• Title/Summary/Keyword: Annual cost

Search Result 704, Processing Time 0.03 seconds

Economic Evaluation far the Application of the Distribution Automation System (배전자동화시스템 적용을 위한 경제성 평가)

  • Hong, Soon-Hak;Ha, Bok-Nam;Kim, Ho-Yong;Jung, Kyung-Hee
    • Proceedings of the KIEE Conference
    • /
    • 1993.07a
    • /
    • pp.36-38
    • /
    • 1993
  • This study considers the economic aspect of the distribution automation system, which is the decision-making criteria of the electric utilities for the investment. The feeder automation candidate region is divided into two types of the urban and the rural. The total investment cost of the feeder automation for each type is estimated. The annual cost, is also estimated, by finding the fixed charge rate. To compare the annual cost and the economic effect cost, for the investment decision-making, the costs are quantitatively estimated on the following effects : the manpower replacement, the outage cost saving, the main transformer utilization improvement, the feeder utilization improvement, and the line loss reduction.

  • PDF

On the Cost Analysis of Container Physical Distribution System in Pusan Port (부산항 컨테이너 물류 시스템의 비용분석에 관하여)

  • 박창호;이철영
    • Journal of the Korean Institute of Navigation
    • /
    • v.15 no.3
    • /
    • pp.13-24
    • /
    • 1991
  • This paper aims to determining the optimal capacity of Pusan port in view point of Container Physical Distribution cost. It has been established a coast model of the container physical distribution system in Pusan port is composed of 4 sub-systems and in-land transport system. Cargo handling system, transfer & storage system and in-land transport system, and analyzed the cost model of the system. From this analysis, we found that the system had 7 routes including in-land transport by rail or road and coastal transport by feeder ship between Pusan port and cargo owner's door. Though railway transport cost was relatively cheap, but, it was limited to choose railway transport routes due to the introducing of transport cargo allocation practice caused by shortage of railway transport capacity. The physical distribution ost for total import & export container through Pusan port was composed of 4.47% in port entring cost, 12.98% in cargo handling cost, 7.44% in transfer & storage cost and 75.11% in in-land transport cost. Investigation in case of BCTOC verified the results as follows. 1) The optimal level of one time cargo handling was verified 236VAN (377TEU) and annual optimal handling capacity was calculated in 516, 840VAN(826, 944TEU) where berth occupancy is $\rho$=0.6 when regardless of port congestion cost, 2) The optimal level of one time cargo handling was verified 252VAN (403TEU) and annual optimal handling capacity was calculated in 502, 110VAN (803, 376TEU) where berth occupancy is $\rho$=0.58 when considering of port congestion cost.

  • PDF

A Statistical Review on States Relating to Operation of Radiotherapy Equipments in Seoul National University Hospital (서울대학교병원의 방사선치료장비 운용 통계에 관한 고찰)

  • Park, Heung-Deuk;Kim, Wan-Sun;Ahn, Hee-Yong
    • The Journal of Korean Society for Radiation Therapy
    • /
    • v.6 no.1
    • /
    • pp.21-30
    • /
    • 1994
  • To analyze the states of operation of radiotherapy facilities in the period from 1979 to 1992 and to get the base for efficient operation and maintenance of the radiotherapy facilities. Data on the records of annual number of patients operated by each facility; span of suspension of operation, the cost and span of repairing, and parts of oui-of-order in the period from 1979 to 1992 were analyzed. We made a comparative analysis of average annual number of patients, annual span of the suspension of operation, annual cost ratio of repair, span of repairing per break down, and total number of broken parts. We could get following annual number of patients(day), span of the suspension of span ($\%$)(day). annual cost ratio fo repair($\%$), span of repairing per break down(Min-Max, day), and number of broken parts from this analysis. 1. Cobalt unit (Picker C-9) : 10,389(43), 0.4(0.83) 0.07, 1hr-2, 3 2. Linac(Clinac 6/100) : 11,492(50), 4.0(9.57), 0.98, 1hr-30, 12 3. Linac(Clinac 18) : 9.115(44), 12.7(30.5), 3.54, 1hr-108. 41 4. Simulator(Picker Ther-X) : 2,017(9), 0.51(1.3), 0.24, 1hr-2, 7 5. RTP(Capentec Cap-plan) : 528(2), 0.4(0.93), - hrs, - The conclusion obtained from statistical analysis above are as follows. 1. The rate of operation of Cobalt unit($99.6\%$) was higher that of Linear Accelerators ($87.3\%$). The rates operation of Simulator and RTP computer were very close to that of Cobalt unit. 2. In order to raise up the working ratio of accelerator. it is desirable that we keep our engineer to learn a sufficient technical skill and the equipment agent to stock sufficient spare parts. 3. In order to maintain Linear Accelerator efficiently, it is desirable to have annually $2.3\%$ of the purchase price of equiment for repairing.

