• Title/Summary/Keyword: Automated Construction.

Search Result 507, Processing Time 0.024 seconds

Detail Design and Structural Stability Analysis for Automated PHC Pile Cutting Machine (PHC 파일 원커팅 두부정리 자동화 장비의 상세설계 및 구조적 타당성 분석)

  • Yeom, Dong Jun;Hwang, Ji Young;Park, Yesul;Kim, Young Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.117-125
    • /
    • 2018
  • The primary objectives of this study are to develop a detail design of automated PHC pile head cutting machine and structural stability analysis of detail design that improves the conventional head cutting work in safety, quality, and productivity. For this, the following research works are conducted sequentially; 1)literature review and field study, 2)expert survey and interview, 3)selection of core technology using AHP analysis, 4)deduction of detail design 5) verification of structural stability. As an outcome, it is analyzed that gripper and gripper bearing shaft are structurally stable. Their maximum stresses are shown as 15.93%, 10.58% compared to their yield strength respectively. The results of detail design and structural stability analysis in this study will be utilized for the actual development of the automated PHC pile cutting machine prototype.

Simulation-based Design Validation and Alternatives Analysis of Release Process of Logistics Automation Warehouse (시뮬레이션을 활용한 물류 자동화 창고의 출고 프로세스 설계 검증 및 대안 분석)

  • Moon-Gi Jeong;JongPil Kim;JinSung Park;Kyung-Min Seo
    • Journal of the Korea Society for Simulation
    • /
    • v.32 no.3
    • /
    • pp.75-91
    • /
    • 2023
  • As the business-to-customer (B2C) online market expands after the COVID-19 pandemic, the logistics industry has been constructing automated warehouses to handle multi-product, low-volume logistics. When constructing a logistics automation warehouse, it is crucial to validate that the facility's performance and operational logic are designed to meet the required throughput of the automated warehouse from the system design phase. This study proposes simulation-based validation and optimal alternatives for an H logistics automation warehouse in Iksan, Jeollabuk-do. Firstly, we focused on the box supply and packing processes, which are related to the release process, among the entire logistic processes. Then, we analyzed the potential bottlenecks in the target process and designed and implemented a discrete-event simulation model based on the analysis results. The simulation experiments showed that the facility parameters and operational logic identified in the system design phase did not satisfy the performance requirements of the entire automated warehouse. Additional experiments were conducted to suggest alternatives to meet the system performance requirements by changing the facility parameters and operational logic. We expect that the proposed study will be utilized in the future, not only in the system design phase but also in the system construction phase, for verification purposes to ensure that the construction proceeds according to the design.

The Operating Objective of Automated Container Terminal by the AHP Techniques : The Case of Port of Gwangyang Automated Container Terminal (AHP기법을 활용한 자동화 컨테이너터미널 운영목표 설정에 관한 연구 : 광양항 자동화 컨테이너터미널을 대상으로)

  • 박남규;최형림;이창섭
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2003.05a
    • /
    • pp.223-230
    • /
    • 2003
  • KCTA(Korea Container Terminal Authority) is going to introduce automated operating system in the port of Gwangyang container terminal to enhance the efficiency. Prior to developing the container terminal, defining the objective of container terminal operation is essential. This research used AHP technique to define the operation objective of automated container terminal objectively, and the questionnaire to collect the opinions of future customer, operator and research institution. The objectives mix of the automated container terminal are composed of the minimization of initial investments, the minimization of operational expenses, the performance of automation system, the raising of operation efficiency and productivity and the improvement of customer service. The result of the analysis revealed that most important factor among objectives mix was “the minimization of operation expense”. Especially, the user group preferred to select the factor of “the improvement of customer service”as objective rather than select other objectives. The result of this research will suggest some guidelines for deciding the level of investment of terminal construction. information system, automation equipment, terminal worker and etc., which are to be considered in terminal development and the system development hereafter.

