• Title/Summary/Keyword: Automatic construction system

Search Result 506, Processing Time 0.025 seconds

Diagnosis Design Using Embedded Transmission Simulator (임베디드 변속기 시뮬레이터를 이용한 진단알고리즘 설계)

  • Jung, G.H.;Kim, K.D.
    • 유공압시스템학회:학술대회논문집
    • /
    • 2010.06a
    • /
    • pp.56-61
    • /
    • 2010
  • Simulator is a development equipment which enables the ECU to operate in normal mode by simulating the interface signal between ECU and mechanical system electrically. Embedded simulator means simulation function is embedded in ECU firmware, hence the electrical signal interface is replaced by the substitution of information at system program level. This paper explains the development of embedded transmission simulator for the verification of TCU firmware function which covers shifting control and on-board diagnosis. The embedded simulation program is executed in TCU processor along with the TCU firmware and it provides TCU firmware with not only the speed information those are appropriate both in driving and shifting conditions, but also the fault detection signals. Experimental results show that the validity of embedded simulator and its usefulness to the TCU firmware development and verification.

  • PDF

A Study on Construction of Automatic Inspection System for Welding Flaws (용접결함 검사 자동화 시스템 구축에 관한 연구)

  • Kim, Chang-Hyun;Yu, Hong-Yeon;Hong, Sung-Hoon;Kim, Jae-Yeol
    • Transactions of the Korean Society of Machine Tool Engineers
    • /
    • v.16 no.6
    • /
    • pp.37-42
    • /
    • 2007
  • The purpose of this research is stability estimation of plant structure through classification and recognition about welding flaw in SWP(Spiral Welding Pipe). And, In this research, we used nondestructive test based on ultrasonic test as inspection method, and made up 2-axes inspection robot in order to control of ultrasonic probe on the SWP surface, and programmed to image processing and probabilistic neural network(PNN) classifying code by MATLAB programming. Through this process, we proved efficiency on the system of SWP stability Estimation.

Design and implementation of optical identification system using visible light and infrared

  • Lee, Seong-Ho
    • Journal of Sensor Science and Technology
    • /
    • v.30 no.4
    • /
    • pp.196-203
    • /
    • 2021
  • In this study, an optical identification system was developed, wherein visible light is used to transmit the interrogating signal, and infrared is used to send the response signal. In the reader, visible light from a light emitting diode (LED) array was modulated via modified pulse width modulation for flicker-free illumination and dimming control. Moreover, the duty factor of the dimming control time was employed to control the illumination from the LED. In the transponder, the spike signal in the output of the high-pass filter was utilized to recover the interrogating signal while preventing interference from the 120-Hz noise from adjacent lighting lamps. The illumination was controlled in 26-86% range of the constant wave LED illumination by changing the duty factor from 20% to 90%. This configuration is advantageous for the construction of optical identification systems for automatic security check and car fare calculation at toll gates or parking facilities.

Improvement of LR Parser using Reduction Goals (리덕션 골을 이용한 LR 파서의 개선)

  • Son, Yun-Sik;Oh, Se-Man
    • Journal of Korea Multimedia Society
    • /
    • v.11 no.5
    • /
    • pp.703-709
    • /
    • 2008
  • The methodology of the compiler construction improved by well-defined parsing techniques and developments of automatic generation tools. Through them, a variety of compilers for the special applications can be developed effectively: particularly, the compiler for embedded/mobile devices. Also, as contents industry is proliferating recently, the necessity of developing a compiler which is suitable for contents system is highly increasing. These various demands can be resolved by modular techniques and automatic construction of compilers. But, optimization of compiler itself as development tools uses heuristic methods and it needs higher cost. In this paper, we suggest the parsing method which can decrease unnecessary reduce actions by analyzing the characteristics of LR parser. The suggested parsing technique uses lookahead/ states, reachable reduction goals information in parsing process and enhances the parsing efficiency by changing continuous reduce actions to one. Actually, we applied it to the front-end of ANSI C compiler and proved the parsing performance in terms of the number of reduce actions.

