• Title/Summary/Keyword: ASSM tunnels

Search Result 6, Processing Time 0.017 seconds

A Study on the Performance Evaluation System of Conventional(ASSM) Road Tunnels (재래식(ASSM) 도로터널의 성능평가 체계 연구)

  • Park, Kwang-Rim;Chung, Jee-Seung
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.4
    • /
    • pp.27-36
    • /
    • 2018
  • Although the current evaluation system has been revised four times since it was revised in 1996, it is insufficient to utilize it as a basis for predicting the performance degradation from the long-term viewpoint and prioritization decision for the budget input due to the evaluation system limited to securing the structural safety. Therefore, this study proposes a new evaluation system suitable for the performance evaluation of conventional (ASSM) tunnels among the various types of existing road tunnels using Delphi technique and AHP technique. Since the existing evaluation systems and evaluation items in domestic and overseas are limited in scope of evaluation criteria, the survey was conducted in conjunction with closed questionnaires on existing items and open questionnaires for eliciting new items. The validity of the questionnaire results were verified and the performance evaluation factors suitable for conventional (ASSM) tunnels were derived. After calculating weighted value of the derived evaluation item using AHP technique, a new evaluation system is proposed to meet the characteristics of the ASSM tunnel, so that they can be used as reference materials for revising and supplementing detailed guidelines of performance evaluation in the future.

The Stability Assessment of ASSM Tunnels in Service (공용중인 ASSM 터널의 안정성 평가)

  • Kwon, Young Jeong;Park, Min Chul;Shin, Hyo Hee;Lee, Song
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.15 no.5
    • /
    • pp.150-159
    • /
    • 2011
  • The need of securing the stability and extending service lives by efficient maintenance of deteriorated tunnels for several decades has been increased. The stability and the usability of conventional tunnels can be decreased by change of physical properties of the surrounding ground, geometrical properties of the tunnel, an underground water level, environmental conditions, oxidation of lining and the breakdown of constituent materials. In respect of a long-term view, it is need to check all sorts of degradation, the degree of damage and durability to improve the serviceability and to come up with measures to maintain effectively. This paper is about study to analyze the stability of conventional tunnels(American Steel Support Method. ASSM). Three tunnels are chosen in those built in the 1930s and 1960s and the locations of tunnels are selected variously(ChungCheong, GyungBuk, GangWon, Jeolla, etc.) to secure reliability of this study. The state of repair and reinforcement of linings, cracks, and thickness and strength of lining of conventional tunnels in service are researched, compared and analyzed. The crack gauge, the GPR, the schmitt hammer was used for the crack investigation, cavitation, the strength respectively. By using these, the comparative analysis for conventional tunnels was conducted. As a result, there are more cracks in tunnels built in the 1930s than those of tunnels built in the 1960s, and lining strength of the 1930s is higher than those of the 1960s. The thickness of lining in tunnels built in the 1960s is higher than those in tunnels built in the 1930s. In proportion to thickness, cavitation occurred more frequently in tunnels built in the 1960s compared to those in tunnels built in the 1930s.

Study on Discovery of Vulnerable Factors in Road Tunnels through AHP Analysis (AHP분석을 통한 도로터널의 취약요소 발굴에 관한 연구)

  • Seong-Kyu Yun;Gichun Kang
    • Land and Housing Review
    • /
    • v.15 no.3
    • /
    • pp.177-188
    • /
    • 2024
  • This study aims to identify vulnerability factors through comprehensive safety diagnosis and to seek improvement measures for the safety and maintenance of facilities. In this study, the results of road tunnel inspections and diagnostics were converted into a database (DB). Using this data, we explored to identify vulnerable elements (NATM, ASSM) based on structural types and to develop efficient improvement measures. In this study, we analyzed 76 detailed safety diagnosis reports covering 45 different types of road tunnel facilities. In the detailed guidelines for comprehensive safety diagnosis, the database (DB) items for identifying vulnerable factors were selected by categorizing the basic information, such as the year of completion and damage items. In addition, AHP analysis was conducted separately through experts in related fields to analyze the correlation between damages. As a result, the primary vulnerability factors for NATM and ASSM were identified as cracks, leaks, insufficient lining thickness, and joint rear. ASSM was identified as relatively more susceptible to network cracks and material separation compared to NATM. In contrast, flaking and rebar exposure were interpreted as more significant vulnerabilities for NATM than for ASSM. In addition, the correlation between elements in NATM was found to be low, whereas in ASSM, the correlation between elements was high, indicating a more organic relationship.

