• Title/Summary/Keyword: Automatic measuring system

Search Result 356, Processing Time 0.029 seconds

Implementation of an Automated In-line Water Quality Measurement System of Recirculation Fish Farm with IoT (IoT에 의한 순환여과식 양식장 자동 수질 측정 시스템 구현)

  • Kim, Sun-Woo;Choi, Yeon-Sung
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.12 no.3
    • /
    • pp.477-484
    • /
    • 2017
  • In the conventional recirculation fish farms, there is a lot of difficulties due to lack of professional manpower and high reliance on imported measurement equipment. In this paper, we implement an automatic water quality measurement system which can measure the pollution degree in a water tank of fish farms using an optical sensor(pH, DO) with the IoT technology. The problem with existing systems is that the fish tank should be checked by means of human, or put the measuring equipment into the water tank of fish farms and measurement directly. But, it has a bad influence on the growth of fish. In this paper, we propose a method of indirect measurement without immersing the measurement equipment in a water tank of fish farm and develop a sustainable measurement system in an environment containing salt and lots of pollutants without affecting the growth of fish within the water tank of fish farms.

A Study on the Pattern of Custom-Made Girdles for Obese Women (비만여성의 일대일 맞춤거들 패턴에 대한 연구)

  • Nam, Yun-Ja;Lee, Jun-Ok
    • Journal of the Ergonomics Society of Korea
    • /
    • v.21 no.2
    • /
    • pp.71-86
    • /
    • 2002
  • This study's purpose is to gain basic data for the factory automation of manufacturing custom-made girdles. For this study , obese women in their 30s and 40s was experimented through direct measuring and by the 3D scanner, by means of which the proportions of the subject's body was measured. Based upon the results of this experiment, individually designed girdles were made. In order to gain the basic data for the factory automation of manufacturing custom-made girdles, the patterns and the clothing pressure and the feeling of wearing such girdles were analyzed. This study can be summarized as follows: The material properties and the designs of existing functional girdles in the market were studied thoroughly, and the subject were required to wear those existing girdles. On the basis of this result, the experimental girdles were designed and produced which could serve well the subject's intension. The experimental girdles were of the basic long-type in order to apply to all sorts of girdles, and they were produced according to the style and pattern of the existing grading system. The second experiment was conducted by applying the subject's body measurements. Due to the elasticity of the material, in girdles the smaller measurements were to be used in this second experiment were: 80% of waist size, 84% of the hip and 85% of the thigh. To determine the length of the girdles, the same measurements were applied. The test results of the feeling of wearing the experimental girdles showed that the second, custom-made experimental girdles were better. According to the test results of the clothing pressure, the second experimental girdles(custom-made girdles) marked the higher pressure than the first on every part of the body, especially on the hips and thighs. Thus, it can be said that the second experimental girdles are better than the first in lifting up the hips. It is expected that the design methods developed in this study can be utilized as basic resources for the factory automation system of manufacturing custom-made girdles.

Estimation of MineRo's Kinematic Parameters for Underwater Navigation Algorithm (수중항법 알고리즘을 위한 미내로 운동학 파라미터 예측)

  • Yeu, Tae-Kyeong;Yoon, Suk-Min;Park, Soung-Jea;Hong, Sup;Choi, Jong-Su;Kim, Hyung-Woo;Kim, Dae-Won;Lee, Chang-Ho
    • Ocean and Polar Research
    • /
    • v.33 no.1
    • /
    • pp.69-76
    • /
    • 2011
  • A test miner named MineRo was constructed for the purpose of shallow water test of mining performance. In June of 2009, the performance test was conducted in depth of 100 m, 5 km away from Hupo-port (Korean East Sea), to assess if the developed system is able to collect and lift manganese nodules from seafloor. In August of 2010, in-situ test of automatic path tracking control of MineRo was performed in depth of 120 m at the same site. For path tracking control, a localization algorithm determining MineRo's position on seabed is prerequisite. This study proposes an improved underwater navigation algorithm through estimation of MineRo's kinematic parameters. In general, the kinematic parameters such as track slips and slip angle are indirectly calculated using the position data from USBL (Ultra-Short Base Line) system and heading data from gyro sensors. However, the obtained data values are likely to be different from the real values, primarily due to the random noise of position data. The aim of this study is to enhance the reliability of the algorithm by measuring kinematic parameters, track slips and slip angle.

Development of Image Quality Register Optimization System for Mobile TFT-LCD Driver IC (모바일 TFT-LCD 구동 집적회로를 위한 화질 레지스터 최적화시스템 개발)

  • Ryu, Jee-Youl;Noh, Seok-Ho
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2008.10a
    • /
    • pp.592-595
    • /
    • 2008
  • This paper presents development of automatic image quality register optimization system using mobile TFT-LCD (Thin Film Transistor-Liquid Crystal Display) driver IC and embedded software. It optimizes automatically gamma adjustment and voltage setting registers in mobile TFT-LCD driver IC to improve gamma correction error, adjusting time, flicker noise and contrast ratio. Developed algorithms and embedded software are generally applicable for most of the TFT-LCD modules. The proposed optimization system contains module-under-test (MUT, TFT-LCD module), control program, multimedia display tester for measuring luminance, flicker noise and contrast ratio, and control board for interface between PC and TFT-LCD module. The control board is designed with DSP and FPGA, and it supports various interfaces such as RGB and CPU.

