• Title/Summary/Keyword: Automated management system

Search Result 628, Processing Time 0.026 seconds

Design and Implementation of the Semi-automated Evaluation Workflow Management System(Sa-EWMS) (반자동화 평가워크플로우 관리 시스템 설계 및 구현)

  • Kang Yeon-hee;Kim Jung-dae;Lee Gang-soo
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.15 no.4
    • /
    • pp.39-50
    • /
    • 2005
  • An evaluation demand and a market growth regarding evaluation and certification are increasing because the importance of information Security is gradually rising to solve the information disfunction. Therefore, it is necessary the cost-effect evaluation management of the Information Security System(ISS). In this paper, we propose the Semi-automated Evaluation Workflow Management System(Sa-EWMS) based on the Common Criteria(CC) which performs and manages evaluation work through the procedure when evaluator evaluates the Information Security System(ISS). The Sa-EWMS is solving a problem of consumption of time and effort and performing efficient evaluation, it is playing a significant role that traces workflow process of each work of the Engines and controls performance. It will be able to use useful the private evaluation enterprise which confront in an evaluation demand and a market growth.

Overview of Operations Strategy for Service Layout and Statistical Process Control (서비스 배치 및 SPC 운영 전략)

  • Choi, Sung-Woon
    • Journal of the Korea Safety Management & Science
    • /
    • v.8 no.6
    • /
    • pp.109-118
    • /
    • 2006
  • This paper proposes service layout strategy considering service characteristics by the use of benchmarking production system such as layout by P-Q chart, improvement tool, automated system, Toyota production system and lean production system. This paper represents operation methodology of statistical process control using control chart for service performance outcomes.

Development of the Performance Analysis Model Based on Research and Development Phases for Automated Construction Equipment (건설자동화 기계의 연구개발 단계에 따른 성능 분석 모델 개발)

  • Lee, Jeong-Ho;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.67-80
    • /
    • 2008
  • Recently, automated construction machines have been developed for technically solving construction industry problems such as labor, productivity, qualify and the profit decrease. In spite of the importance of performance analysis in order to commercialize the automated construction machines, previous studies are mainly forced on developing hardware and software of automated construction machines. The primary objective of this research is to propose the performance analysis model of automated construction machines, which can measure productivity, quality and safety improvement rate based on the research and development phases, and to develop a performance analysis system, which enables performance evaluator to easily analyze the performance of the automated construction machines. Finally, it is anticipated that the effective use of the performance analysis model and computerized system would be able to develop the automated construction machines having high performance, and to establish the marketing strategy effectively in order to increase the possibility of commercialization of the developed construction machines.

A Development of Automated Monitoring Technique and Feedback Design System for Embankment on Soft Ground (연약지반 계측 정보관리 및 자동분석.재설계 시스템 개발)

  • 한영철;윤동덕;김주용
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.10a
    • /
    • pp.103-108
    • /
    • 1999
  • This paper describes development of a new automated real-time system which preforms measurement data reduction and management, geotechnical backanalysis, and feedback design for embankment construction on soft ground. Such a system can be an effective, useful and economical tool for managing a large site development on soft ground. The system consists of data base system to characterize soil properties and identify instrumentation, analysis system for ground behavior and stability coupled with automatic monitoring system, and feedback design system which is a new technique to reflect the analysis of measured ground behavior against original design.

  • PDF

Development of an automated system for water-hydraulic and leakage test of pressure vessels

  • Kim, Dong-Soo;Lee, Won-Hee
    • International Journal of Precision Engineering and Manufacturing
    • /
    • v.5 no.1
    • /
    • pp.55-59
    • /
    • 2004
  • This study developed a fully automated test system for pressure vessels, containing such as oxygen, nitrogen, which is widely used in many industries. The pressure vessel test has three major parts including weight measurement test, water-hydraulic test and leakage test followed by cleaning and drying. The control system for these tests consists of three parts: a PLC, a monitoring system and a database management system. The PLC oversees overall control of test machines, while the monitoring system measures and displays weight, pressure, flow etc. for every situations, and the database management system stores test data. These three modules are designed to communicate with one another at 1 Hz frequency alerting problematic situations to the operator. The system has gone through actual field tests for verification of performances.

A study on the Waiting Line in the Automated Storage/Retrieval System with Dual Command Policy (이중명령 자동창고의 대기행렬에 관한 연구)

  • Chang, Jin-Ick;Kim, Won-Joong
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.28 no.4
    • /
    • pp.134-141
    • /
    • 2005
  • Due to the complexity and stochastic nature of automated warehousing system, items are usually queued up at I/O point. We introduce a storage/retrieval policy : dual-command. We present quick approximations to queueing phenomena under these policies. It is assumed that the storage and retrieval arrival pattern follow the same poisson process. We also assumed that storage queue and retrieval queue being operated separately. The approximation attempts are performed under the proposed storage/retrieval policies after we derive S/R machine travel time distributions.