A Study on the Development of the Seismic Fragility Functions of the High Speed Railway Tunnels in use (기존 고속철도 터널의 지진취약도 함수 개발에 관한 연구)

  • Kim, Hongkyoon;Shin, Chulsik;Lee, Taehyung;Lee, Jonggun;Park, Duhee
    • Journal of the Korean GEO-environmental Society
    • /
    • v.15 no.11
    • /
    • pp.67-75
    • /
    • 2014
  • In this study, the staged seismic performance evaluations were conducted to the 91 high speed railway tunnels in use for checking whether to comply with the recent design criteria or not. In addition, the seismic fragility functions of the tunnels were developed to allow the probabilistic risk assessment. The results of the staged seismic performance evaluations which consist of a preliminary assessment and a detailed assessment, show that the tunnels comply with the recent design criteria. With reference to the results of previous studies, a form of the proposed seismic fragility functions was set as a log-normal distribution by PGA, and the parameters of the functions were determined by using the probability of damage for the design PGA level. The seismic fragility functions were developed for each types (Cut & Cover, NATM) of tunnels. The seismic fragility functions from this study and the existing research results (FEMA, 2004) were compared to evaluate the seismic performance level of the tunnels, as a result the tunnels of this study were relatively superior to the ASSM tunnels on the seismic performance.

A study on efficient management of the drainages of underground tunnels for environmentally friendly urban railway systems (도시철도 친환경 지하터널 배수형식의 효율적인 유지관리 방안 검토)

  • Baek, Jong-Myeong;Hong, Jong-Hun;Kim, Han-Bae
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1982-1990
    • /
    • 2010
  • Excepting tunnel of dorimstream - ccachimountain station section, the subway line No.2th section was build using ASSM and NATM methods because of soil pressure and land condition. The way of dealing underground water was selected without sufficient preconsideration of geographical features, ground condition, influence of lowing underground water, and long-term cost of running maintenance so that the form of undrained tunnel was build having decreased construction characteristics and technically improper elements. The form of partial drainage is very difficult to manage structures of tunnel, because water leakage, water pressure causing cracks of lining concretes and scaling are constantly happened. so partial drainage suggest that setting reinforced Anchor Bolt to prevent buoyancy and should increase center drainage way up to height of railroad. Partial drainage suggest that holey pipe(${\phi}$350mm) manhole, drainage checking pipe manhole are should be regularly dredged, when changing roadbed(gravel${\rightarrow}$concrete) drainage checking pipe manhole should be build and setting a limitation of entering underground water's quantities. Beside drainage degree in changed section of structures causing instability of structures is continuous degree. so if efficient drainage way and the patterns of flaws, problems are considered in survey, it will be expected to have a advantage condition in maintenance part.

  • PDF

Reinforcement of Shotcrete Lining on the Side Wall of Tunnel in Enlargement of Existing ASSM Road Tunnel (측벽부 숏크리트 보강에 의한 재래식 도로터널 단면확대)

  • Kim, Donggyou;Shin, Youngwan
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.12
    • /
    • pp.81-89
    • /
    • 2012
  • The existing tunnel in urban area can be enlarged because of requirement of road-widening by traffic growth. The protector with rectangular cross section can be set up in the tunnel, which will be constructed for enlargement of width, to solve traffic jam around the tunnel. It is impossible to install the rockbolt in the lower area of tunnel due to a limited space between the protector and cutting surface. The objective of this study is to suggest the method of shotcrete thickness increase instead of rockbolt installation in the side wall of tunnel for the stability of tunnel. Numerical analysis was performed to evaluate displacement at the crown of tunnel, convergence of tunnel, and stress in shotcrete lining in 3-lane and 4-lane NATM tunnels enlarged from 2-lane conventional tunnel. There were three types of analysis condition, rockbolt installation, no rockbolt installation, and increase of shotcrete thickness without rockbolt in the side wall of tunnel. There was no difference on the displacement at the crown and the convergence of upper tunnel. In the lower tunnel, the convergence in case of no rockbolt installation was larger as maximum 1.3mm than that in case of rockbolt installation. The stress in shotcrete lining in case of no rockbolt installation was larger as maximum 1.3MPa than that in case of rockbolt installation. Numerical analysis was performed to compare the behavior of shotcrete with rockbolt with that of shotcrete, which its thickness was increased, without rockbolt. The shotcrete has an increase of 20%(250mm ${\rightarrow}$ 300mm, 4-lane tunnel)~25%(200mm ${\rightarrow}$ 250mm, 3-lane tunnel) in its thickness to reduce the stress in shotcrete lining. The behavior of shotcrete lining increased the shotcrete thickness by 20%~25% was similar to that of existing shotcrete lining with rockbolt.