  • PDF

Design of Multi-Regional Water Supply System Based on the Optimization Technique (최적화 기법을 이용한 광역상수도 관로시스템 설계)

  • Kim, Ju Hwan;Kim, Zong Woo;Park, Jae Hong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.13 no.1
    • /
    • pp.95-112
    • /
    • 1999
  • In this research, it is proposed that optimization method is introduced and applied to the design of pipeline system in multi-regional water supply project, which has been constructed to settle the regional unbalance problems of available water resources. For the purpose, interface programs are developed to integrate linear programming model and KYPIPE model which is used for optimization and hydraulic analysis, respectively. The developed program is applied to the pipeline system design of multi-regional water supply project. The optimal diameters from the application of linear programming technique are compared with those from conventional method that is time-consuming and tedious trail and error process. Since the conventional design largely depends upon the experience of designers and the results of general hydraulic analysis, it can not be reasonable and consistent. The application of linear programming technique can make it possible to design pipeline system optimally by using same design factors of general hydraulic models. The model can select commercial discrete pipe diameter as optimal size by using pipe length as decision variables. The developed model is applied to Pohang multi-regional water supply system design with two different objective functions, which are initial construction cost and annual cost including electric cost. As results, it is calculated that the initial construction cost of 1,449,740 thousand won is saved and annual cost of 128,951 thousand won is saved for a year within study year. Also, the optimal site of pump station is selected on 5th pipe, which is located between the diverging junction to Kangdong(2) province and the diverging junction to Cheonbuk province. It is explained that pump cost is less than pipe cost in this application case study due to little pump station scale. In the case of water supply with large pump capacity, it is reasonal that the increase of pipe size is more efficient instead the increase of pump station capacity to save annual cost.

  • PDF

Cost Analysis for Assessment of Reconstruction Projects (재건축사업의 진단평가를 위한 비용분석)

  • Kwon Dong-Chan;Lee Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.477-480
    • /
    • 2003
  • The objective procedure and criterion needs to efficiently perform the safety assessment and improve reliability for results of the cost analysis. There are many studies about cost analysis of safety assessment, but the these studies have problems such as non-quantification of criterions and methods. The purpose of this study to suggest the procedure and criterion for successful cost analysis and quantify cost factors. First, in the cost analysis of the housing reconstruction that is presented this study, determinate the life-cycle and the discount rate, then estimate reconstruction cost and remodeling cost. Finally, compare the annual equivalent LCC of two costs for decision malting to reconstruction or remodeling.

  • PDF

Analysis of Economic Replacement Cycle of Power Transformer Based on LCC Considering Maintenance Effect

  • Park, Seung-Hwa;Jang, Kyeong-Wook;Kweon, Dong-Jin;Shon, Jin-Geun
    • Journal of Electrical Engineering and Technology
    • /
    • v.13 no.4
    • /
    • pp.1631-1637
    • /
    • 2018
  • Electric utilities has been considered the necessity to introduce asset management of electric power facilities in order to reduce maintenance cost of existing facilities and to maximize profit. This paper aims to provide data that can helpful to make profitable decision in terms of power transformers which have a significant part in the power system. Therefore, this study is modeling input cost for power transformer during its entire life and also the life cycle cost (LCC) technique is applied. In particular, the variation of transformer state related with maintenance and the variation of the EUAC curve based on cost and effect of maintenance is examined. In this study, the trend of the equivalent uniform annual cost (EUAC) according to maintenance cycle and cost of equipment is analyzed. In line with that, sensitivity analysis influenced by the changes of other cost factors was performed.

Economic Analysis of Heat Pump System through Actual Operation (히트 펌프 냉난방 시스템의 실사용을 통한 경제성 분석)

  • Shin, Gyu-Won;Kim, Gil-Tae;Joo, Ho-Young;Lee, Jae-Keun
    • Proceedings of the SAREK Conference
    • /
    • 2006.06a
    • /
    • pp.921-926
    • /
    • 2006
  • The present study has been conducted economic analysis through actual operation of EHP and GHP which are installed at the same building of an university Cost items, such as initial cost, annual energy cost and maintenance cost of each system are considered to analyze LCC and economical efficiency is compared. The initial cost is considered on the basis of actual costs, and annual energy cost is converted into the cost after measuring electricity and gas consumption a day. LCC applied present value method is used to assess economical efficiency of both them. Variables used to LCC analysis are electricity cost escalation rate, natural gas cost escalation rate, interest rate, and service lives and when each of them are 4%, 2%, 8%, and 20 years, results of analysis short that EHP(148,257,306 won) is 8.05%(12,981,990 won) more profitable than GHP(161,239,295 won).

