• Title/Summary/Keyword: APR1000

Search Result 23, Processing Time 0.025 seconds

Current Status of NRC Pre-Application Reivew on 4S (특집_제25회 한국원자력연차대회 - APR1000 설계 요건과 안전 설계 특징)

  • Kim, Myeong-Gi;Yu, Geun-Bae
    • Nuclear industry
    • /
    • v.30 no.3
    • /
    • pp.72-78
    • /
    • 2010
  • KEPCO는 APR1000 원전을 개발 중에 있다. APR1000은 2루프 1000MWe급의 가압경수로로, 국내에 운영중이고 건설중인 검증된 OPR1000 설계를 기반으로 하고 있다. APR1000은 원전 수요자의 요구에 응하기 위해 안전성, 신뢰성 및 경제성을 설계에 고려하여 개발 중에 있다. APR1000의 대표적인 설계 특성으로는 60년 수명, 0.3g 내진 설계, MMICs, 저온 덮개 원자로(Cold Head Reactor), 안전 주입 탱크 내의 피동형 유량 조절 장치 등이 있다. 본고에서는 APR1000의 설계 요건과 안전 관련 설게 특징을 소개하고자 한다.

  • PDF

Environmental Fatigue Evaluation of APR1000 Reactor Vessel (APR1000 원자로용기의 환경피로 평가)

  • Kim, Jong Min;Kim, Yong Hwan
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.26 no.3
    • /
    • pp.207-212
    • /
    • 2013
  • APR1000(Advanced Power Reactor 1000) was developed to export 1000MW nuclear power plants by adding ADFs(Advanced Design Features) including 60 years design life, local frequency control operation, 0.3g SSE, etc. to OPR1000(Optimized Power Reactor 1000). In this paper, environmental fatigue analyses for the reactor vessel in APR1000 have been performed as per Reg. Guide 1.207. Outlet nozzle, which has a relatively high cumulative usage factor in the reactor vessel was evaluated and a structural integrity is maintained under the reactor coolant environment.

THE DESIGN FEATURES OF THE ADVANCED POWER REACTOR 1400

  • Lee, Sang-Seob;Kim, Sung-Hwan;Suh, Kune-Yull
    • Nuclear Engineering and Technology
    • /
    • v.41 no.8
    • /
    • pp.995-1004
    • /
    • 2009
  • The Advanced Power Reactor 1400 (APR1400) is an evolutionary advanced light water reactor (ALWR) based on the Optimized Power Reactor 1000 (OPR1000), which is in operation in Korea. The APR1400 incorporates a variety of engineering improvements and operational experience to enhance safety, economics, and reliability. The advanced design features and improvements of the APR1400 design include a pilot operated safety relief valve (POSRV), a four-train safety injection system with direct vessel injection (DVI), a fluidic device (FD) in the safety injection tank, an in-containment refueling water storage tank (IRWST), an external reactor vessel cooling system, and an integrated head assembly (IHA). Development of the APR1400 started in 1992 and continued for ten years. The APR1400 design received design certification from the Korean nuclear regulatory body in May of2002. Currently, two construction projects for the APR1400 are in progress in Korea.

A Study on Applicability of Stainless Steel Type 316N to the PZR Surge-line of OPR1000 and APR1400 (Type 316N 스테인리스강의 OPR1000 및 APR1400 가압기 밀림관 적용성에 대한 연구)

  • Yoo, One;Jung, Sung-Hoon;Park, Sung-Ho;Sohn, Gap-Heon;Lee, Bong-Sang;Kim, Min-Chul
    • Proceedings of the KSME Conference
    • /
    • 2008.11a
    • /
    • pp.287-292
    • /
    • 2008
  • The applicability of stainless steel type 316N to the PZR surge-lines of OPR1000 and APR1400 is investigated. So far, strainless steel type 347 has been used for the OPR1000 surge-lines. The degree of improvement in the leak-before-break(LBB) and component design margin is evaluated when stainless steel type 347 is substituted by type 316N. For the study, the tensile and J-R tests on type 316N and type 347 stainless steels were performed at 316 and the microstructure of both types was examined. Stainless steel type 316N shows the higher values on the stress-strain curves, J-R curves and stress intensity, Sm, compared to those of type 347. Therefore, stainless steel type 316N ensures the higher LBB and component design margins. As a result, this study shows that stainless steel type 316N could substitute type 347 for the surge-lines of OPR1000 and APR1400.