  • PDF

Development of Bioelectric Impedance Measurement System Using Multi-Frequency Applying Method

  • Kim, J.H.;Jang, W.Y.;Kim, S.S.;Son, J.M.;Park, G.C.;Kim, Y.J.;Jeon, G.R.
    • Journal of Sensor Science and Technology
    • /
    • v.23 no.6
    • /
    • pp.368-376
    • /
    • 2014
  • In order to measure the segmental impedance of the body, a bioelectrical impedance measurement system (BIMS) using multi-frequency applying method and two-electrode method was implemented in this study. The BIMS was composed of constant current source, automatic gain control, and multi-frequency generation units. Three experiments were performed using the BIMS and a commercial impedance analyzer (CIA). First, in order to evaluate the performance of the BIMS, four RC circuits connected with a resistor and capacitor in serial and/or parallel were composed. Bioelectrical impedance (BI) was measured by applying multi-frequencies -5, 10, 50, 100, 150, 200, 300, 400, and 500 KHz - to each circuit. BI values measured by the BIMS were in good agreement with those obtained by the CIA for four RC circuits. Second, after measuring BI at each frequency by applying multi-frequency to the left and right forearm and the popliteal region of the body, BI values measured by the BIMS were compared to those acquired by the CIA. Third, when the distance between electrodes was changed to 1, 3, 5, 7, 9, 11, 13, and 15 cm, BI by the BIMS was also compared to BI from the CIA. In addition, BI of extracellular fluid (ECF) was measured at each frequency ranging from 10 to 500 KHz. BI of intracellular fluid (ICF) was calculated by subtracting BI of ECF measured at 500 kHZ from BI measured at seven frequencies ranging from 50 to 500 KHz. BI of ICF and ECF decreased as the frequency increased. BI of ICF sharply decreased at frequencies above 300 KHz.

Development of Automatic Power Measurement System for Electrosurgical Unit (전기 수술기 파워 자동 측정 시스템 개발)

  • Kim, SooHong;Yun, SungUk;Joh, MyoungHun;Jeon, GyeRok
    • Journal of Biomedical Engineering Research
    • /
    • v.38 no.4
    • /
    • pp.183-189
    • /
    • 2017
  • Electrosurgical Unit(ESU) is medical equipment that cut or coag tissues using electrical energy. It is used in hospitals' outpatient clinic room and operating room. Improper use of an ESU may cause fatal injuries to the patient, such as burns. So, before using an ESU, make sure that it is supplying enough energy for cut and coag by measuring the output power and checking the output power cable. In this study, we developed a simple ESU power measurement system PW100 that allows anyone to check the basic output power. And PW100 can check the state of the cable associated with the output power before using ESU. Then, we compared the measured output power of the PW100 with an ESU Analyzer which was commercialized, and compared the performance. In the experiment, the output power measured by the PW100 was lower value than an ESU Analyzer's that. However, the PW100's output power measured in the 5% error range and showed stable reproducibility by a low %RSD value.

Application of Urban Stream Discharge Simulation Using Short-term Rainfall Forecast (단기 강우예측 정보를 이용한 도시하천 유출모의 적용)

  • Yhang, Yoo Bin;Lim, Chang Mook;Yoon, Sun Kwon
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.59 no.2
    • /
    • pp.69-79
    • /
    • 2017
  • In this study, we developed real-time urban stream discharge forecasting model using short-term rainfall forecasts data simulated by a regional climate model (RCM). The National Centers for Environmental Prediction (NCEP) Climate Forecasting System (CFS) data was used as a boundary condition for the RCM, namely the Global/Regional Integrated Model System(GRIMs)-Regional Model Program (RMP). In addition, we make ensemble (ESB) forecast with different lead time from 1-day to 3-day and its accuracy was validated through temporal correlation coefficient (TCC). The simulated rainfall is compared to observed data, which are automatic weather stations (AWS) data and Tropical Rainfall Measuring Mission (TRMM) Multisatellite Precipitation Analysis (TMPA 3B43; 3 hourly rainfall with $0.25^{\circ}{\times}0.25^{\circ}$ resolution) data over midland of Korea in July 26-29, 2011. Moreover, we evaluated urban rainfall-runoff relationship using Storm Water Management Model (SWMM). Several statistical measures (e.g., percent error of peak, precent error of volume, and time of peak) are used to validate the rainfall-runoff model's performance. The correlation coefficient (CC) and the Nash-Sutcliffe efficiency (NSE) are evaluated. The result shows that the high correlation was lead time (LT) 33-hour, LT 27-hour, and ESB forecasts, and the NSE shows positive values in LT 33-hour, and ESB forecasts. Through this study, it can be expected to utilizing the real-time urban flood alert using short-term weather forecast.