  • PDF

BIM-Based Generation of Free-form Building Panelization Model (BIM 기반 비정형 건축물 패널화 모델 생성 방법에 관한 연구)

  • Kim, Yang-Gil;Lee, Yun-Gu;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.12 no.4
    • /
    • pp.19-31
    • /
    • 2022
  • With the development of 3D-based CAD (Computer Aided Design), attempts at freeform building design have expanded to small and medium-sized buildings in Korea. However, a standardized system for continuous utilization of shape data and BIM conversion process implemented with 3D-based NURBS is still immature. Without accurate review and management throughout the Freeform building project, interference between members occurs and the cost of the project increases. This is very detrimental to the project. To solve this problem, we proposed a continuous utilization process of 3D shape information based on BIM parameters. Our process includes algorithms such as Auto Split, Panel Optimization, Excel extraction based on shape information, BIM modeling through Adaptive Component, and BIM model utilization method using ID Code. The optimal cutting reference point was calculated and the optimal material specification was derived using the Panel Optimization algorithm. With the Adaptive Component design methodology, a BIM model conforming to the standard cross-section details and specifications was uniformly established. The automatic BIM conversion algorithm of shape data through Excel extraction created a BIM model without omission of data based on the optimized panel cutting reference point and cutting line. Finally, we analyzed how to use the BIM model built for automatic conversion. As a result of the analysis, in addition to the BIM utilization plan in the general construction stage such as visualization, interference review, quantity calculation, and construction simulation, an individual management plan for the unit panel was derived through ID data input. This study suggested an improvement process by linking the existing research on atypical panel optimization and the study of parameter-based BIM information management method. And it showed that it can solve the problems of existing Freeform building project.

Interoperability Analysis for BIM software Based on User-defined Properties (BIM 소프트웨어 호환성 분석 : 사용자정의 속성정보인 GBS를 중심으로)

  • Kang, Seunghee;Ha, Jiwon;Ju, Taehwan;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.99-109
    • /
    • 2016
  • The utilization of Building Information Modeling (BIM) has increased in order to enhance the integration of information for management and resources throughout the construction projects. Therefore, various BIM softwares have been used under open BIM environments in the building and plant construction industry. However, it has obstructive factors due to the lack of interoperability. In order to address this problem, this study conducted an interoperability analysis of BIM software focused on user-defined properties for enhanced function and efficiency. Result of the analysis shows that authoring tools have more interoperability problems than viewer tools and simulation tools have. In terms of interoperability, user-defined properties outperforms than those of system basic properties and logic data. Therefore, it was found that functional improvement and workload minimization in BIM can be attained by applying the GBS (an user-defined property for automatic manipulation of BIM proposed by Jung et al. 2013) that enables automatic link between geometric data and non-geometric data. In this respect, this study concludes that the application of user-defined property (e.g. GBS) can be an effective method for information integration throughout construction projects.

Characteristics and Status of Commercial System for Utilizing MMS in Geospatial Information Construction (공간정보 구축 분야의 모바일 매핑 시스템 활용을 위한 상용 시스템의 특징 및 현황 조사)

  • Park, Joon-Kyu;Um, Dae-Yong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.10
    • /
    • pp.36-41
    • /
    • 2017
  • The mobile mapping system first introduced at Ohio State University in 1991 is being developed in various forms as sensor technology develops. The mobile mapping system can acquire geospatial information around amoving object quickly using the information gathered using the position and attitude information of the moving object and the data from various sensors. The mobile mapping system can rapidly acquire large amounts of Geospatial information and MMS provides maximum productivity in the same measurement methods as existing GNSS and total stations. Currently, a variety of systems are being launched, mainly by foreign companies, and they are applied to the construction of geospatial information. On the other hand, the application of domestic technology development or production is insufficient. This paper provides basic data for the introduction of a mobile mapping system to geospatial information related business by conducting the status survey and feature analysis of a commercialized system focusing on the ground-based mobile mapping system. The research identified the current status and characteristics of high-priced, low-priced, indoor, and handheld mobile mapping systems based on vehicles and suggest that the recent system development trends are moving toward lowering the unit prices. The mobile mapping system is currently being developed as a platform for the application of geospatial information construction and the launch of low-cost models. The development of data processing technologies, such as automatic matching and the launch of low-cost models, are forming a basis for the application of mobile mapping systems in the field of geospatial information construction.

