Apartment house project cost schedule for integrated management BIM-based BoQ application plan (공동주택 프로젝트 비용일정통합 관리를 위한 BIM 기반 BoQ 구축 및 활용 방안)

  • Zheng, Lianyi;Kim, Woong-Gi;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.11 no.2
    • /
    • pp.1-16
    • /
    • 2021
  • Since entering the 21st century, the construction industry has developed faster and faster, and more and more technologies have been applied in the construction industry. BIM technology (Building Information Modeling) was born in this environment. The application of BIM technology can greatly improve the efficiency of cost management and help achieve the goal of cost management. But through BIM to realize project cost management, there is still no good solution. In order to solve this problem, this paper puts forward the concept of WBS structure applied to construction projects by studying the BoQ (Bill of Quantities) list based on BIM, and proposes the numbering method of the structure. The WBS (Work Breakdown Structure) structure proposed in this paper divides more than 5000 cost objects into 133 projects according to the type of work and project schedule. This structure helps to realize the application of BIM in project cost management. Although this article has studied more than 5000 data of three projects, it does not think that it can cover all cost objects in the existing construction industry. The purpose of this article is to propose a solution for cost and Process Control using BIM-based BoQ data.

A study on the Human Resource Management through Application of Daily Scheduling Check System (일일 공정 Check System을 활용한 인력관리 사례 연구)

  • Park Chan-Jeong;Park Hong-Tae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.124-132
    • /
    • 2004
  • A human resource management of the general contractors is to mostly deal with daily input by each subcontractor in construction fields. However, this way has some limitations; the identification of proper human-input and productivity, preventive activities or efforts for minimizing schedule delay. The reason why these limitations are that few systematic efforts through a coordinated field administration with the construction schedule planning and human resources. Therefore, on the basis of the construction schedule planning, human resource management of subcontractors is necessary to make for an improvement in construction schedule control. Daily Scheduling Check System(DSCS), as the linked human resources on an existed CPM scheduling software, was developed and this paper then verified validity and effectiveness of using the DSCS for the framework of some actual apartment construction projects

A Development of Evaluation Index for Bus Demand-Elastic Schedule Management (수요탄력적 버스배차관리를 위한 평가지표 개발 및 적용)

  • Lee, Ho-Sang;Chang, Hyun-Ho;Kim, Young-Chan;Hwang, Kyong-Soo
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.8 no.2
    • /
    • pp.1-13
    • /
    • 2009
  • Although enormous data have been collected in major cities (Korea) by APTS(Advanced Public Transit Systems), most of studies related to bus schedule management evaluation have confined to headway adherence and on-time performance. Therefore, bus operation management have been very lack of using APTS data. This study uses coefficient of correlation to evaluate bus company's schedule management level. However, direct application of coefficient of correlation has inequitable problem because of many limitation(number of vehicle, headway, etc). and so variable calibration method was developed and applied to cope with these problems. Thus, demand-elastic management evaluation index was developed. For verifying the equity of developed index, it is applied to Seoul bus routes. It is expected for the developed index to contribute into the demand-elastic management of bus schedule.

  • PDF

Development of Integrated Cost-Schedule Management Guidelines for EPC Modular Projects (EPC 모듈러 프로젝트의 원가·공정 통합연계관리 지침서 개발)

  • Kim, Donghee;Ha, Minhui;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.76-84
    • /
    • 2020
  • The rate of application of the modular plant in the plant industry is increasing, and for the success of the modularization projects, it is essential to develop and implement a systemized methodology across all phases of the project. However, Korean EPC firms lack project management capability when it comes to apply standardized methodology. Therefore, it is important to establish and systematize the cost/schedule integrated management method which are the two core elements of project management technology. This study was conducted to develop a methodology and guidelines for integrated management process for modular plant projects. The researchers developed a methodology for planning and managing cost and schedule, and integrated by module unit. Integrated cost and schedule methodology and guidelines developed can be used for various EPC modular plant projects to enhance the efficiency of project management.

A Study of Development for Travel Management Application (여행 관리 어플리케이션 개발에 관한 연구)

  • Park, Kwangsoo;Kim, Yongchun;Moon, SongChul
    • Journal of Service Research and Studies
    • /
    • v.4 no.2
    • /
    • pp.49-56
    • /
    • 2014
  • Lately, We have experienced increasing of Smartphone. Therefore we have experienced increasing of Application for Smartphone. This study suggested Tour Management Application using the smartphone. When you travel, you need various information This study of Development for Application provide that guide of travel destination provide means of transportation, time of travel, traveling expensives management. This application will use conveniently This application provide various information of travel and this application will use tool of new mobile business.