Development and Evaluation of Smart Secondary Controls Using iPad for People with Hemiplegic Disabilities

  • Song, Jeongheon;Kim, Yongchul
    • Journal of the Ergonomics Society of Korea
    • /
    • v.34 no.2
    • /
    • pp.85-101
    • /
    • 2015
  • Objective: The purpose of this study was to develop and evaluate smart secondary controls using iPad for the drivers with physical disabilities in the driving simulator. Background: The physically disabled drivers face problems in the operation of secondary control devices that accept a control input from a driver for the purpose of operating the subsystems of a motor vehicle. Many of conventional secondary controls consist of small knobs or switches that physically disabled drivers have difficulties in grasping, pulling or twisting. Therefore, their use while driving might increase distraction and workload because of longer operation time. Method: We examined the operation time of conventional and smart secondary controls, such as hazard warning, turn signal, window, windshield wiper, headlights, automatic transmission and horn. The hardware of smart secondary control system was composed of iPad, wireless router, digital input/output module and relay switch. We used the STISim Drive3 software for driving test, customized Labview and Xcode programs for interface control of smart secondary system. Nine subjects were involved in the study for measuring operation time of secondary controls. Results: When the driver was in the stationary condition, the average operation time of smart secondary devices decreased 32.5% in the normal subjects (p <0.01), 47.4% in the subjects with left hemiplegic disabilities (p <0.01) and 38.8% in the subjects with right hemiplegic disabilities (p <0.01) compared with conventional secondary devices. When the driver was driving for the test in the simulator, the average operation time of smart secondary devices decreased 36.1% in the normal subjects (p <0.01), 41.7% in the subjects with left hemiplegic disabilities (p <0.01) and 34.1% in the subjects with right hemiplegic disabilities (p <0.01) compared with conventional secondary devices. Conclusion: The smart secondary devices using iPad for people with hemiplegic disabilities showed significant reduction of operation time compared with conventional secondary controls. Application: This study can be used to design secondary controls for adaptive vehicles and to improve the quality of life of the people with disabilities.

Spatial Image Information Generation of Rock Wall by Automatic Focal Length Extraction System (초점거리 자동추출 시스템에 의한 암벽의 공간영상정보 생성)

  • Lee, Jae-Kee;Lee, Kye-Dong
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.25 no.5
    • /
    • pp.427-436
    • /
    • 2007
  • Because the slope made up the construction of any other facilities, has many risks of a collapse, existing inspection methods to collect information for a construction site of slope bring up a long time of inspection period, cost and approach for a measuring instrument and it presents the critical point of collecting materials. For getting images to use zoom lens in any positions this study will use free zoomer constructed values of data classified by the focal length develop Image Loader system to make it load not only camera information but also camera test data values of the focal length took a photograph automatically if it measure to use a variety of cameras or other lens. Also, as it constructs three dimensions spatial image information from images of obtained objects this study presents effective basic materials of slope surveying and inspection and it shows exact surveying methods for dangerous slope not to access.

Programmatic Sequence for the Automatic Adjustment of Double Relaxation Oscillation SQUID Sensors

  • Kim, Kiwoong;Lee, Yong-Ho;Hyukchan Kwon;Kim, Jin-Mok;Kang, Chan-Seok;Kim, In-Seon;Park, Yong-Ki
    • Progress in Superconductivity
    • /
    • v.4 no.1
    • /
    • pp.42-47
    • /
    • 2002
  • Measuring magnetic fields with a SQUID sensor always requires preliminary adjustments such as optimum bas current determination and flux-locking point search. A conventional magnetoencephalography (MEG) system consists of several dozens of sensors and we should condition each sensor one by one for an experiment. This timeconsuming job is not only cumbersome but also impractical for the common use in hospital. We had developed a serial port communication protocol between SQUID sensor controllers and a personal computer in order to control the sensors. However, theserial-bus-based control is too slow for adjusting all the sensors with a sufficient accuracy in a reasonable time. In this work, we introduce programmatic control sequence that saves the number of the control pulse arrays. The sequence separates into two stages. The first stage is a function for searching flux-locking points of the sensors and the other stage is for determining the optimum bias current that operates a sensor in a minimum noise level Generally, the optimum bias current for a SQUID sensor depends on the manufactured structure, so that it will not easily change about. Therefore, we can reduce the time for the optimum bias current determination by using the saved values that have been measured once by the second stage sequence. Applying the first stage sequence to a practical use, it has taken about 2-3 minutes to perform the flux-locking for our 37-channel SQUID magnetometer system.

  • PDF