• Title/Summary/Keyword: Automated management system

Search Result 628, Processing Time 0.043 seconds

A Study on the Quality Improvement of Mechanical Drawing Notes Using Lean 6 Sigma Analysis (린 6시그마 분석을 통한 도면 주기 품질 향상 방안 연구)

  • Jeon, Yong Gu;Huh, Hyoung Jo;Lee, Seong Bae;Park, Hun Hyuk;An, Byung Guk
    • Journal of Korean Society for Quality Management
    • /
    • v.48 no.3
    • /
    • pp.381-393
    • /
    • 2020
  • Purpose: The purpose of this study was to find useful solutions by analyzing causes and results about defects on mechanical drawing notes and provide an automated tool with solutions to mechanical engineers. Methods: The collected data for defects on mechanical drawing notes were from ongoing development and mass production projects. Various measurement methods were used based on the Lean 6 Sigma analysis such as Process analysis, C&E diagram and some statistical analysis. Results: The results of this study are as follows; The results of the Lean 6 Sigma analysis, the validity of the selected indicators for improving drawing notes quality was verified through the verification of cause variables. The strategy established to improve the mechanical drawing notes was reflected as an automated program, and the defects were within a manageable range and achieved target Sigma level. Conclusion: Through the application of the "Mechanical drawing notes automation tool", it is expected to resolve the "Voice of Customer, VOC" and "Voice of Business, VOB".

A Design Procedure for Safety Simulation System Using Virtual Reality

  • Jae-seug Ki
    • Proceedings of the Safety Management and Science Conference
    • /
    • 1999.11a
    • /
    • pp.381-389
    • /
    • 1999
  • One of the objectives of any task design is to provide a safe and helpful workplace for the employees. The safety and health module may include means for confronting the design with safety and health regulations and standards as well as tools for obstacles and collisions detection (such as error models and simulators). Virtual Reality is a leading edge technology which has only very recently become available on platforms and at prices accessible to the majority of simulation engineers. The design of an automated manufacturing system is a complicated, multidisciplinary task that requires involvement of several specialists. In this paper, a design procedure that facilitates the safety and ergonomic considerations of an automated manufacturing system are described. The procedure consists of the following major steps: Data collection and analysis of the data, creation of a three-dimensional simulation model of the work environment, simulation for safety analysis and risk assessment, development of safety solutions, selection of the preferred solutions, implementation of the selected solutions, reporting, and training When improving the safety of an existing system the three-dimensional simulation model helps the designer to perceive the work from operators point of view objectively and safely without the exposure to hazards of the actual system.

  • PDF

Site Evaluation of Automated Monitoring Networks in Han River (한강수계 수질오염 자동측정망의 합리적인 측정지점 선정에 관한 조사연구)

  • Cho, Yong-Mo;Oh, Jung-Woo
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.11 no.4
    • /
    • pp.91-98
    • /
    • 1997
  • At present, automated monitoring of water quality in Han river has been operated at each water treatment plant. But the automated measurement sites must be choosen newly because water source in Seoul move to the upper stream of Chamshil weir. In this study, automated monitoring sites in Han river were reviewed, and the proper sites for automated monitoring of water quality have been selected by Qual2E model, RMA model, water sampling guidline, Sanders' method and topograpical characteristics of Han river in order to resonable operate. 8 sites have been selected as follows: (1) the site of immediately after Paldang drainage (2) the left site and a right site of $Gu{\check{u}}i$ water intake (3) the left site and a right site at Noryangjin(Han river bridge) (4) the site between Shingok weir and Anyangchun confluence point(Hangju bridge) (5) the site of Chungryangchun downstream(existence) (6) the site of Tanchun downstream(existence) (7) the site of Anyangchun downstream(existence) (8) the site of Wangsukchun downstream. The results proposed resonable operating management of network and economical system built up.

  • PDF

A Development of the Automated Vertical Controllable Device for Improving Construction Performance of Pile Driver (파일드라이버 기계 시공성능 향상을 위한 연직 자동제어기의 개발)

  • Cho, Chang-Yeon;Lee, Jun-Bok;Son, Jae-Ho;Kim, Han-Soo;Cho, Moon-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.4 s.32
    • /
    • pp.78-90
    • /
    • 2006
  • There is no specific code and/or standard described in the specifications to check verticality for Pre-tensioned Spun High Strength Concrete pile installation process. The most commonly used method for the vertical PHC pile installation is a naked-eye measurement or water level measurement conducted by assistant crew in the construction sites. The main objective of the research is to develop the automated vertical controllable prototype equipment for PHC piles in order to achieve uniform construction qualify as well as improving safety and productivity. The paper explains the literature review on PHC pile and pile installation process, development of prototype, field test of the prototype and its performance evaluation in terms of quality and safety as well as productivity. The results of the research will lead the further researches on the automated pile installation system.