  • PDF

Application Method of Phase Division of Fast Track for Construction Project with Complex Structures (복합공종으로 구성된 건설공사의 패스트트랙 단계구분 적용 방식 분석)

  • Kim, Hyun Soo;Hwang, Jae Yoeng;Kang, Hyo Jeong;Park, Sang Mi;Lee, Jae Hee;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.1
    • /
    • pp.95-105
    • /
    • 2022
  • Recently, as the scale of a construction project has become larger and more complicated, there are many cases where construction projects with complex structures are carried out in a fast track method to save construction duration. In the fast track method, the proper division of construction phases is an important issue in determining the overall project period. This study presents a rational phase division method that can be applied when a construction project with complex structures is carried out as a fast track. For this study, a subdivided work breakdown structure (WBS) is developed using the construction of 4 soccer stadiums as application examples, and the schedule is analyzed by dividing the construction process of major phases. To this end, five proposals are applied to analyze the adequacy of the fast track phase division. For the draft with the minimum construction period, the fast track phase division and the schedule model of by each phase were presented. This methodology can have an application in the appropriate phase division and schedule model by construction phase when fast track is applied in large construction project of a similar size.

The Development of application for intelligent electrical system drawing generation program (Intelligent 전기계통 도면작성 Application 기술개발)

  • Cho, Sung-Don;Yoo, Gi-Hong
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.2220-2221
    • /
    • 2008
  • 전기계통설계 도면인 Single Line Diagram(단선도), Schematic Diagram(전개접속도), Cable Block Diagram/Cable Schedule, Cable Termination/Connection Diagram(단말결선)의 도면 상호간 데이터 연계에 의한 자동, 통합형태의 Intelligent 전기계통 도면 작성 프로그램 개발에 대한 기본적인 방향에 대하여 소개하고자 한다.

  • PDF

The Development and Application of Schedule Management Tools in Building Construction (건설 공정리스크 관리도구 개발 및 활용방안)

  • Jung Woo-Joon;Yoon You-Sang;Suh Sang-Wook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.384-387
    • /
    • 2004
  • It is very important to manage the risk in building construction because construction process has too many internal risk compared with others. So construction managers need more developed risk management system than the Present. While the study for the solution and management of generated risk is comparatively enough, the effort to confirm the risk of construction phase on pre-construction phase haying an major effect on total duration, is insufficient. For supporting the schedule risk management of pre-construction, this study suggests the reclassified risk breakdown structure and the investigation form for advance preparations on pre-construction Phase, which help the Poorly experienced construction manager to make more correct decisions and efficiently to execute risk management.

  • PDF

A Study on the EVMS for successful application to KHP program (한국형 헬기 시제품 개발을 위한 EVMS 적용방안에 관한 연구)

  • We, Oh-Gie;Chung, Ho-Su
    • Journal of the military operations research society of Korea
    • /
    • v.32 no.1
    • /
    • pp.73-89
    • /
    • 2006
  • In this paper, EVMS procedure for KHP program is presented. Research and development of a defense system as a long lead program has a high probability of cost growth due to the uncertainty and risk. Therefore, meeting schedule, technical performance and preventing excessive cost overrun are the main concerning point to successful research and development program. EVMS(Earned Value Management System) is a program management system using earned value to control cost, schedule and technical performance. In order to control cost and schedule and to meet technical performance requirements of the KHP research and development program, it is necessary for us to adapt EVMS to the program.

User context conjecture system using location and schedule information

  • Ogasawara, Naohito;Sato, Kiwamu;Nunokawa, Hiroshi;Shiratori, Norio;Noguchi, Shoichi
    • Proceedings of the Korean Society for Emotion and Sensibility Conference
    • /
    • 2002.05a
    • /
    • pp.152-155
    • /
    • 2002
  • In recent years, with the spread of communication media, such as a cellular phone and E-mail, we are able to communicate with others without any restriction of position or time. However, complexity of communicative context has increased so that user has to guess a partner user's situation and status in order to use various medias efficiently. This problem will grow larger as new media are brought in the expanding communications network. To solve this problem, we propose the system that guesses the context in communication by a user's media from the position information on PHS (Personal Handy phone System) and schedule information from schedule application. In this system a user's agent guesses automatically the context that owner has set, and answers the demand of the context from a partner user. Moreover, the agent decides a suitable answer, when there is a demand of communication by the media, which cannot be used.

  • PDF