulator is developed to generate the 3D earthwork distribution and to estimate the level of $CO_2$ emission for the given earthwork.

An algorithm of marking line correction for robot-based layout automation of building structures

  • Lim, Hyunsu;Kim, Taehoon;Cho, Kyuman;Kim, Taehoon;Kim, Chang-Won
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.312-318
    • /
    • 2022
  • Robot-based layout automation has been recently promoted for the purpose of improving productivity and quality. Marking robots have various functional demands to secure marking precision and environmental adaptability. In particular, in order to automate marking work of building structure, correction of the marking line through position recognition of rebars placed is required. Because the rebars must maintain a constant cover thickness from the formwork surface, if the rebars are out of planned position, the rebar or marking line need to be corrected to secure the cover thickness. Thus, the marking robot for structural work needs to have the function for determining the position correction of the rebar or the marking line. In order to judge the correction of marking line, it is required to measure the distance between the planned marking line and the rebar placed. Therefore, this study proposes an algorithm that can measure the distance between the planned line and the rebar, and correct marking line for the automatic operation of the marking robot. The results of this study will be utilized as a core function for unmanned operation of the marking robot and contribute to securing precise marking by reflecting construction errors.

  • PDF

Development of Component Design Process for Automated Construction System (시공 자동화 시스템에 적합한 부재 디자인 프로세스 개발)

  • Jin, Il-Guan;Shin, Yoon-Seok;Cho, Hun-Hee;Kang, Kyung-In
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.76-86
    • /
    • 2009
  • Recently automated construction system is attended in construction domains because of the increase of aged workers and the shortage of the experienced. So, the proportion of automated construction in Korea is expected to be getting higher from partially automated robots to full automation systems. However, it is difficult for the automated system to operate flexibly like the human based on various work condition. In the result, the higher the level of automation in the system is, the less efficient the automated system work in the site. So, it's necessary the development component design to compensate for the flexibility shortage of the system. Therefore, this study proposes the development process to component design suitable for automated construction system using QFD technique.

A Study on 3D Geospatial Information Model based Influence Factor Management Application in Earthwork Plan (3차원 지형공간정보모델기반 토공사 계획 및 관리에 미치는 영향요인 관리 애플리케이션 연구)

  • Park, Jae-woo;Yun, Won Gun;Kim, Suk Su;Song, Jae Ho
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.22 no.2
    • /
    • pp.125-135
    • /
    • 2019
  • In recent years, the digital transformation age represented by the "Fourth Industrial Revolution", which is a universalization of digitalization across all industries, has become a reality. In the construction sector in 2018, the Ministry of Land, Infrastructure and Transport established the Smart Construction 2025 vision and established the 'Smart Construction Technology Roadmap' aiming to complete construction automation by 2030. Especially, in the construction stage, field monitoring technology using drones is needed to support construction equipment automation and on-site control, and a 3D geospatial information model can be utilized as a base tool for this. The purpose of this study is to investigate the factors affecting earthworks work in order to manage changes in site conditions and improve communication between managers and workers in the earthworks plan, which has a considerable part in terms of construction time and cost as a single type of work. Based on this, field management procedures and applications were developed.

Development of Construction Site Access Management Automation System based on Hand Vascular Pattern

  • Gu Taek Kim;Ji Woong Yeom;Kyong Hoon Kim;Choong Hee Han;Jae Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.499-505
    • /
    • 2009
  • Along with the changing pattern that the construction project is getting complicated, large-scaled and up-to-dated, necessity of efficient management of manpower and resources of the construction site is being increased. In particular, considering that the construction site requires a lot of labor force and in terms of the construction cost, labor cost shares 30-40%, labor management has become a very important factor. In this study, in order to support a stable and successful construction project implementation and supplement the existing system being utilized at the current site, construction site access management automation system based on hand vascular pattern, a biometrics system, is intended to be developed. Relevant theory for the system development and the problem of existing RFID system were evaluated and based on this findings, a system design and DB composition chart were envisaged. In addition, by applying this developed system to a number of sites, its result was analyzed

  • PDF

APPLICATION OF KNOWLEDGE MANAGEMENT IN BUILDING AUTOMATION SYSTEM: A CASE STUDY OF SIX BUILDINGS IN KUALA LUMPUR

  • Nurul Afida Isnaini Janipha;Hamimah Adnan;Fadzil Hassan
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.672-683
    • /
    • 2007
  • The rapid development of Kuala Lumpur has seen numerous new and high-rise buildings introducing Building Automation System (BAS). Whilst effective application of Knowledge Management (KM) within BAS is the pre-requisite for the achievement of optimum BAS performance, there has been little research undertaken to investigate if have been the case. This paper presents a research undertaken to get a view of how KM applies in BAS in six (6) selected case-study buildings in Kuala Lumpur, all operating with the 'one-system' M&E workstation control BAS. The emergent findings positively suggest that adequate KM approaches were employed within their BAS management processes, but further studies would be necessary to determine the extent of their application and effectiveness.

  • PDF