A Case Study on the Appropriate Construction Personnel of the Typical Floor of Apattment Frame Construction Using the Queueing Model (대기행렬 모형을 활용한 아파트 골조공사 기준층 인적 자원관리 선정사례에 관한 연구)

  • Lee, JeongWon;Kim, BoHee;Ham, NamHyuk;Kim, JaeJun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.3-14
    • /
    • 2022
  • Quantitative analysis of the number of construction workers and construction period can present a new standard for appropriate personnel. This study presents a Queueing model that predicts the execution time of work procedures, the most important factor among work efficiency indicators. During the working cycle of apartment frame construction the same process tends to be repeated the volume of contruction. Based on these characteristics, this study used a Queueing Model and analyzed reference layer cycle of the delayed frame construction. After adjusting the number of people and the construction period, the performance of the model was analyzed and suggested. This study aims to support the decision making of personnel distribution according to the volume of construction by performing a performance analysis of the Queueing Model.

TECHNICAL PROPOSAL BASED COST REDUCTION BIDDING SYSTEM FOR SUPPLYING AFFODABLE HOUSING

  • Seunghee Kang;Jeongseok Lee;Gunhee Cho;Jeongrak Sohn;Jongdae Bang
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1433-1439
    • /
    • 2009
  • Best value is the ultimate goal of the owner and can thus have diverse meanings according to the project characteristic, owner's purpose, user groups' payment capability, etc.. Recently, resettlement problems of the marginalized members in the urban regeneration area have been issued in Korea because they have no capability to purchase (or lease) redeveloped housing (or apartment). It means that a minimized production cost for reducing supply price of housing is a key factor in establishing the best value of the marginalized members. The lowest-price bidding system serves the purpose of ensuring a minimized production cost, but due to the low-cost investments, it creates various problems, such as sloppy construction, lowered quality, an increased LCC, and worsening profitability for builders. Thus, to help them resettle, it is necessary to supply affordable housing geared towards a certain appropriate quality and minimum construction costs. Towards this end, this study aimed to propose a cost reduction bidding system based on a technical proposal. The proposed technical-proposal-based cost reduction bidding system consists of the following components: work-unit-based, project-unit-based, and construction-period-reducing technical proposals. These components are evaluated to select the best bidder for a given project. The technical proposal based cost reduction bidding system proposed herein is expected to provide facilities with appropriate supply prices and appropriate quality levels, to bolster the technological competitiveness of builders.

  • PDF

A Study on the Improvement of Long-Term Continuing Construction Contracts Dispute Using FGI (FGI를 활용한 장기계속공사계약 분쟁 개선방안 기초연구)

  • Kim, Jae-Sik;Lee, Jung-Won;Lee, Min-Jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.2
    • /
    • pp.79-87
    • /
    • 2023
  • Given that most government contracts are based on a fiscal year, long-term continuing construction contracts require appropriate provisions as significant amounts of budget is supposed to be invested for several years. This study drew problems and improvements of the long-term continuing construction contracts by analyzing the contents of FGI and list of construction order. We found that a number of problems, such as the mismatch between laws and enforcement decrees, difference in calculating overheads due to the extension of construction period, many construction orders that are hard to see as budget efficiency and over investment in the final annual contract, were tangled up in the process. To solve the problems mentioned, we suggested several improvements as follows: (1) effect of total construction period and total amount should be guaranteed by a law, (2) it is suggested that the scope of long-term continuing construction contract is determined by a law, and (3) it should be clear about the calculation of overheads concerned with the extension of construction period as well as the estimation of construction period to prevent over investment in the final contract.

A Study on Evaluation of Optimal Construction Method of BTL Projects - Focused on Educational Facilities - (BTL 적용 교육시설의 최적 건축공법 평가에 관한 연구)

  • Park, Yoo-Young;Cho, Bong-Ho;Kim, Ki-Hyun;Lee, Chun-Kyong;Park, Tae-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.3
    • /
    • pp.22-31
    • /
    • 2009
  • In the buildings of educational facilities ordered by BTL projects, the competent authorities, private business, and users of school get to have a deep conflict, due to extra expenses resulted from shortening of construction period and establishment of temporary school building, and inconveniences users of school have to undergo during semester. This study aims at solving immediate problems in the aspect of construction method, proposing several alternative plans, including RC construction method generally applied to construction of the existing school, and modular construction method that is emerged as an alternative method for educational facilities lately, along with the method of construction appropriate for BTL projects of educational facilities, calculating cost of construction required for each alternative plan, analyzing and evaluating period of construction.

건설현장 관리기사의 안전관리 효과에 대한 인식도

  • 고병인;임현교
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 1998.05a
    • /
    • pp.265-270
    • /
    • 1998
  • As the goal of enterprises is to pursuit benefits, the goal of safety management is not only preventing accidents but also promoting benefits and productivity. However, enterprises have failed to realize the necessity of safety management, partly because they didn't grasp any appropriate evidences advocating effectiveness of safety management. This study aimed to survey construction-site engineers' consciousness on safety management contributing to cost reduction, construction period and quality enhancement. The result of this study showed that constriction-site engineers recognized the ratio of direct cost to Indirect cost as 1:2. The proportion of repliers who thought that safety management is contributable to cost reduction was 35%, to construction period was 20%, and to quality enhancement was 48%. The construction sites with excellent safety accomplisments also had good work and selling amounts.