TotalStation and System2000 Implementation for Digital Cartographic Map (토탈스테이션과 시스템2000을 이용한 수치지형도 제작)

  • Yang, Ok-Jin;Jung, Young-Dong;Kang, Sang-Gu
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.9 no.2 s.18
    • /
    • pp.55-62
    • /
    • 2001
  • The development of electronic technology brings the advent of GPS and electronic total station which measures, stores and records automatically angles, distances and 3d coordinates Electronic totalstation is the surveying equipment and system2000 is the supporting program that enables totals tation to get 3d terrain information, construction of the database and automatic drafting of the cartographic map. In this study, we aims at studying the system which can produce automatically the digital cartographic map by using total station and system2000. For this study, cartographic maps of a region are produced by total station and system2000, and then builded digital cartographic map on the autocad2000 environment and also we analysed two digital cartographic maps. As a results of this study, it is found that digital cartographic map by total station and system2000 are much more accurate and efficient than cartographic map by electronic plan table surveying.

  • PDF

A Case Study for SMRT Train Open Doors Control System (도시철도의 열차출입문제어에 관한 연구)

  • Won, Yu-Duck;Shim, Won-Sub
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.941-946
    • /
    • 2006
  • It followed in system development and SMRT(Seoul Metropolitan Rapid Transit Co)System reached to an automatic train operation(ATO) and driverless operation(DLM) from the manual operation due to the train driver. The train like the general bus or the car vehicle was not serial riding in a car and the Parallel concept which the numerous passenger rides in a car simultaneously occur frequently the charge of the train driver unmanned bitterly from existing manual handling was a possibility of doing, train open door control(ODM) which bites also ATO, it handles it minimized. Like this ATO/DLM, the control system which bites being a Wayside to Train communication for immediacy, it is a system of the Vital concept the immediacy of the citizen Data evil the radio information transmission and the train of the interface which is accurate from unmanned operation and, will decipher, will accomplish it will guarantee. It respects the passenger accident prevention and an air question environment improvement from subway platform and phul leys the screen door of Platform(PSD) with the fire tube frost it refers and part it treats and to sleep it does, ODM which bites is accuracy and immediacy of altitude and when seeing from the viewpoint which demands the trust of altitude, ODM system the trust of car incest interface in the equipment construction which is safe and the comparative analysis back of the system analysis against the control which bites and case study and other subway system it leads from the research which it sees and signal - train in base grudge to sleep it contributes it does.

  • PDF

Method of Deriving Activity Relationship and Location Information from BIM Model for Construction Schedule Management (공정관리 활용을 위한 BIM모델의 공정별 수순 및 위치정보 추출방안)

  • Yoon, Hyeongseok;Lee, Jaehee;Hwang, Jaeyeong;Kang, Hyojeong;Park, sangmi;Kang, Leenseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.2
    • /
    • pp.33-44
    • /
    • 2022
  • The simulation function by the 4D system is a representative BIM function in the construction stage. For the 4D simulation, schedule information for each activity must be created and then linked with the 3D model. Since the 3D model created in the design stage does not consider schedule information, there are practical difficulties in the process of creating schedule information for application to the construction stage and linking the 3D model. In this study, after extracting the schedule information of the construction stage using the HDBSCAN algorithm from the 3D model in the design stage, authors propose a methodology for automatically generating schedule information by identifying precedence and sequencing relationships by applying the topological alignment algorithm. Since the generated schedule information is created based on the 3D model, it can be used as information that is automatically linked by the common parameters between the schedule and the 3D model in the 4D system, and the practical utility of the 4D system can be increased. The proposed methodology was applied to the four bridge projects to confirm the schedule information generation, and applied to the 4D system to confirm the simplification of the link process between schedule and 3D model.