• Title/Summary/Keyword: Assembly Work

Search Result 517, Processing Time 0.036 seconds

PROSPECTIVE ON DEVELOPMENT OF NUCLEAR POWER AND THE ASSOCIATED FUEL CYCLE IN CHINA

  • Gu Zhongmao;Liu Changxin;Fu Manchang
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 2005.11b
    • /
    • pp.156-164
    • /
    • 2005
  • The challenges China is facing in energy security are briefly discussed. Then, the development of nuclear power in China in the first half of 21 st century is envisioned, and it is expected that Generation-3 PWR nuclear power plants (NPPs) would be the leading units of nuclear power in the coming $30\~40$ years. As part of the nuclear power program, the R&D work on nuclear fuel cycle is generally proposed.

  • PDF

A study on elemental mercury adsorption behaviors of nanoporous carbons with carbon dioxide activation

  • Bae, Kyong-Min;Park, Soo-Jin
    • Carbon letters
    • /
    • v.15 no.4
    • /
    • pp.295-298
    • /
    • 2014
  • In this work, nanoporous carbons (NPCs) were prepared by the self-assembly of polymeric carbon precursors and block copolymer template in the presence of tetraethyl orthosilicate and colloidal silica. The NPCs' pore structures and total pore volumes were analyzed by reference to $N_2$/77 K adsorption isotherms. The porosity and elemental mercury adsorption of NPCs were increased by activation with carbon dioxide. It could be resulted that elemental mercury adsorption ability of NPCs depended on their specific surface area and micropore fraction.

Mixed-Model Sequencing Using Genetic Algorithms with Multiple Evaluation Criteria (다목적 유전 알고리듬을 이용한 혼합모델 조립라인의 최적 생산순서계획)

  • Kim, Yearn-Min;Kim, Young-Jin
    • IE interfaces
    • /
    • v.13 no.2
    • /
    • pp.204-210
    • /
    • 2000
  • This paper deals with the problem of mixed-model sequencing on an assembly line. In this sequencing problem we want to minimize the risk of the conveyor stoppage and the total utility work. This paper applies genetic algorithm to solve the mixed-model sequencing problem which is formulated as an integer programming. The solution we get from this algorithm is compared with the solution of Tsai(1995)'s.

  • PDF

A Production Planning System for an Automobile Components Manufacturer with a Flow Process (흐름생산방식의 자동차 부품업체를 위한 생산계획시스템 개발)

  • Kim, Kap-Hwan;Park, Soon-O;Kim, Ki-Young;Ok, Choong-Suk
    • IE interfaces
    • /
    • v.11 no.2
    • /
    • pp.1-11
    • /
    • 1998
  • In this paper, a case study is introduced on the development on a production planning system for the efficient control of work-in-process material flows. A special attention has been given to the prevention of the shortage of the automobile-components at the auto-assembly lines and the dynamic adaptation of the production plan to the continuously changing environment. The expertise of the production planner is analyzed and transformed into the logic of the software developed.

  • PDF

A Conceptual Model for Automated Cost Estimating Using Work Information Classification System of Apartment House (공동주택의 공사정보분류체계를 활용한 적산 자동화 개념 모형 개발)

  • Lee, Yang Kyu;Park, Hong Tae
    • Journal of the Society of Disaster Information
    • /
    • v.10 no.1
    • /
    • pp.15-24
    • /
    • 2014
  • The study presents work information classification system of apartment house which can organize all construction management services throughout the planning and management of a construction such as the decomposition of the design process, the assembly of construction process and cost estimating, etc. In addition, the study suggested a way to connect work information classification system based on a relational database in working order and built a conceptual model for automated cost estimating by utilizing established data base. A conceptual model for automated cost estimating will resolve the fundamental problems of the existing cost estimating system and will be able to take advantage of scientific cost estimating system at the construction site of apartment house.

Improvement of machining process for mold parts using on-machine measuring system and CAM automation (기상측정 및 CAM 자동화를 통한 금형 제작 공정 개선)

  • Park, Hae-Woong;Yun, Jae-Woong;Lee, Chun-Kyu
    • Design & Manufacturing
    • /
    • v.16 no.1
    • /
    • pp.21-26
    • /
    • 2022
  • In the CNC machining process, problems such as lowering of machine operation rate, setting errors, and machining precision occur due to the increase in setting time and preparation time. These machining errors cause delays in delivery and increase in cost due to an increase in the number of mounting and dismounting of the workpiece, an increase in measurement and reprocessing time, and an increase in the finishing time in the assembly process. Therefore, in this study, by automating the setting of the work piece using OMV (On Machine Verification), which is a meteorological measurement system, the preparation time for machining the work piece and the setting accuracy were improved, the rework rate was reduced, and the mold manufacturing process was shortened. Through the advancement, standardzation, and automation of the mold part manufacturing process, we have improved productivity by minimizing low-value-added repetitive tasks. In addition, the measurement time was reduced by more than 50% and the machining measurement rate was improved by more than 20%, eliminating repetitive work for correcting machining defects, and reducing the work preparation time by more than 15% through automatic setting.

A Study on the Development of a Work Operation Process Chart for Smart Distribution Board Fabrication (스마트 분전반 제작을 위한 작업 공정도 개발에 관한 연구)

  • Lee, Byung-Seol;Choi, Chung-Seog
    • Journal of the Korean Society of Safety
    • /
    • v.32 no.3
    • /
    • pp.15-20
    • /
    • 2017
  • This study presented the strength of the materials and parts for smart distribution board fabrication, and developed a work operation process chart for smart distribution board fabrication. This work operation process chart for smart distribution board fabrication complied with SPS-KEMC regulations, and the applicable range and object are less than 1,000 V and 1,000 Hz for the AC distribution board and less than 1,500 V for the DC distribution board. The power supply is 3 phase 4 wires ($3{\Phi}$ 4W), divided into a single phase circuit and a 3 phase circuit. In addition, the circuit was configured so that the leakage current flowing through the distribution line of the load could be monitored in real time by using the sensor module installed at the rear end of the circuit breaker. Therefore, the administrator can easily find the risk factor of the load since engineer can check the leakage current of each distribution line. In addition, if a leakage current greater than standard value flows, it is possible to generate an alarm against a short circuit and cut off the leakage current. The work operation process chart for the smart distribution board fabrication consists of the following steps: raw and subsidiary materials, sheet metal work, tube making, welding, painting, busbar fabrication, assembly and wiring, product inspection, shipment, etc. Moreover, symbols, ${\Delta}$, ${\nabla}$, ${\bigcirc}$, ${\Rightarrow}$, etc. were used according to the type of work and work progress so that workers can easily understand the progress of the work.

Job Route Selection Model for Line Balancing of Flexible PCB Auto-Insertion Line (유연 PCB 자동삽입라인의 부하 평준화를 위한 작업흐름선택모델)

  • Ham, Ho-Sang;Kim, Young-Hui;Chang, Yun-Koo
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.20 no.4
    • /
    • pp.5-21
    • /
    • 1994
  • We have described the optimal process route selection model for the PCB(printed circuit board) auto-insertion line. This PCB assembly line is known as a FFL(flexible flow line) which produces a range of products keeping the flow shop properties. Under FFL environments, we have emphasized the balancing of work-loads in order to maximize total productivity of PCB auto-insertion line. So we have developed a heuristic algorithm based on a work-order selection rule and min-max concept for the job route selection model.

  • PDF