• Title/Summary/Keyword: Apartment unit plan

Search Result 169, Processing Time 0.021 seconds

A Study on the Improving Speech Intelligibility of Emergency Broadcast Equipment in the Apartments (공동주택 내 비상방송설비의 음성명료도 실태 분석 및 재실자 인지성 개선방안 연구)

  • Oh, So-Young;Cho, Hyun-Min;Lee, Young-Ju;Lee, Min-Joo;Yoon, Myung-Oh
    • Fire Science and Engineering
    • /
    • v.32 no.4
    • /
    • pp.60-68
    • /
    • 2018
  • Due to the complicated plan structure of the apartment units and the improved room-to-room sound insulation performance, it is difficult to communicate and recognize the fire situation by emergency broadcast equipment. In this study, speech intelligibility was measured and analyzed for three types of apartment unit by emergency broadcast equipment on various measurement points. Simulations were also conducted to improve the speech intelligibility. As a result of field measurements 72, 84, and 101 Type were not satisfied with NFSC standard of 90 dBA at the point of 1 m distance from source. In addition, it was evaluated that 75 dBA and CIS 0.7 of NFPA standard was not satisfied at all measurement points except for the 72 Type at living room point with door opened condition. Based on the door opened condition of the bedroom, it satisfied the NFPA of 75 dBA and CIS 0.7 in each bedroom when more than 90 dBA was satisfied at the 1 m separation point provided in NFSC standard.

Development of Economic Analysis Indicators and Case Scenario Analysis for Decision-making support for Off-Site Construction Utilization of Apartment Houses (OSC 활용 의사결정 지원을 위한 경제성 분석 지표 개발 및 사례 시나리오 분석 - 공동주택 PC공법을 중심으로 -)

  • Yun, Won-Gun;Bae, Byung-Yun;Shin, Eun-Young;Kang, Tai-Kyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.6
    • /
    • pp.24-35
    • /
    • 2023
  • Recently, the Ministry of Land, Infrastructure and Transport presented the '6th Construction Technology Promotion Basic Plan' and 'Smart Construction Revitalization Plan (2022.7.20)'. Off-Site Construction (OSC), which involves construction and production of PC (Precast Concrete) and Modular, etc., has advantages in shortening the construction period, reducing costs, improving quality, reducing construction waste, and reducing safety accidents. However, the construction cost is high compared to the traditional RC construction method, which has hindered its utilization and spread. In this study, OSC utilization was improved. An economic analysis indicator and methodology that can support decision-making in the planning and design stages for multi-unit housing were proposed. The factors used in the economic analysis of OSC (based on the PC method) of apartment houses were reviewed. As for the indicators used in the cost and benefit section, 'Construction Period', 'Disaster Occurrence', 'Waste Generation', and 'Greenhouse gas Emission', which reflect the technical advantages of OSC, were derived. In addition, a scenario analysis was conducted based on actual apartment housing case data for the presented economic analysis indicators and benefit calculation standards. The level of benefit that offsets the difference between the existing RC construction method and the construction cost was reviewed. In future studies, it will be necessary to conduct additional case studies to apply the measurement criteria for detailed indicators and supplement the benefit indicators.

Flexible Unit Floor Plan of Off-Site Construction Housing Considering Long-Lasting Housing Certification System (장수명주택 인증을 고려한 OSC공법 주택의 가변형 평면계획 연구)

  • Lee, Ji-Eun;Roh, Jeong-Yeol;Kwon, Soo-Hye;Kim, Seung-Mo
    • Land and Housing Review
    • /
    • v.12 no.4
    • /
    • pp.103-117
    • /
    • 2021
  • With the current rapid changes in population and technology, the long-lastig housing certification system is a means of prolonging the physical and functional lifespan of a building. The certification requires differentiation between the structure and infill elements to allow for variability and ease of repairs. This works well with prefabricated houses so this study investigated the possibility of applying the long-lastig housing certification requirements to apartment construction using off-site construction (OSC) methods focused on the installation of bathrooms (plumbing and toilet) that differ from the traditional wet method. This study examined three different sized floor plans at 22 m2, 46 m2, and a combined one resulting in 69 m2. The larger 69 m2 plan utilized a removeable non-load bearing wall to increase flexibility in the layout of the floorplan. The apartments are constructed of steel reinforced concrete composite columns on a 9 m × 10.5 m grid with integrated slabs. The exterior and interior infill walls are all non-load bearing with some containing plumbing. This separation of the structure and infill walls can help meet some of the criteria in the long-lastig housing certification, particularly with the ease of repairs. Technologies that facilitate the replacement of infill elements that contain plumbing and other building services can benefit the nation by reducing carbon emissions and therefore tax incentives should be introduced to increase the adoption of the proposed construction methods.

