• Title/Summary/Keyword: Annual electricity generation

Search Result 54, Processing Time 0.03 seconds

Evaluation of Electricity Generation According to Installation Type of Photovoltaic System in Residential Buildings (주거용 건물 태양광발전시스템의 설치유형에 따른 발전성능 평가)

  • Kim, Deok-Sung;Kim, Beob-Jeon;Shin, U-Cheul
    • Journal of the Korean Solar Energy Society
    • /
    • v.37 no.2
    • /
    • pp.35-45
    • /
    • 2017
  • The types of installation of the photovoltaic system applied to domestic residential buildings are classified as follows: Mounted modules with air circulation, semi-integrated modules with air duct behind, integrated modules with fully insulated back. In order to study generation characteristics of PV system, we verified the validity of interpretation program based on long-term measurement data of demonstration house installed in BAPV form and also analyzed the generation characteristics and performance of each installation type. The results are as follows. First, the RMSE of amount of generation and simulation according to annual daily insolation of demonstration system located in Daejeon was 0.98kWh and the range of relative error of monthly power generation was -5.8 to 3.1. Second, the average annual PR of mounted modules was 82%, semi-integrated modules 76.1% and integrated modules 71.9%. This differences were attributed to temperature loss. Third, the range of operating temperature of annual hourly photovoltaic modules was -6.5 to $61.0^{\circ}C$ for mounted modules, $-6.0{\sim}73.9^{\circ}C$ for semi-integrated modules and -5.5 to $88.9^{\circ}C$ for integrated modules. The temperature loss of each installation type was -14.0 to 16.1%, -13.8 to 21.9%, and -13.6 to 28.5%, respectively.

Evaluating Economic Feasibility of Solar Power Generation Under the RPS System Using the Real Option Pricing Method: Comparison Between Regulated and Non-regulated Power Providers (실물옵션을 활용한 RPS 실시에 따른 태양광 발전의 경제성 평가: 공급의무 발전사와 일반 발전사와의 비교)

  • Kim, Eun-Man;Kim, Myung-Soo
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.26 no.9
    • /
    • pp.690-700
    • /
    • 2013
  • This study reviewed how the changes of the government policy on solar power generation projects affected the annual mandatory quotas of the regulated power providers under the RPS (renewable portfolio standard) system and analysed economic feasibility of the investment for meeting their quotas as compared to the case of non-regulated power providers. The analysis results showed that under the discount rate of 7.5%, which was used for the annual national electricity plans for the recent years, both the regulated and non-regulated power providers achieved economic feasibility under both the NPV (net present value) method and the real option pricing method. It was also shown that higher profitability was attained by non-regulated power providers than by their regulated counterparts, which can be attributable to the fact that regulated providers are required to out-source 50% of the total quota. The results of this study are considered to be useful for establishing a meaningful mid term or long term strategy for the future of solar power generation linked to the current RPS system.

Water Allocation Policy and its Implications in the Waikato Region

  • Brown, Edmund
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2012.05a
    • /
    • pp.11-17
    • /
    • 2012
  • The Waikato River is New Zealand's longest River, though relatively small on international scales. It drains the central North Island and has New Zealand's largest lake (Lake Taupo) at its headwaters. The upper reaches have sustained flows fed by large aquifers which are recharged by rainfall events providing relatively constant river flows, whereas the lower reaches respond more directly to rainfall events having more peaky flows after rainfall and extreme low flows during dry periods. Consumptive allocation from the river is relatively low with only about 3% of the mean annual flow being allocated. However, more than seven times the river's flow is allocated for non-consumptive purposes before discharging to the Tasman Sea. The majority of this non-consumptive allocation is for hydro power generation and as cooling water at both thermal and geothermal power stations which produce up to 25% of New Zealand's electricity. The upper half of the river has been heavily modified with the construction of eight dams for power generation. This has resulted in a succession of cascading dams replacing the previously uncontrolled river. The Waikato River also provides drinking water for Auckland City (NZ's largest city) and Hamilton City (NZ's 4th largest city). In recent years there has also been considerable growth in water requirements for pasture irrigation to support the intensification of dairy farming in the catchment. Operators of the power stations are concerned that any further consumptive allocation will further reduce their ability to generate electricity. The Waikato Regional Council, who is charged with managing the river and allocation of water, has recently set new rules for managing the conflicting allocation demands on the Waikato River. This has resulted in an end to further allocation of water where it results in a loss of water for electricity generation from renewable resources (fresh water and geothermal water). The exception to this is the prioritisation of water for municipal supplies ahead of other consumptive uses such as industries and irrigators.

