• Title/Summary/Keyword: Auger Crane

Search Result 3, Processing Time 0.016 seconds

Evaluation of Characteristics and Reliability of an Auger Crane with Built-in Hydraulic Extender (유압식 확장기가 내장된 오거 크레인의 특성 및 신뢰성 평가)

  • Kim, Jeom-Sik;Kwon, Sin-Won
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.59 no.1
    • /
    • pp.77-82
    • /
    • 2010
  • This study evaluated the characteristics and reliability of an auger crane with a built-in hydraulic extender. The field test of the hydraulic extender was performed with the hydraulic lines filled with hydraulic fluid and free of air. The pressure generated during the test was measured with a digital pressure gauge. The crane was considered to have undergone one cycle of the excavation process after it had performed excavation under three conditions at the same location. This process was performed three times in total. From the results of the excavation using the hydraulic extender, it was found that the maximum pressure and torque measured were 19.9 [MPa] and 895.4 [$kgf{\cdot}m$], respectively. The rotation force of the auger crane generated at this time signifies a horizontal force. If the excavation diameter of the auger crane is increased, the rotation speed is reduced causing the circumferential speed to also be reduced. The torsional shear stress of the extendable auger crane was calculated to be approximately 23.5 [MPa]. However, the rotation shaft material used for this system was carbon steel for machine structural use (SM45C). Since the minimum torsional yield stress is greater than 150 [MPa] according to KS D 3752, it means the equipment has secured a safety factor greater than 6. Therefore, it was found that when performing work using the extendable auger crane, it exhibited no problems with the safety and reliability of its shaft.

The Construction Quality Comparison and Analysis by Electric Poles Construction Method (건주 시공법에 따른 시공품질 비교 분석)

  • Kim, Jeom-Sik;Kwon, Se-Won;Park, Yong-Beom;Mun, Sung-Won;Jo, Seong-Mun;Kim, Do-Young;Ko, Ji-Hoon
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2009.10a
    • /
    • pp.247-249
    • /
    • 2009
  • Electric pole construction of distribution place is mainly operated by excavation work using auger crane and backhoe. Even though construction quality is affected by electric pole construction method and amount of excavation, construction is operated by workers' convenience in most of construction place. Therefore, in this paper, we analyze and compare effectiveness of electric pole quality using auger crane and backhoe when mechanized excavation through displacement experience of electric pole with ground strength.

  • PDF

The Construction Method on the Arch-type Anchor Block by means of Hight-adjustable Auger-crane with Hydraulic Expansion (신축형 오거크레인용 유압식 확장기를 이용한 아치형 전주근가 시공법)

  • Kim, J.S.;Kwon, S.W.;Park, Y.B.;Kwon, S.W.;Mun, S.W.;Cho, S.M.;Kim, D.Y.;Kwon, Y.M.
    • Proceedings of the KIEE Conference
    • /
    • 2008.04b
    • /
    • pp.19-21
    • /
    • 2008
  • 현행 배전선로의 전주근가(1.2m 장방형)는 오거크레인을 이용한 건주공사 완료 후 전주근가 시공을 위한 별도의 인력 또는 백호우 장비가 추가로 투입피어 시공함으로써 인력으로는 공사시간이 장기간 소요되고 백호우장비로는 작업장 환경훼손과 시공원가 상승의 문제점이 있었다. 이러한 문제점을 해소하기 위하여 건주공사에 사용되는 오거크레인의 굴착 직경을 80cm까지 확장 가능한 '신축형 오거크레인용 유압식 확장기'와 원형 굴착공에 시공이 가능한 '아치형 전주근가'를 개발하고 이를 이용한 시공기술을 개발함으로써 동일장소에서 굴착작업이 수반되는 건주작업, 전주근가 매설작업을 가능하게 하여 장비활용성 증대, 작업장 환경개선, 공사기간 단축 및 시공원가 절감 등의 효과가 기대되는 기술을 개발하였다.

  • PDF