• Title/Summary/Keyword: Assembly Building

Search Result 234, Processing Time 0.029 seconds

Seismic Response Amplification Factors of Nuclear Power Plants for Seismic Performance Evaluation of Structures and Equipment due to High-frequency Earthquakes (구조물 및 기기의 내진성능 평가를 위한 고주파수 지진에 의한 원자력발전소의 지진응답 증폭계수)

  • Eem, Seung-Hyun;Choi, In-Kil;Jeon, Bub-Gyu;Kwag, Shinyoung
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.24 no.3
    • /
    • pp.123-128
    • /
    • 2020
  • Analysis of the 2016 Gyeongju earthquake and the 2017 Pohang earthquake showed the characteristics of a typical high-frequency earthquake with many high-frequency components, short time strong motion duration, and large peak ground acceleration relative to the magnitude of the earthquake. Domestic nuclear power plants were designed and evaluated based on NRC's Regulatory Guide 1.60 design response spectrum, which had a great deal of energy in the low-frequency range. Therefore, nuclear power plants should carry out seismic verification and seismic performance evaluation of systems, structures, and components by reflecting the domestic characteristics of earthquakes. In this study, high-frequency amplification factors that can be used for seismic verification and seismic performance evaluation of nuclear power plant systems, structures, and equipment were analyzed. In order to analyze the high-frequency amplification factor, five sets of seismic time history were generated, which were matched with the uniform hazard response spectrum to reflect the characteristics of domestic earthquake motion. The nuclear power plant was subjected to seismic analysis for the construction of the Korean standard nuclear power plant, OPR1000, which is a reactor building, an auxiliary building assembly, a component cooling water heat exchanger building, and an essential service water building. Based on the results of the seismic analysis, a high-frequency amplification factor was derived upon the calculation of the floor response spectrum of the important locations of nuclear power plants. The high-frequency amplification factor can be effectively used for the seismic verification and seismic performance evaluation of electric equipment which are sensitive to high-frequency earthquakes.

A Study of the Indoor Air Quality Improvement for Large Scale Assembly Facilities (건축물의 대공간 집회시설의 실내공기질 개선방안에 관한 연구)

  • Lim, Tae-Sub;Kang, Seung-Mo
    • Korean Institute of Interior Design Journal
    • /
    • v.20 no.4
    • /
    • pp.183-190
    • /
    • 2011
  • Lately majority of churches have preferred to enlarge their worship area to both horizontal and vertical axis. According to expand their area which brings more devotees to the limited service area. Transform from a small church into a large church is no longer unprecedented issue in South Korea. As the size of church getting bigger, many unexpected issues become matters. One of the significant problem is that the number of people have experienced either fall a sleep or feel a doziness during their service period. Due to the limited condition for the specific building type such as religion facility(church), IAQ improvements is seriously concerned. Therefore, we are going to examine by using simulation tool, CF, a difference of ventilation efficiency about the location and number of windows, and find the best way of the ventilation efficiency in a multi-stories type church by changing the exhaust pipes location and size. Furthermore, in this thesis, by changing a ceiling height from the existing building to confirm that $CO_2$ have been satisfied for both the ventilation efficiency and IAQ.

Transition Analysis of Friction Factor According to Pumping Pressure in Pumping Test Using High Strength Concrete for High-rise Buildings

  • Kwon, Hae-Won;Kim, Young-Su
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.4
    • /
    • pp.400-406
    • /
    • 2013
  • In high-rise buildings, high-strength concrete is widely used to reduce the section of structure members under axial load. Also, the price increase of materials is very important item in the high-rise buildings. Especially, concrete used high-pressure pump due to consecutive structural assembly. Unlike slump type of ordinary concrete, high strength concrete has different properties of concrete pumping due to viscosity. However, there have been no Korean studies on the pumping properties of high strength concrete. Therefore, this paper measures the friction factor of high strength concrete with changes in the pressure of concrete pumping. We analyzed the trends of the friction factor based on changes in the pressure of concrete pumping, and then calculated the quantity of concrete deposited for each specified concrete strength and location of placement. After comparing these results with the quantity of concrete deposited measured in field, we evaluated the pumping properties of high strength concrete. Through the tests and the review, we attempt to suggest some basic information for the In-Situ application of high strength concrete.

