• Title/Summary/Keyword: Assembly Building

Search Result 234, Processing Time 0.025 seconds

Workflow for Building a Draft Genome Assembly using Public-domain Tools: Toxocara canis as a Case Study (개 회충 게놈 응용 사례에서 공개용 분석 툴을 사용한 드래프트 게놈 어셈블리 생성)

  • Won, JungIm;Kong, JinHwa;Huh, Sun;Yoon, JeeHee
    • KIISE Transactions on Computing Practices
    • /
    • v.20 no.9
    • /
    • pp.513-518
    • /
    • 2014
  • It has become possible for small scale laboratories to interpret large scale genomic DNA, thanks to the reduction of the sequencing cost by the development of next generation sequencing (NGS). De novo assembly is a method which creates a putative original sequence by reconstructing reads without using a reference sequence. There have been various study results on de novo assembly, however, it is still difficult to get the desired results even by using the same assembly procedures and the analysis tools which were suggested in the studies reported. This is mainly because there are no specific guidelines for the assembly procedures or know-hows for the use of such analysis tools. In this study, to resolve these problems, we introduce steps to finding whole genome of an unknown DNA via NGS technology and de novo assembly, while providing the pros and cons of the various analysis tools used in each step. We used 350Mbp of Toxocara canis DNA as an application case for the detailed explanations of each stated step. We also extend our works for prediction of protein-coding genes and their functions from the draft genome sequence by comparing its homology with reference sequences of other nematodes.

Case of assembly process review and improvement for mega-diameter slurry shield TBM through the launching area (발진부지를 이용한 초대구경 이수식 쉴드TBM 조립공정 검토 및 개선 사례)

  • Park, Jinsoo;Jun, Samsu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.637-658
    • /
    • 2022
  • TBM tunnel is simple with the iterative process of excavating the ground, building a segment ring-build, and backfilling. Drill & Blast, a conventional tunnel construction method, is more complicated than the TBM tunnel and has some restrictions because it repeats the inspection, drilling, charging, blasting, ventilation, muck treatment, and installation of support materials. However, the preparation work for excavation requires time and cost based on a very detailed plan compared to Drill & Blasting, which reinforces the ground and forms a tunnel after the formation of tunnel portal. This is because the TBM equipment for excavating the target ground determines the success or failure of the construction. If the TBM, an expensive order-made equipment, is incorrectly configured at the assembly stage, it becomes difficult to excavate from the initial stage as well as the main excavation stage. When the assembled shield TBM equipment is dismantled again, and a situation of re-assembly occurs, it is difficult throughout the construction period due to economic loss as well as time. Therefore, in this study, the layout and plan of the site and the assembly process for each major part of the TBM equipment were reviewed for the assembly of slurry shield TBM to construct the largest diameter road tunnel in domestic passing through the Han River and minimized interference with other processes and the efficiency of cutter head assembly and transport were analyzed and improved to suit the site conditions.

IFC-based Representation Method of Part Information in Superstructure Module of Modular Steel Bridge with Assembly System (모듈러 강교량 상부모듈의 조립체계 정의를 통한 IFC 기반의 부품정보 표현방법)

  • An, Hyun Jung;Lee, Sang-Ho
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.25 no.4
    • /
    • pp.307-314
    • /
    • 2012
  • IFC-based representation method of part library for superstructure module of modular steel bridge is proposed. The library is capable of efficiently offering and exchanging part information in process of manufacture, assembly, design, and construction of modular steel bridge. Entities, representing physical part information in IFC model, are matched semantically with parts of the superstructure module for representation of part information with IFC model. Either types of matched entities are applied in order to verify the role of each part, or new types are defined as a user-defined types. In addition, assembly system has been classified and defined into 4 levels of LoD(Level of Detail) to provide appropriate part information efficiently from the part library in each step of the process. Then, new property is defined for representing the LoD information with IFC Model. Finally, IFC-based test library of modular steel bridge is generated by applying the matched entities and entity types to the actual the superstructure module of modular steel bridge.

Interactions between the National Assembly and the Executive in Korea: With Emphasis on Legislative, Budgetary and Investigatory Powers (국회와 정부의 관계: 입법권, 재정권, 국정조사권을 중심으로)

  • Park, Jai-Chang
    • Korean Journal of Legislative Studies
    • /
    • v.15 no.1
    • /
    • pp.39-63
    • /
    • 2009
  • Retrospecting the past 60 years of interactions between the executive and the legislature in Korea, it is found that the Korean National Assembly is neither a minimal legislature nor a marginal legislature any more. The symbolic role of the Assembly has acquired a remarkable growth and profound strength and there is no need to worry about institutional viability any further. However, its role as a resolver or manager of social conflicts is still under the dominance of the executive and shows even an indication that it might be worsened. Such incapability of the legislature owed much to the vertical control from the outside especially during the authoritarian regimes, however, nowadays it owes much to the inability of consensus building among the out-bursting controversial and horizontal opinions inside of it. Not sufficient managerial capability required for exercising autonomous decision making power efficiently is a major detrimental factor. It traces back to the inability of party politics and demassifying political leadership. Normalization of party politics is identified as one of the essential prerequisites for Korean political development in this regard.