Elasto-plastic Earthquake Response Analysis of Beam-Shear Wall Structural System (보-전단벽식 구조 시스템의 탄소성 지진응답 해석)

  • 정명채;이정원
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.1 no.1
    • /
    • pp.57-67
    • /
    • 1997
  • The objective of present paper is to investigate elasto-plastic behaviour and estimate the resistance capacity of a beam-shear wall structural system against earthquake ground accleration exciations. Pushover analysis is adopted to estimate inttiate and post stiffnesses and yielding point for inelastic response analysis in LPM (Lumped Parameter Mass) model, and modified Clough model is used as the hysteresis rule of each story. Three earthquake waves are used in the analysis but their peak ground accelerations are changed to be 0.12g, 0.24g. It is assumed that the earthquakes act in the longigtudianl direction of a 25 Story apartment building which consists of two some unit plan. The distribution of story ratio and ductility ratio are estimated and discussed within Korean, Japanese code and UBC.

  • PDF

Construction Cost Analysis of the Prototype for Partial Rent in the Long-life Housing - Focused on the 59 m2 -sized Housing Units in the Long-life Validation Complex - (세대분리를 고려한 장수명주택 보급모델의 공사비 분석 - 장수명주택 실증단지 단위세대 59 m2 를 중심으로 -)

  • Kang, Ji-Yeon;Kim, Hyung-Geun;Kim, A-Hyun;Kim, Su-Am
    • Journal of the Korean housing association
    • /
    • v.28 no.1
    • /
    • pp.109-117
    • /
    • 2017
  • It becomes increasingly important to develop sustainable housing to protect environment. The certification system for long-life housing was made to use houses for more than one hundred years in 2014. The long-life housing should be able to meet new demands by change of the population structure; low birthrate, aging and increase of single households. Therefore, it is necessary to suggest a prototype of long-life housing for partial rent. The objective of this study is to suggest a prototype for dividing housing in the long-life validation complex, which has design consideration for dividable house. The construction costs of a prototype for dividing housing is evaluated by comparing with other prototype without regard to dividing housing. The results were as follows: (1) The prototype for diving housing should be added an entrance, bathroom, kitchen for tenant, and above all, maintenance fees for tenant have to be managed seperately from house owner. (2) The equipment system for dividing housing should be designed when planning the space of house. However, design for diving housing should be reflected the unit plan at a minimum on what will and will not happen.

Case study on frequency bands contributing the single number quantity for heavy-weight impact sound based on assessment method changes (중량충격음 평가방법 변화에 따른 단일수치평가량 기여 주파수 대역 사례 분석)

  • Hye-kyung Shin;Sang Hee Park;Kyoung-woo Kim
    • The Journal of the Acoustical Society of Korea
    • /
    • v.42 no.6
    • /
    • pp.565-571
    • /
    • 2023
  • With the introduction of the post-verification system, the measurement of floor impact noise performance on-site has become mandatory, and the evaluation method has changed. To track the performance changes since the policy implementation, research is needed on how the characteristics of heavyweight impact sound change according to the varied evaluation method. In this study, we analyzed the contribution rate of the frequency band-specific sound pressure level on the single-number quantity for a multi-family housing unit with the same floor plan and floor structure, comprising 59 households, based on the changed impact sources and evaluation indicators. It is difficult to compare simply because the method of calculating contributions by frequency band according to the single-day evaluation is different, but the average contribution rate of 63 Hz was 80.8 % in the evaluation method before the introduction of the post-confirmation system (Tire measurement and evaluated as L'i,Fmax,AW), and the average contribution rate of 125 Hz was 19.2 %. The current evaluation method (rubber ball measurement and evaluation as L'iA,Fmax) shows that the contribution rate has decreased to 33.1 % on average at 50 Hz ~ 80 Hz, 58.7 % on average at 100 Hz ~ 160 Hz, 6.9 % on average at 200 Hz ~ 315 Hz, and 1.3 % on average at 400 Hz ~ 630 Hz. This result is a case analysis for the target apartment house, and it is necessary to analyze measurement data for more diverse apartment houses.

Structural Behavior of Slab in the Partial Demolition for the Apartment Remodeling (아파트 리모델링을 위한 부분해체에서 슬래브의 구조적 거동)