A Study on Optimal Lead Time Selection Measures of the Construction Materials (건설자재의 적정 리드타임 산정에 관한 연구)

  • Lee, Sang-Beom
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.1
    • /
    • pp.105-110
    • /
    • 2004
  • Resource procurement is an important management area because cost of resource covers 40% of total construction project cost and resource delivery has direct relationship with project performance. Integration of cost provides various potentials for effective and efficient project control. This study investigates the usefulness of time in resource procurement management focused on materials. These days, construction projects have characterized manufacture because of industrialization and component. Therefore, application of systematic resource planning has been requested in the construction. There are many companies conducting procurement of resource on the web by applying MRP, ERP etc. in the construction. However, in applying them in the construction yet, there is obstruction. MRP has the character doing its function under accurate cost prediction of resource. But prediction of resource is difficult in industry mechanism of the construction. If accurate cost prediction of resource is possible in the construction, it will be expected to reduce cost of procurement of resource substantially by applying successful resource planning model in the manufacture. On the basis of recent current, the purpose of study is to present procurement of resource system that period observance of construction and minimization of stock is possible by reflecting accurate lead-time to apply proactive thought to be able to cope with alteration of construction schedule efficiently in analyzing resource planning of the construction site.

The Cognitive and Economic Value of a Nuclear Power Plant in Korea

  • Lim, Gil-Hwan;Jung, Woo-Jin;Kim, Tae-Hwan;Lee, Sang-Yong Tom
    • Nuclear Engineering and Technology
    • /
    • v.49 no.3
    • /
    • pp.609-620
    • /
    • 2017
  • We studied the value of a nuclear power plant by considering Koreans' willingness to pay (WTP) for neutralizing the various problems caused by building and operating a new plant. For this, we used a conjoint analysis and ordered logistic regression. We then compared the WTP estimates between various segment groups. The results revealed that each household was willing to pay an additional 99,677 Korean Won (KRW)/mo on average to resolve the negative impacts from a nuclear plant. Therefore, the yearly cognitive and economic value of a nuclear plant in Korea was about 19 trillion KRW. Through a segment analysis, we found that the more educated, younger, and poorer groups gave higher cognitive values than the less educated, older, and richer groups, respectively. Also, people who lived far from a plant gave higher values than people living near a plant, and people with more knowledge about or interest in nuclear energy gave higher values than people with less knowledge or interest. People who felt that nuclear energy is necessary gave higher values to nuclear energy than those who did not. Our results can be used as bases to set targets for promoting nuclear energy and pursuing a national project of building a nuclear power plant.

Seismic assessment of Nitinol Belleville Elastic Nonlinear (NI-BELL-E-N) structural system

  • Hadad, Alireza Asgari;Shahrooz, Bahram M
    • Steel and Composite Structures
    • /
    • v.43 no.3
    • /
    • pp.375-388
    • /
    • 2022
  • Nibellen structural system is a novel resilient bracing system based on the application of Bellville disks and Nitinol rods. The cyclic behavior of Nibellen assembly was obtained, and the design equations were developed based on the available literature. Seismic performance of the system was then studied analytically. Two groups of buildings with different lateral force resisting systems were designed and studied: one group with the Nibellen system, and the other with the special concentrically braced frame system. Each building group consisted of 5-, 10-, and 15-story buildings. The Design-Base-Event (DBE) and Maximum Considered Event (MCE) were considered as the seismic hazard, and a suite of seven ground motions were scaled accordingly for response history analyses. Finally, the resiliency of the buildings was studied by obtaining the functionality curve of the buildings before and after the seismic event. The construction cost of the 5-story building with Nibellen bracing system increased but the post-earthquake cost decreased significantly. The application of Nibellen system in the 10- and 15-story buildings reduced both the construction and repair costs, considerably. Resiliency of all the buildings was improved when Nibellen system was used as the lateral force resisting system.

Risk Analysis of Lifting Work for Risk Assessment of Modular Construction (모듈러 건축 현장의 위험성평가를 위한 양중작업 위험요소 분석)

  • Jun, Young-HUN;Kim, Kyoon-Tai;Jeon, Eun-Bi
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.291-292
    • /
    • 2021
  • In modular construction, it is insufficient for safety management of workers, and workers are still exposed to the risk of accidents due to work at high places for lifting and assembly work in modular construction sites. Therefore, it is necessary when preventive safety management through risk management of workers on modular construction sites. This study is a basic study for the risk assessment(checklist) of modular construction, and the purpose of this study is to analyze the risk factors of the module lifting work at the modular construction site. It is intended to identify the hazard risk factors and improvement measures of the existing lifting operation, by analyzing the case of the risk assessment of the existing RC method, and to identify the risk factors for each work process when lifting the module. In the future, the results of this study are expected to be utilized in the development of checklists for risk assessment as safety management plan for modular construction sites.