Anchored blind bolted composite connection to a concrete filled steel tubular column

  • Agheshlui, Hossein;Goldsworthy, Helen;Gad, Emad;Mirza, Olivia
    • Steel and Composite Structures
    • /
    • v.23 no.1
    • /
    • pp.115-130
    • /
    • 2017
  • A new type of moment-resisting bolted connection was developed for use in composite steel- concrete construction to connect composite open section steel beams to concrete filled steel square tubular columns. The connection was made possible using anchored blind bolts along with two through bolts. It was designed to act compositely with the in-situ reinforced concrete slab to achieve an enhanced stiffness and strength. The developed connection was incorporated in the design of a medium rise (five storey) commercial building which was located in low to medium seismicity regions. The lateral load resisting system for the design building consisted of moment resisting frames in two directions. A major full scale test on a sub-assembly of a perimeter moment-resisting frame of the model building was conducted to study the system behaviour incorporating the proposed connection. The behaviour of the proposed connection and its interaction with the floor slab under cyclic loading representing the earthquake events with return periods of 500 years and 2500 years was investigated. The proposed connection was categorized as semi rigid for unbraced frames based on the classification method presented in Eurocode 3. Furthermore, the proposed connection, composite with the floor slab, successfully provided adequate lateral load resistance for the model building.

ROBOTICS AND AUTOMATION IN CONSTRUCTION INDUSTRY

  • Younus Khan;G. Chandra Sekhar Reddy;V.S.S. Kumar
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.527-532
    • /
    • 2005
  • The construction industries are facing problems of productivity, quality of work, safety, and the completion of projects in time. In construction industry a worker is exposed to hazardous environment, and has to do more physical work, effecting his health and also productivity. The automation and robotics can offer solution to many problems of the industry. In the past the major barrier to construction automation is the lack of electronic components and systems. This is solved now with the development of information technology, and the current obstacle is the high cost of automated systems, shortage of public money for R&D, and problems of acceptance. The robots employed in construction have followed the same concept as those employed in manufacturing. However, construction industry requires a different kind of robot compared to manufacturing Industry. The robots are stationery and product moves along the assembly line in manufacturing sector, but construction robots have to move about the site because buildings are stationary and of large size. The construction robots must function in adverse weather conditions, including variation in humidity, and temperature and increase the overall construction productivity rate. The major objective of the paper is to review the existing applications of building robots and to assess their implementation in building industry. A case study is considered for the implementation of robots for the painting work of the University Building at Saifabad PG College of Science, Hyderabad, India.

  • PDF

3D PLM(Product Life cycle Management) & CPC(Collaborative Product Commerce)

  • Choi, Woo-Suk
    • Proceedings of the CALSEC Conference
    • /
    • 2001.08a
    • /
    • pp.597-614
    • /
    • 2001
  • Level 0: The Marekting Buzzword : □Confusion between DMU and Visualization □Having a Mobile Data Viewer/Analyser is Anyway a Prerequisite Level 1: Digital Pre-Assembly (DPA): □Building Digital Prototype before Physical Build □Usually a job for Packaging or Prototype Teams □Usually no time Left to take Feed-back into account before Actual Build Level 2: Design in Context: □All Designers within Car Maker do Local DMU before DPA Level 3: Design in Extended Context □Design in Context Expanded to Suppliers(omitted)

  • PDF

Strength Measurements of Slim Floor Composite Beams used Perforated Square Shape Steel Pipe (천공된 각형강관을 이용한 슬림플로어 합성보의 내력실험)

  • Kim, Dong-Yeon;Rhim, Hong-Chul;Park, Sung-Woon;Kim, Do-Kyun;Lyum, Seung-Il;Park, Dae-Won
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.189-190
    • /
    • 2015
  • Slim Floor construction method has to increase the available surface area thereby reducing the depth beams and slab. In addition, In this study compostie beam assembly of plates, square-shape steel pipe and deck plate. So workabiltiy is superior to the upper concrete possible without formwork. In the present study is strength test in progress in development slim floor composite beam used plate and perforated square shape steel pipe and obtained anlysis and conclustion of the experimental results.

  • PDF

A Study on Interior & Exterior Finishing Materials by Architectural Usage of the Building (건축물 용도에 따른 내 외부 마감 재료의 사용에 관한 연구)

  • Kim So-Hee
    • Korean Institute of Interior Design Journal
    • /
    • v.14 no.2 s.49
    • /
    • pp.55-62
    • /
    • 2005
  • In modern days when architectural materials have grave impacts on overall design expression, materials for architecture, modern architecture into the service facility for business, education, religion, cultural assembly and residence, and evaluates each finishing material mainly used in exterior, lobbies and entrances of the building since the 1970's. When being applied social images into firstly selected materials, the scopes for material selection will be more narrowed down in more practical way. High tensity materials are suitable for public and active space and low tensity are for private and static area. This principle enables us to use architectural materials as one of the important elements which express the whole characteristics of the area.

Fabrication of Colloidal Clusters of Polymer Microspheres and Nonspherical Hollow Micro-particles from Pickering Emulsions

  • Cho, Young-Sang;Kim, Tae-Yeol;Yi, Gi-Ra;Kim, Young-Kuk;Choi, Chul-Jin
    • Bulletin of the Korean Chemical Society
    • /
    • v.33 no.1
    • /
    • pp.159-166
    • /
    • 2012
  • We have introduced the Pickering emulsion systems to generate novel confining geometries for the selforganization of monodisperse polymer microspheres using nanoparticle-stabilized emulsion droplets encapsulating the building block particles. Then, through the slow evaporation of emulsion phases by heating, these microspheres were packed into regular polyhedral colloidal clusters covered with nanoparticle-stabilizers made of silica. Furthermore, polymer composite colloidal clusters were burnt out leaving nonspherical hollow micro-particles, in which the configurations of the cluster structure were preserved during calcination. The selfassembled porous architectures in this study will be potentially useful in various applications such as novel building block particles or supporting materials for catalysis or gas adsorption.