  • Choi, Hoon;Joo, Hyung Joong;Kim, Hyo Jin;Yoon, Soon Jong
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.16 no.2
    • /
    • pp.19-30
    • /
    • 2012
  • Due to the fact that the social environment is improved and the urban development is stabilized, the demand of new construction of apartment becomes slowdown. Accordingly, there are many researches to lengthen the service life of the existing apartment through the remodeling and its importance is continuously rising. However, reliable design specifications and guidelines for the design of remodeling with partial demolition are not provided yet in Korea. Specially, in the apartment remodeling, slab collapse accidents take major portion in all accidents that reported by Korean Government. It is very important to prevent intial crack of slab because intial crack could cause severe accident like collapse of all structure in a short period of time. The purpose of this study is to develop structural guidelines that could guarantee the structural safety and serviceability of slab structure and could be adopted in Korean remodeling with partial demolition. There are mainly two components to determine structural behavior of slab structure. One is the shape of slab structure and the other is load which is resisted by the slab structure. In this study, the weight per unit volume of concrete debris and concrete strength are estimated through the analysis of previous researches to recognize the relationship between the shape of slab and load that loaded on the slab. Accordingly, approximately 300 pieces of floor plan are collected and analyzed. The finite element analysis is conducted using these analyzed and estimated results. From the finite element analysis results, the limited stacking height of debris is suggested and the stacking method is also discussed. In addition, to find the relationship between movement of demolition equipment and structural behavior of slab, the static and dynamic loading tests are conducted. From the results of loading tests, the impact factor which will be considered in the remodeling design could be estimated.

Constructability Analysis in Aged-Housing Remodeling Demolition Work for Maximizing Waste Recycling (폐기물 재활용성 향상을 위한 리모델링 철거공사의 시공성 평가 및 사례적용)

  • Chae, Seong-Hyun;Kim, Ki-Hyun;Cha, Hee-Sung;Kim, Kyung-Rai;Han, Ju-Yeoun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.13-22
    • /
    • 2010
  • From now on, the aged apartment or house is expected to increase rapidly. So, we have to build a process of remodeling and develop the new technique. Demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stability of building. Therefore, we need a step to develop a assessment system, verify and make specified. This paper evaluated how much improve on construction speed, work efficiency, intensity of work and influence with another process comparing the existing method with the new demolition method. The qualitative and quantitative assessment system are developed with these output. The case study was carried out experimental group and control group, based on developed assessment system, which have the same condition. The existing method was made up of 3 steps- 1)Demolish windows, doors and iron goods, 2)Demolish indoor and outdoor walls, 3)Drop the waste. The new demolition method was made up of 5 steps- 1)Demolish windows, doors and iron goods, 2)Demolish the ceiling and wall's finishing materials, 3)Demolish the floor's finishing materials, 4)Demolish indoor and outdoor walls, 5)Drop the waste. Work time, idle time, the character of a work unit are analyzed by mock-up test. This study's output is expected to establish a systematic process of new demolition method and based on the maximizing waste recycling work in our construction industry.

A Case Study on Health Impact Assessment from Incinerator Operation in New Towns - Human Risk Assessment due to Heavy Metals Inhalation - (신도시 내 소각로 운영에 대한 건강영향평가 사례 연구 - 중금속 흡입에 따른 인체 위해도 평가 -)

  • Myung, Nho-Il;Lee, Young-Soo;Shin, Dae-Yewn
    • Journal of Environmental Impact Assessment
    • /
    • v.19 no.3
    • /
    • pp.271-279
    • /
    • 2010
  • We conducted a quantitative human health risk assessment with respect to inhalation of heavy metals for residents of housing developments in "new towns" where an incinerator will be operated within the area scheduled for construction thereof. To assess potential human health risk we calculated the amount of heavy metals emitted from the incinerator, and then forecasted the potential health impact on adjoining areas where new housing is to be developed (i.e. "new towns") at different altitudes by a using SCREEN-3 model. We assessed Cancer Risk (CR) caused by known carcinogens using the Inhalation Unit Risk criteria developed by the US Environmental Protection Agency. Notably, we assessed risk by determining concentrations of heavy metals on a floor by floor basis, as apartment buildings are to be constructed near the incinerator according to a pre-devised plan. Results indicated that cancer risk for most carcinogens exceeded US EPA standards for the highest locations at each collection point. This result indicates that construction of high buildings in areas adjoining incinerators is undesirable, and that measures to lower carcinogens are needed. The results of this study, which assessed health risk from exposure to heavy metals emitted from a nearby incinerator, can be useful in land use planning with respect to the location of housing developments in new towns, as well as the heights of any buildings constructed. Furthermore, the methodology deployed herein with respect to risk assessment can be helpful for policy makers and the general public in the event of conflicts regarding incinerator projects in the future. The results herein may also be of merit in determining priorities when establishing harm reduction measures for carcinogens at incinerators. However, the study does contain several limitations. The SCREEN-3 model, a kind of screening model that provides conservative results, can provide higher forecasted concentrations of air pollutants than other models. Moreover, although the incinerator in question is set to be a thermoselect type, domestic data for emissions from these incinerators is not available, and assumptions were based on a stoker type incinerator. Insufficient domestic data likewise compelled the use of data of USA, resulting in possible errors in results. Continued research will thus be required to develop systematic methodologies that address the foregoing factors and produce more reliable outcomes.