A Study on Control system design for Automated Cultivation of product (농작물 재배 자동화를 위한 제어시스템 설계에 관한 연구)

  • Cho, Young Seok
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.10 no.1
    • /
    • pp.55-60
    • /
    • 2014
  • Today, there is increasing the elderly population in rural community, and people of returning from the urban to the rural community are demand to be of high value-added agriculture. In this time, there are required to regularization, standardization, automation, for getting of production of high value crops. In this paper, we are study for automation cultivation control system design for produce high-value crops. this system were designed of two parts that one part is measure and control unit, another part is server part for database and server side control. the main controller for measurement and control is used MC9S08AW60, server for Database and server-side control was using MySQL with CentOS. The source code of control program was coding C and compile with GCC. the functions of measurement and control unit are digital input and output each 8channels and can be scan-able of 20 Bit with 2CH/Sec. Analog Output were designed that can be output of 4-20mA or 0-5V on 4channel. The Digital input and output part were designed 8-channel, and using the high speed photo coupler and relays. We showed that system is possible to measure a 20bit data width, 2Ch/sec as 8 channel analog signals.

A Study on the Automated Estimating System using BIM based Library (BIM 기반 토목 라이브러리를 통한 견적자동화시스템에 관한 연구)

  • Han, Jung-Hoon;Nam, Sang-Hyeok
    • Journal of KIBIM
    • /
    • v.1 no.2
    • /
    • pp.12-18
    • /
    • 2011
  • The BIM techniques which manages information over the life cycle of construction project based on the 3-dimensional model are developing in the direction of integrated construction management including planning, design, analysis, estimation, 3D simulation and so on. The estimation model based on the BIM has different detail level and model information. In this study, the LOD of estimation model is catched for the bridge structures. The library classes are defined with construction information classification system, and the quantities of resources are calculated by class parameter using Microstation API. Finally, the automated estimation system using BIM based library is verified by the integrated model for adjustments of level of detail.

Expected Travel Time Model of Double Shuttle Unit Load Warehousing System (이중 셔틀 자동창고 시스템에서의 평균 주행시간 모델)

  • Chae-Soo Kim;Seong-Whan Shinn
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2001.11a
    • /
    • pp.9-14
    • /
    • 2001
  • This paper considers automated storage and retrieval systems with double shuttle. We develop the travel time model based on the first come first service rule. We evaluate the performance of the double shuttle system working on the four command cycle.

  • PDF

A Study on the Development of Electronic Mail-based Customer Relationship Management System (전자메일 기반의 고객관계관리(CRM) 시스템 개발에 관한 연구)

  • 김승욱;양광민
    • Journal of Information Technology Applications and Management
    • /
    • v.10 no.4
    • /
    • pp.51-63
    • /
    • 2003
  • This study designs and implements a new approach to the classification of e-mail requests from customer based on machine learning techniques. The work on building an electronic mall classifier can be cast into the framework of text classification, since an e-mail is a viewed as a document, and judgement of interest is viewed as a class level given to the e-mail document. It is also implemented an e-mall based automated response system that integrate with Call Center in a practical use.

  • PDF

Statistical Process Control Software developed by MS-EXCEL and Visual Basic (MS-EXCEL과 Visual Basic으로 개발한 통계적 공정관리 소프트웨어)

  • Han, Kyung-Soo;Ahn, Jeong-Yong
    • Journal of Korean Society for Quality Management
    • /
    • v.24 no.2
    • /
    • pp.172-178
    • /
    • 1996
  • In this study, we developed a software for statistical process control. This software presents $\bar{x}$, R, CUSUM, EWMA control chart and process capability index. In this system, statistical process control methods are integrated into the automated method on a real time base. It is available in process control of specified type and can be performed on personal computer with network system.

  • PDF

A study on the application System Engineering methods for LRT projects (Mainly on Configuration Management methods) (경전철프로젝트 시스템엔지니어링기법 적용검토(형상관리방안 기준으로))

  • Oh, Sung-Hyo;Lee, Seong-Gwon;Park, Soo-Choong;Kim, Jae-Jin
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1904-1911
    • /
    • 2010
  • LRT projects pursue fully automated manless operating system with an aim to achieve a minimum availability of 99%. System performance is required to be guaranteed by verified SE procedures to meet user requirements for maintaining system availability above 99%. Configuration Management is one of the most practical SE application methods that manage various changes that may have a major influence on system performance on the process of undertaking assigned projects and find out problems in the system through future tracking systems. This paper discusses further use of Configuration Management in the areas concerned after examining the cases that apply Configuration Management, one of SE application methods, to the ongoing local LRT projects.

  • PDF