  • PDF

Validity Elevation Scheme of Quality Inspection System for Defect Prevention & Management in Apartment Housing Construction (공동주택 하자예방 및 관리를 위한 품질점검제도의 실효성 제고방안 연구)

  • Park, Geun-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.220-221
    • /
    • 2020
  • Strarting with Buyeong Apartment in Dongtan-2 disrict in 2017, collective complaints of residents are frequently occurring due to low quality problem such as improper construction and defects of apartment houses. Because of this, the Ministry of Land and Transport is preparing a comprehensive improvement scheme to improve the quality of Apartment Housing(AH), taking into account the continuing complaints from the residents of AH and the problem raised by the National Assembly. The basic profile of the improvement scheme is induce the tenants and experts to discover and point out defects that are repaired until the date of use inspection or due date. For this purpose, we suggested this defects management system linkaged by the preliminary inspection and quality inspection system for prospective occupants. In this context, this paper aims to suggest an effective likage method between the preliminary inspection of prospective residents and the quality inspection system implemented by local governments as an ordinance.

  • PDF

A Study on the Implementation of Coexistent Reality Technology for Ship Outfitting Inspection (선박 의장 검사를 위한 공존현실 기술 적용에 관한 연구)

  • Ha, Yeon-Chul;Kim, Jin-Woo;Kim, Goo;Shin, Hyun-Shil
    • Journal of the Institute of Convergence Signal Processing
    • /
    • v.21 no.1
    • /
    • pp.13-20
    • /
    • 2020
  • In shipyards, internal materials are assembled after designing and manufacturing each ship's block. Internal material assembly means the installation of parts and equipment except ship's body. In this process, if the assembly of pipes and equipment existing in the block is not done correctly during the assembly between blocks, this causes a lot of costs. In addition, even if the assembly of the internal materials already completed, the production efficiency of the ship is reduced due to rework when problems such as space arrangement of the internal materials occurs. Therefore, this study introduces space arrangement and inspection system before and after hull outfitting work based on coexistence reality technology using 3D design drawing to solve these problems. The various coexistence reality algorithms and inspection systems developed and introduced in this study are based on AR service, which has never been introduced in Korea. So it will be widely applicable to various manufacturing industries using design drawings such as automobiles and architectures as well as ship building process.

Electron Accelerator Shielding Design of KIPT Neutron Source Facility

  • Zhong, Zhaopeng;Gohar, Yousry
    • Nuclear Engineering and Technology
    • /
    • v.48 no.3
    • /
    • pp.785-794
    • /
    • 2016
  • The Argonne National Laboratory of the United States and the Kharkov Institute of Physics and Technology of the Ukraine have been collaborating on the design, development and construction of a neutron source facility at Kharkov Institute of Physics and Technology utilizing an electron-accelerator-driven subcritical assembly. The electron beam power is 100 kW using 100-MeV electrons. The facility was designed to perform basic and applied nuclear research, produce medical isotopes, and train nuclear specialists. The biological shield of the accelerator building was designed to reduce the biological dose to less than 5.0e-03 mSv/h during operation. The main source of the biological dose for the accelerator building is the photons and neutrons generated from different interactions of leaked electrons from the electron gun and the accelerator sections with the surrounding components and materials. The Monte Carlo N-particle extended code (MCNPX) was used for the shielding calculations because of its capability to perform electron-, photon-, and neutron-coupled transport simulations. The photon dose was tallied using the MCNPX calculation, starting with the leaked electrons. However, it is difficult to accurately tally the neutron dose directly from the leaked electrons. The neutron yield per electron from the interactions with the surrounding components is very small, ~0.01 neutron for 100-MeV electron and even smaller for lower-energy electrons. This causes difficulties for the Monte Carlo analyses and consumes tremendous computation resources for tallying the neutron dose outside the shield boundary with an acceptable accuracy. To avoid these difficulties, the SOURCE and TALLYX user subroutines of MCNPX were utilized for this study. The generated neutrons were banked, together with all related parameters, for a subsequent MCNPX calculation to obtain the neutron dose. The weight windows variance reduction technique was also utilized for both neutron and photon dose calculations. Two shielding materials, heavy concrete and ordinary concrete, were considered for the shield design. The main goal is to maintain the total dose outside the shield boundary less than 5.0e-03 mSv/h during operation. The shield configuration and parameters of the accelerator building were determined and are presented in this paper.