  • PDF

Energy Performance Evaluation of Building Micro-grid System Including Micro-turbine in Hospital Buildings (마이크로터빈이 포함된 빌딩마이크로그리드시스템의 병원건물의 에너지성능평가)

  • Kim, Byoung-Soo;Hong, Won-Pyo
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2009.10a
    • /
    • pp.279-283
    • /
    • 2009
  • Distributed generation(DG) of combined cooling, heat. and power(CCHP)has been gaining momentum in recent year as efficient, secure alternative for meeting increasing energy demands. This paper presents the energy performance of microturbine CCHP system equipped with an absorption chiller by modelling it in hospital building. The orders of study were as following. 1)The list and schedule of energy consumption equipment in hospital were examined such as heating and cooling machine, light etc. 2) Annual report of energy usage and monitoring data were examined as heating, cooling, DHW, lighting, etc. 3) The weather data in 2007 was used for simulation and was arranged by meteorological office data in Daejeon. 4) Reference simulation model was built by comparison of real energy consumption and simulation result by TRNSYS and ESP-r. The energy consumption pattern of building were analyzed by simulation model and energy reduction rate were calculated over the cogeneration. As a result of this study, power generation efficiency of turbine was about 30% after installing micro gas turbine and lighting energy as well as total electricity consumption can be reduced by 40%. If electricity energy and waste heat in turbine are used, 56% of heating energy and 67% of cooling energy can be reduced respectively, and total system efficiency can be increased up to 70%.

  • PDF

Economic implications of optimal operating conditions in a full-scale continuous intermittent cycle extended aeration system (ICEAS) (실규모 연속유입간헐폭기 공정(ICEAS)에서 최적운전조건이 경제성에 미치는 영향)

  • Yong-jae Jeong;Yun-Seong Choi;Seung-Hwan Lee
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.38 no.1
    • /
    • pp.29-38
    • /
    • 2024
  • Wastewater management is increasingly emphasizing economic and environmental sustainability. Traditional methods in sewage treatment plants have significant implications for the environment and the economy due to power and chemical consumption, and sludge generation. To address these challenges, a study was conducted to develop the Intermittent Cycle Extended Aeration System (ICEAS). This approach was implemented as the primary technique in a full-scale wastewater treatment facility, utilizing key operational factors within the standard Sequencing Batch Reactor (SBR) process. The optimal operational approach, identified in this study, was put into practice at the research facility from January 2020 to December 2022. By implementing management strategies within the biological reactor, it was shown that maintaining and reducing chemical quantities, sludge generation, power consumption, and related costs could yield economic benefits. Moreover, adapting operations to influent characteristics and seasonal conditions allowed for efficient blower operation, reducing unnecessary electricity consumption and ensuring proper dissolved oxygen levels. Despite annual increases in influent flow rate and concentration, this study demonstrated the ability to maintain and reduce sludge production, electricity consumption, and chemical usage. Additionally, systematic responses to emergencies and abnormal situations significantly contributed to economic, technical, and environmental benefits.

Annual Base Performance Evaluation on Cell Temperature and Power Generation of c-Si Transparent Spandrel BIPV Module depending on the Backside Insulation Level (스팬드럴용 투광형 결정계 BIPV창호의 후면단열 조건에 따른 연간 온도 및 발전성능 분석 연구)

  • Yoon, Jong-Ho;Oh, Myung-Hwan;Kang, Gi-Hwan;Lee, Jae-Bum
    • Journal of the Korean Solar Energy Society
    • /
    • v.32 no.4
    • /
    • pp.24-33
    • /
    • 2012
  • Recently, finishing materials at spandrel area, a part of curtain-wall system, are gradually forced to improve thermal insulation performance in order to enhance the building energy efficiency. Also, Building Integrated Photovoltaics(BIPV) systems have been installed in the exterior side of the spandrel area, which is generally composed of windows. Those BIPVs aim to achieve high building energy efficiency and supply the electricity to building. However, if transparent BIPV module is combined with high insulated spandrel, it would reduce the PV efficiency for two major reasons. First, temperature in the air space, located between window layer and finishing layer of the spandrel area, can significantly increase by solar heat gain, because the space has a few air density relative to other spaces in building. Secondly, PV has a characteristics of decreased Voltage(Voc and Vmp) with the increased temperature on the PV cell. For these reasons, this research analyzed a direct interrelation between PV Cell temperature and electricity generation performance under different insulation conditions in the spandrel area. The different insulation conditions under consideration are 1) high insulated spandrel(HIS) 2) low insulated spandrel(LIS) 3) PV stand alone on the ground(SAG). As a result, in case of 1) HIS, PV temperature was increased and thus electricity generation efficiency was decreased more than other cases. To be specific, each cases' maximum temperature indicated that 1) HIS is $83.8^{\circ}C$, 2) LIS is $74.2^{\circ}C$, and 3) SAG is $66.3^{\circ}C$. Also, each cases yield electricity generation like that 1) HIS is 913.3kWh/kWp, 2) LIS is 942.8kWh/kWp, and 3) SAG is 981.3kWh/kWp. These result showed that it is needed for us to seek to the way how the PV Cell temperature would be decreased.

