Comparative Study of Cost Estimate System in Landscape Architectural Construction - Comparison of Unit Price between Actual Construction Cost and Standard Quantity per Unit - (조경공사 적산방식의 비교연구 - 실적공사비와 표준품셈의 단가비교 -)

  • Jung, Un-Soo;Choi, Key-Soo
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.40 no.2
    • /
    • pp.97-111
    • /
    • 2012
  • This study aims to find a proper construction cost calculation method by comparing unit prices of cost estimate in landscape construction among other public ordering construction projects. There were 7 out of 12 items from the actual work cost in the first half of 2011 were compared. The 12 items were classified as landscape Architectural construction and the 7 items were the approximate standard. As applied construction types, the comparable 35 items out of the 80 actual work cost items applied to 5 sites were compared to the unit price of the standard quantity per unit in March 2011, which was the approximate standard. Actual construction rate of the 7 items in the category of landscape sector was 104.86% for each item and 92.09% as a total construction cost. The high actual construction rate was caused by the high rate of seed spray depending on the status of applying rocks. However, there were more fundamental reasons for the cost generated from aslope treatment for grass and seed spray. So, it requires more detailed regulations on the modification factors for each soil type, the standard and needs to improve theillogical standard quantity per unit system. Actual construction rate of the 35 items in the applied sectors of civil engineering and architecture was 78.65% for each item and 71.31% (70.17%) as a total construction cost. This shows that actual unit cost cannot reflect actual cost structurally and standard quantity per unit system lacks practicality in terms of construction due to thelabor force. 85.1~91.2 % actual construction rate announced by the Ministry of Land and Maritime Affairs referred to the newly switched items. So the result was estimated as actual construction rate. This requires supplementation after verification in order to make the actual work cost produce at a proper rate. Also, standard quantity per unit system needs complementation with these actual data and so on.