  • PDF

Comparing the Operation Cost of Washington Safety Rest Areas with Other States Using Performance-Based Method

  • Shrestha, Kishor;Berg, Alix;Tafazzoli, Mohammadsoroush;Kisi, Krishna
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.640-648
    • /
    • 2022
  • In the United States, the Safety Rest Areas (SRAs) were introduced as highway roadside infrastructures in the early 1900s. The State Departments of Transportation (DOTs) operate/maintain their SRAs using different methods. The Washington DOT used the in-house workforce method for over 20 years, whereas some states moved to Performance-Based Contracting (PBC) from the in-house workforce to save cost primarily. Several existing studies claimed that using the PBC approach saved costs on several highway assets. Thus, the principal objective of this study is to compute and compare the unit operating/maintenance cost of SRAs using the in-house workforce method (in Washington state) with the PBC approach (in other states). The findings of this study show that the average annual cost using the PBC approach was much more than the average annual cost using the in-house workforce approach. The findings also show that in Washington state, the 'Labor Cost' category was a key expenditure, which is statistically higher than other categories. The 'Labor Cost' was followed by the 'Other Services', and then 'Materials and Supplies' and 'Equipment.' The study's findings indicated that outsourcing does not always save costs for agencies. The study findings may help transportation construction/maintenance professionals select a cost-effective approach for their future planning.

  • PDF

Study on Energy Performance And Economic Evaluation of Windows System with Built-in Type Blinds (블라인드 내장형 창호시스템의 에너지 성능 및 경제성 평가에 관한 연구)

  • Joe, Won-Hwa;Lim, Nam-Gi
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.2
    • /
    • pp.97-104
    • /
    • 2010
  • This study evaluated the energy efficiency of a windows system using built-in blinds, with regard to their insulation performance and their blocking of solar radiation. The study took advantage of the "Physibel Voltra" program as a physical simulation of heat transfer. To simulate the "Physibel Voltra" program, I practiced a mock-up test to determine heating quality and translation condition. I analyzed the propensity to annual energy consumption, the annual quantity of heat transfer, and the annual cooling and heating cost through a computer simulation for one general household in an apartment building. In the test, it was found that compared to a general windows system, a windows system with built-in blinds reduced the annual heat transfer by 10% in cooling states and by 11% in heating states when the blind was up. When the blind was down, the windows system with built-in blinds reduced the annual heat transfer by 25% in cooling states and 30% in heating states. When a windows system with built-in blinds is compared with a general windows system, the quantity of cooling and heating loads is reduced by 283.3kw in cooling states and 76.3kw in heating states. This leads to a reduction in the required cooling and heating energy of 359.6kw per house. It is thus judged that the use of a windows system with built-in blinds is advantageous in terms of reducing greenhouse gas emissions, because the annual TOE (tons of oil equivalent) per house is reduced by 0.078TOE, while $tCO_2$ is reduced by $0.16tCO_2$. In addition, compared with a general windows system, the cost of cooling and heating loads in the system reduces the annual cooling cost by 100,000won, and the annual heating cost by 50,000won. Ultimately, this means that cooling and heating loads are cut by 150,000won per year.

The Economic Comparison of EHP and GHP for Medium Capacity Air-conditioning (중용량 공조에서 EHP와 GHP의 경제성 비교)

  • Kim, Young-Il
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.20 no.3
    • /
    • pp.167-174
    • /
    • 2008
  • Cost related to building equipment accounts for about 85% of the life cycle cost of buildings. Therefore proper selection of air-conditioning system is important for reducing the overall cost of buildings. In this study, medium capacity EHP and GHP for air-conditioning a building with a floor area of 1,200 $m^2$ are compared economically. To consider all the factors of initial and operation costs effectively, an annual equal payment method is proposed. For the initial cost, cost of equipment, construction, installation, electric facility, financial subsidy and tax cut is considered. Cost of basic electricity, energy(electricity and gas), space charge, labor, insurance and repair is considered for the operation cost. Under the assumptions made in this study, overall cost of EHP is less than that of GHP, but this is not absolute and different outcome may result if different assumptions are made. This study is useful for those who are interested in choosing an air-conditioning system that costs less for mid-size buildings with simple calculations.