A Study on the Optimum Design Flowrate for Tunnel-Type Small Hydro Power Plants

  • Lee, Chul-Hyung;Park, Wan-Soon
    • Korean Journal of Hydrosciences
    • /
    • v.3
    • /
    • pp.81-96
    • /
    • 1992
  • This study represents the methodology for feasibility analysis of small hydro power SHP plant. Cumulative density function of Weibull distribution and Thiessen method were adopted to decide flow duration curve at SHP candidate site. The perfomance prediction model and construction cost estimation model for tunnel-type SHP plant were developed. Eight tunnel -type SHP candidate sites existing on Han-river were selected and surveyed for actual site reconnaissance. The performance characteristics and economical feasibility for these sites were analyzed by using developed models. As a result, it was found that the optimum design flowrate with the lowest unit generation cost for tunel-type SHP candidate site were the flowrate concerming with between 20% and 30% of time ratio on the flow duration curve. Additionally, primary design specifications such as design flowrate, effective head, capacity, annual averageload factor, annual electricity production were estimated and discussed for eight surveyed SHP candidate sites.

  • PDF

Case Studies of Energy-Saving Method for Renewable Energy Installation in Sewage Treatment plant (하수처리장 신재생에너지 설치 사례 연구를 통한 에너지 절감 방안)

  • Yoon, Jong-Won;Kim, Chu-Young;Choi, Chang-Kyu
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.4
    • /
    • pp.42-48
    • /
    • 2014
  • Sewage treatment facilities can purify sewage enough to be send to river or sea water, that discharged from human life and industrial activities. In the sewage treatment process, we can get large amount of by-product energy resources and materials such as heat of sewage, digester gas and purified water etc., it can be utilized by applying various technologies thereby we can reduce energy consumption in the process. In this paper, it was analyzed using the data collected from the operational case study for the energy savings effect that can be obtained when using the digester gas, one of the by-product materials of sewage treatment process, for electric power generation. Cost of 623million won is an annual reduction of 4,032MWh corresponding 9% of the annual electricity consumption of the sewage treatment plant, such an alternative power generation using digester gas was proposed in this paper has been verified the feasibility of the proposed reduction of energy.

Selection of Available Sector to Measure Power Generation for Validation of Wind Turbine Performance (풍력터빈 성능 검증을 위한 출력측정 유효영역 선정)

  • Oh, Ki-Yong;Jun, Hoon;Lee, Jun-Shin
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2009.06a
    • /
    • pp.525-528
    • /
    • 2009
  • Power generation of wind turbine which is installed in wind farm should be measured to predict economic feasibility of wind farm. Also electric power company want to verify wind turbine performance which is stated by manufacturer. The International Electrotechnical Commission(IEC) published 61400-12-1 "Power performance measurements of electricity producing wind turbines" for test of wind turbine power performance. In this paper, measurable sector of wind speed is analysed based on IEC 61400-12-1 to verify power curve of wind turbine with various wind turbine in wind farm.

  • PDF

A Study on Working Characteristic of 50kW single crystal Photovoltaic System (50kW 단결정 태양광 발전시스템 운전특성연구)

  • An, Sang-Hyeon;Kim, Byung-Hyun;Park, Ji-Hong;Ahn, Hyung-Keun;Han, Deuk-Young
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2007.06a
    • /
    • pp.194-195
    • /
    • 2007
  • This paper presents the experimental operation of invertactive 50kW photovoltaic system for monitoring periods. Form these performance monitoring results, the PV system performance has been evaluated and analyzed for component perspective. It has produced a regression equation. Using the equation, it is possible to estimate the annual electricity generation. The result of this study will be used to determine the appropriate capacity of PV system in different systems.

  • PDF