  • PDF

Entity Matching for Vision-Based Tracking of Construction Workers Using Epipolar Geometry (영상 내 건설인력 위치 추적을 위한 등극선 기하학 기반의 개체 매칭 기법)

  • Lee, Yong-Joo;Kim, Do-Wan;Park, Man-Woo
    • Journal of KIBIM
    • /
    • v.5 no.2
    • /
    • pp.46-54
    • /
    • 2015
  • Vision-based tracking has been proposed as a means to efficiently track a large number of construction resources operating in a congested site. In order to obtain 3D coordinates of an object, it is necessary to employ stereo-vision theories. Detecting and tracking of multiple objects require an entity matching process that finds corresponding pairs of detected entities across the two camera views. This paper proposes an efficient way of entity matching for tracking of construction workers. The proposed method basically uses epipolar geometry which represents the relationship between the two fixed cameras. Each pixel coordinate in a camera view is projected onto the other camera view as an epipolar line. The proposed method finds the matching pair of a worker entity by comparing the proximity of the all detected entities in the other view to the epipolar line. Experimental results demonstrate its suitability for automated entity matching for 3D vision-based tracking of construction workers.

A Study on the Software Development to Automate the Calculation for the Landscape Architecture Construction Cost Estimation. (조경 공사 내역서 계산 자동화를 위한 소프트웨어 개발에 관한 연구)

  • 이규석;황국웅
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.20 no.2
    • /
    • pp.106-118
    • /
    • 1992
  • The landscape architecture construction cost estimation includes the repeated calculation and updating. Thus, it is time-consuming, and one of the jobs which needs to be automated first. In Korea, the IBM compatible personal computer(PC) is the most widely used one in the landscape architecture firms. However, the software for landscape architecture construction cost estimation is not being used in the PC environment. Therefore, the purpose of this study is to develop the software which can be used to automate the calculation for the landscape architecture construction cost estimation, and runs in the IBM compatible personal computers(PC). The clipper '88 summer is one of the DBMS software packages, and it has many commands and functions and functions which reduces program lines and makes the programing efficient, especially in the programing work whose total source code lines do not exceed over 10,000 lines. So, it was used in this study. The software developed in the this study was tested using the real data, and it was found that it can be efficiently used in the following jobs. They are: (1) to calculate exactly and rapidly. (2) to use resources repeatedly. (3) to print out the results. (4) to store data files for the future use. The software, as discussed in this paper, reduces the time and efforts to be spent in the calculation for the landscape architecture construction cost estimation compared with the traditional approach using the pocket calculator.

  • PDF

Robotics in Construction: State-of-Art of On-site Advanced Devices

  • Balzan, Alberto;Aparicio, Claudia Cabrera;Trabucco, Dario
    • International Journal of High-Rise Buildings
    • /
    • v.9 no.1
    • /
    • pp.95-104
    • /
    • 2020
  • Recently, robotic technologies have significantly improved, bringing considerable enhancements in many sectors; the main objective of this paper is to figure out if these innovations have also involved the building industry. To achieve this purpose, it has been considered crucial to first reshape and clarify some concepts, incorporating a much more flexible understanding of the term "robot", as well as the formulation of its future potential. Subsequently, it has been carried out an analysis of the various advanced devices that are currently available to be employed in the construction processes; the review includes a thorough classification of construction robots, divided into 18 families reflecting their purpose of use, and a dissection based on the term used to define them. The attention has been focused on the most updated and recent robots and, in their absence, on the most advanced machines prevailing. This operation has been achieved taking into account the development history of construction robots, as well as the analyses and classifications previously conducted, reconsidering them according to the just mentioned reflections. Furthermore, an in-depth exploration of the exoskeletons, as well as on a sophisticated robot recently developed by Schindler Group has been executed.

A Research on Effective Use of Three-Dimensional Models for Architectural Planning and Design (3차원 모델을 통한 설계정보의 효과적 활용방안에 관한 연구)

  • 정례화
    • Korean Institute of Interior Design Journal
    • /
    • no.29
    • /
    • pp.273-280
    • /
    • 2001
  • In architecture, each project participant must maintain organic relationship with others. However, current practices are rather procedural and discrete than organic, which result in considerable inefficiencies. The cool-downs of Korean construction market also force the architects to be familiar with the new construction methods and systems. This research mainly focuses on the pre-development stage of such systems, analysing relationships between the information of architectural design and other parts of construction information like structure, construction, environment, and so forth. The result of analysis can be organized into attributes of members in a physical building, which can be modeled in a 3D system. The resulting model can be used for automated generation of drawing, Bill of Materials, finite element meshes for structural analysis and energy analysis, etc. by extracting meaningful information from it. Hence, the purpose of this research is to analysis the relationship among domain-specific information (e.g. structural engineering, construction detail, energy evaluation) that are represented in drawings, and to represent the attributes of the information relevantly so that they can be applied to each unit task that forms the whole project. Therefore, an object oriented methodology is introduced to compose design informations in three dimension, and expressing properties of building factors and materials, and to construct a database for computers to recognize architecture informations.