Improvement of Night Pharmacy Service by Automated Dispensing Cabinet System Implementation in Emergency Medical Center (응급의료센터 자동약품분배 캐비닛시스템 운영으로 인한 야간 약국업무개선)

  • Kim, Kyung Hee;Kim, Sun Ah;Rhie, Sandy Jeong
    • Korean Journal of Clinical Pharmacy
    • /
    • v.28 no.1
    • /
    • pp.51-56
    • /
    • 2018
  • Objective: An automated process for medication preparation and dispensing is essential to improve the quality of work. To reduce night pharmacy workload, a new automated dispensing cabinet system was implemented in a hospital emergency medical center. The purpose of this study is to verify that implementation of an automated dispensing cabinet system will influence the efficiency of night pharmacy work. Methods: To evaluate the new system implementation, a retrospective study and survey was performed in the Ewha Womans University medical center. We compared the dispensing and near-miss error rates between the automated dispensing cabinet system and a night pharmacy. The degree of satisfaction of night shift workers with the new system was surveyed. Results: This study showed significantly reduced dispensing rates of night medications (56.1% and 37.3%; p < 0.01) and near-miss night medications (0.27% and 0.17%; p<0.01). Thirty-two persons responded to the survey, and the satisfaction score for the new system was 4.0 (${\pm}0.8$). The scores were high in order of efficiency, management, and convenience. Time requirement was also reduced because of the simple step of only reviewing in the pharmacy with the new system. Conclusion: Due to system implementation, workload was reduced and time was saved for not only night shift workers but also patients receiving emergency discharge medicine. It was suggested that this will have a positive effect on pharmacist medical service and patient safety.

Rule-based Review and Automated Quality Management Process of BIM deliverables for Railway Infrastructures (철도인프라 BIM 성과물의 품질검토 절차 및 룰 기반 적용성 검토)

  • Kang, Jeon-Yong;Hasan, Syed Mobeen;Min, Ji-Sun;An, Joon-Sang;Choi, Jae-Woong
    • Journal of KIBIM
    • /
    • v.12 no.1
    • /
    • pp.23-34
    • /
    • 2022
  • In the current 2D-based design, design reliability is lowered due to interference and inconsistency between plans, errors in drawings and quantities, etc. At the time of transition to BIM-based 3D design, it is necessary to expand the reliability and usability of BIM by eliminating these errors from the design stage through securing the quality of the BIM digital model. Therefore, in the railway infrastructure design stage, the quality management process and standards of the BIM digital model were defined and quality management index were developed. Based on the rule extracted from the quality management index, a pilot quality management was conducted in connection with the commercial Model-Checker rule, problems and improvement plans were derived, and a rule-based automated quality management plan was prepared.

Development of the Expert System for Selection of Equipment for Automated Warehouses Using Reliability Theory (신뢰성 이론을 이용한 자동창고 설비 선정 전문가 시스템 개발에 관한 연구)

  • Lee, Young-Hae;Jeong, Chang-Sik
    • Asia pacific journal of information systems
    • /
    • v.8 no.3
    • /
    • pp.135-145
    • /
    • 1998
  • There exists popular approach using certainty factor (CF) for the development of effective reasoning mechanism under uncertainty in Expert System, However, there is a problem with CF. The CF values could be resulted in the opposite of given conditional probabilities. In this paper, a method for, reasoning under uncertainty using reliability theory to overcome the problem is proposed. And the proposed method is used in the development of Expert System for the selection of equipment for automated warehouses.

  • PDF

A Study on the Possibility of using BIM in Automated Building Code Checking for Egress and Anti-disaster Regulations for Large-scale Buildings (BIM을 이용한 초대형 건축물 방재 및 피난 관련 법규 자동검토 가능성 연구)

  • Jeong, Ji-Yong;Lee, Ghang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.690-693
    • /
    • 2008
  • Recently, the trend has been for buildings to become larger and more sophisticated, and this has created safety issues. Because the buildings are big it takes lots of time to check building codes related to anti-disaster and safety manually, and there is the high possibility of making mistakes. Due to these problems, according to a study, 83% of architecture and construction workers believe that an automated code-checking system is needed. This study researches past automated code checking systems and research activity, and using Building Information Model (BIM) technology, determines the feasibility of developing a system to automatically check domestic codes related to egress and anti-disaster. This paper describes the necessity of an automated building code checking system and expected effects. It then reports whether the methods used in previous studies can be deployed in domestic building code checking and discusses problems and limitations. It also suggests an alternative approach. Although this study covers limited codes related to egress, we need to find out what is needed for automatic general code checking system and do further studies for that.

  • PDF