  • PDF

A study on the Aluminium Beam Methods for Building a Stone Finished Envelope (석재 외피 시공을 위한 알루미늄 빔 지지공법 연구)

  • Kim, Jang-Ook;Lee, Young-Lae;Hong, Seong-Wook;Doh, Sun-Boong;Lee, Han-Seung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.235-242
    • /
    • 2012
  • In recently constructed building, It has become fashionable again that the heavy external skin system such as a Stone Finished Envelope. There are Squared Steel Pipe Methods, C-Shaped Steel Pipe Methods, and Aluminum Beam Methods in the structure of a heavy external skin system. The Aluminum Beam Methods is often misunderstood as a Plane Truss Structure, but this method is not appropriate to be called to a truss structure but a beam methods. The Aluminum Beam Methods is the most Eco-friendly methods in terms of Quality assurance, Efficiency, Safety, Construction period, Durability, and Recyclability. And this Methods is also very appropriate in considering the point of Energy conservation, Waste reduction, Long-life architecture, Replacement parts, Environmental protection, Public efficiency, and Building demolition.

  • PDF

Economic Evaluation on Energy System Using River Water (하천수 이용 열원시스템의 경제성 평가)

  • Lee, Chulgoo;Kim, Jongdae;Im, Taesoon;Choi, Myungsik;Pang, Seungki;Ham, Heungdon
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.9 no.2
    • /
    • pp.25-31
    • /
    • 2013
  • It has become very important for unused energy to be used for building air conditioning. Economic evaluation on energy system by using river water as a heat source, which is one of the unused energy, was carried out. The floor area of the building and the distance between heat source equipment and river was assumed $50,000m^2$ and 200 m. General heat source system using absorption chiller-heater was used for comparing to the energy saving system, and payback period method using initial cost and running cost of two systems, was used to perform economic evaluation. According to development of high capacity of water source heat pump which is appropriate for using river water, initial cost for the system has been reduced. Payback period was about 3.2 years, and this period might be shortened if nation's economic support enact.

EBS for BIM based maintenance management of Thermal Power Plant (BIM기반 화력발전시설 유지관리를 위한 EBS(Elements Breakdown Structure)개발)

  • Kim, Chang-Soo;Cha, Sang-Hoon;Ji, Soung-Min
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.81-82
    • /
    • 2015
  • BIM has been a reliable construction project management tool to handle various kinds of construction information generated in the facility life cycle. To take these advantages, researchers have been promoted numerous studies in a residential, a commercial, and an educational facilities with a large number of on-going projects. However, despite running as the role of essential energy supplier, power plant related BIM research is relatively insufficient than others. In particular, due to the extending of the facility service period and the requirement of the complicated construction project management for 'overhaul' and 'repowering' in the power plant maintenance phase, the needs for using BIM have been increased gradually. For using BIM based maintenance, it is needed to consider an information collecting methods and necessary to develop an appropriate breakdown structure to share information. Therefore, 'EBS' is produced by reviewing the previous research related to BIM and analyzing the repair activities in the maintenance phase. Proposed 'EBS' must be useful not only a judgment between capital expenditure versus revenue expenditure but also appropriate maintenance strategies development for property management.

  • PDF

A Study on the Application of Modular Construction Method for Demand Responsive Dormitory Facilities (수요대응형 기숙사시설을 위한 모듈러공법 적용 방안)

  • Kim, Han Eol;Lim, Hyoung Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.259-260
    • /
    • 2021
  • Currently, the school-age population continues to decline in Korea due to social factors. On the other hand, the dormitory facilities are constantly being built and renovated. There are many problems such as construction period and on-site waste when constructed with reinforced concrete structures, which are existing construction methods. Accordingly, dormitory facilities shall be constructed using appropriate construction methods. Therefore, in this study, we will collect and organize basic data on the use status and modular system of dormitory facilities and study efficient maintenance and management when modular construction method is applied to dormitory facilities with changing demand.

  • PDF

Delay Factors Based on the Importance of Finish Work in Apartment Construction Project (공동주택 마감공사 중요도 기반 작업지연 요인 분석)

  • Lee, Seung-Hoon;Lee, Sang-Hyo;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.125-129
    • /
    • 2010
  • The ultimate goal of construction is to complete the given work in the most economical and safest way within the required construction period while meeting the quality standards specified in the design drawing. There are a few characteristics of finish work. First, executed in subdivided processes, finish work involves a very diverse and complex structure. Second, there are no criteria for each segmented process with regard to the appropriate time of input. Third, it is not very necessary to set priorities for lead and lag works. This study intends to provide information on the completion of a project in accordance with the required duration by setting priorities in the delay of each detailed process of finish work to minimize delay in finish work. In this study, finish work is divided into wet work and other types of finish work, and the importance of each process is classified based on the given details of each process. In addition, the study employs a survey to analyze delay factors of a designer, a constructor, and a supplier. Using the survey results, the study sets priorities in delay of final work to provide information on the completion of an apartment project within the planned construction period.