  • PDF

Automation of Roadway Lighting Illuminance Measurement

  • BAO, Jieyi;HU, Xiaoqiang;JIANG, Yi;LI, Shuo
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.705-711
    • /
    • 2022
  • Roadway lighting is an integral element of a highway system. Luminaires on roadways provide viewing conditions for drivers and pedestrians during nighttime in order to improve safety. It is time-consuming and labor-intensive to manually measure roadway illuminance at predetermined spots with a handheld illuminance meter. To improve the efficiency of illuminance measurement, a remote-control electrical cart and a drone were utilized to carry an illuminance meter for the measurements. The measurements were performed on the marked grid points along the pavement. To measure the illuminance manually, one person measures illuminance at each grid point with the handheld meter and another person records the illuminance value. To measure the illuminance with the remote-control cart, the illuminance meter is attached to the cart and it measures illuminance values continuously as the cart moves along the grid lines. With the drone, the meter records the illuminance continuously as the drone carries the meter and flies along the grid line. Because the drone can fly at different heights, the measurements can be done at different altitudes. The illuminance measurements using the cart and the drone are described in detail and compared with manual measurements in this paper. It is shown through this study that automated measurements can greatly improve the efficiency of roadway illuminance data measurements.

  • PDF

A STUDY ON CONSTRUCTION SCHEDULE OPTIMIZATION INTEGRATING WITH CASH-FLOW

  • Hyung-Guk Lee;Dong-Pil Shin;Sung-Hoon An;Dong-Eun Lee
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.141-144
    • /
    • 2013
  • This paper presents a system called a Cash-flow based Construction Schedule Optimization system(CfSO). The existing CPM effectively handles schedule and cost management. However, funding strategy should be considered to obtain maximum profit and to progress a project favorably. One of measures is to coordinate the contract terms between owner and subcontractors (or suppliers). Contractor may decrease the interest cost attributed to project financing by adjusting the timing of cash-inflows and cash-outflows. It is an excellent method maximizing profits. This paper presents a method to estimate the amount of a cash-flow occurred periodically by integrating the terms of contract into scheduling. The proposed method is implemented as a system prototype in Microsoft Excel. This system provides a user an automated tool that identifies an optimal schedule that secures maximum profit by adjusting start and finish times of non-critical activities' free-floats without affecting on the project completion time. This system supports a project manager to establish an optimum project schedule and identifies profitable contractual conditions against to a construction owner.

  • PDF

Experimental Study for the Improvement of an Automated PHC Pile Head Cutter (PHC 파일 두부정리 자동화 장비 개선에 관한 실험적 연구)

  • Lee Jeong-Ho;Kim Myoung-Ho;Kim Young-Suk;Cho Moon-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.142-151
    • /
    • 2005
  • Several advanced countries have been continually developed PHC pile cutting automation machines for improving productivity, safety and quality of the conventional PHC pile cutting work. However, the target work of the previously developed PHC pile cutting automation machines is only crushing the head of PHC pile. Dangerous grinding work is still performed by workers with seven inch hand grinder. In domestic construction industry, the PHC pile cutting work is usually performed by a crusher and three to four skilled workers. Recent analysis results of the PHC pile cutting work reveal that it frequently makes a lot of cracks which significantly reduce the strength of the pile and is labor-intensive work. The primary objective of this study is to propose the end-effector which can effectively break PHC pile without any longitudinal cracks and to develop an automated pile cutting machine having unified grinder and crusher parts through a wide variety of laboratory and field tests. It is anticipated that the development of the automated pile cutting machine would be able to bring improvements in safety, productivity, quality as well as cost saving.