  • PDF

Validation of Vibration and Stress Analysis Methodology for APR1400 Reactor Vessel Internals Comprehensive Vibration Assessment Program (APR1400 원자로내부구조물 종합진동평가프로그램 진동 및 응력해석 방법론 검증)

  • Kim, Kyu Hyung;Ko, Do Young;Kim, Sung Hwan
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2012.10a
    • /
    • pp.300-305
    • /
    • 2012
  • The vibration and stress analysis program of comprehensive vibration assessment program (CVAP) is to verify theoretically the structural integrity of reactor vessel internals (RVI) and to provide the basis for selecting the locations monitored in measurement and inspection programs. This paper covers the verification of the vibration and stress analysis methodology of APR1400 RVI CVAP. The analysis methodology was developed to use 3-dimensional hydraulic and structural models with ANSYS and CFX. To validate the methodology, the hydraulic loads and structural reponses of OPR1000 were predicted and compared with the calculated and measured data in the OPR1000 RVI CVAP. Since the results predicted with this methodology were close to the measured values considerably, it was confirmed that the analysis methodology was developed properly.

  • PDF

A Study on the Probabilistic Safety Assessment and Sensitivity Analysis of Success Criteria of Large LOCA for APR+ (APR+ 확률론적 안전성평가 및 대형냉각재상실사고 성공기준과 파단크기 민감도 분석)

  • Moon, Horim;Kim, Han Gon
    • Journal of the Korean Society of Safety
    • /
    • v.31 no.6
    • /
    • pp.129-134
    • /
    • 2016
  • Standard design of APR+(advanced power reactor plus) was certified at 2014 by Korea regulatory body. Based on the experience gained from OPR1000 and APR1400, the APR1400 was being developed as a 1,500MWe class reactor using Korean technologies for design code, reactor coolant pump, and man-machine interface system. APR+ has been basically designed to have the seismic design basis of safe shutdown earthquake (SSE) 0.3g, a 4-train safety concept based on N+2 design philosophy, and a passive auxiliary feedwater system (PAFS). Also, safety issues on the Fukushima-type accidents have been extensively reviewed and applied to enhance APR+ safety. APR+ provides higher reliability and safety against tsunami and earthquake. The purpose of this paper is to implement probabilistic safety assessment considering these design features and to analyze sensitivity of core damage frequency for large loss of coolant accident of APR+.

A Economic Evaluation for APR+ Standard Design (APR+ 표준설계에 대한 경제성 분석)

  • Ha, Gag-Hyeon;Lee, Jae-Ho
    • Journal of Energy Engineering
    • /
    • v.25 no.1
    • /
    • pp.43-47
    • /
    • 2016
  • KHNP CRI has developed APR+ nuclear power plant since 2007, which is GEN III+ model with 1500 MWe capacity. To develop safer nuclear power plant than APR1400, we investigated advanced design features of ALWR being constructed in Korea and being developed/constructed in foreign countries. We applied the advanced design features and lessons learned from Fukushima accident to develop APR+ standard design suitable for both domestic construction and overseas construction business. One economic assessments have performed during safety design improvement phase(2013.1 ~ 2015.12) of APR+. The result of the economic analysis for APR+ safety inhancement design showed that APR+ N-th plant is about 39.2% more economical than coal-fired 1,000MW power plant. Also APR+ plant is more cost advantage over foreign advanced nation ALWRs.

A Generating Cost Evaluation of APR+ Standard Design (APR+ 표준설계 발전원가 분석)

  • Ha, Gag-Hyeon;Kim, Sung-Hwan;Lee, Jae-Ho
    • Journal of Energy Engineering
    • /
    • v.23 no.4
    • /
    • pp.236-239
    • /
    • 2014
  • KHNP CRI has been developing APR+ nuclear power plant since 2007, which is GEN III+ model with 1500 MWe capacity. To develop safer and more economical nuclear power plant than APR1400, we investigated advanced design features of ALWR(advanced light water reactor) being constructed in Korea and being developed/constructed in foreign countries. We applied the advanced design features and lessons learned from Fukushima accident to develop APR+ standard design suitable for both domestic construction and overseas construction business. Three economic assessments have performed during standard design phase of APR+. The result of the 3th(final) economic analysis for APR+ standard design showed that APR+ N-th plant was about 23% more economical than coal-fired 1,000MW power plant.

Validation of Vibration and Stress Analysis Method for APR1400 Reactor Vessel Internals Comprehensive Vibration Assessment Program (APR1400 원자로내부구조물 종합진동평가프로그램 진동 및 응력해석 방법 검증)

  • Kim, Kyu Hyung;Ko, Do Young;Kim, Sung Hwan
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.23 no.4
    • /
    • pp.308-314
    • /
    • 2013
  • The vibration and stress analysis program of comprehensive vibration assessment program(CVAP) is to theoretically verify the structural integrity of reactor vessel internals(RVI) and to provide the basis for selecting the locations monitored in measurement and inspection programs. This paper covers the applicability of the vibration and stress analysis method of APR1400 RVI CVAP. The analysis method was developed to use 3-dimensional detail hydraulic and structural models with ANSYS and CFX. To assess the method, the hydraulic loads and structural reponses of OPR1000 were predicted and compared with the measured data in the OPR1000 RVI CVAP. The results predicted with this method were close to the measured values considerably. Therefore, the analysis method was developed properly.

An Economic Assessment for APR+ Standard Detailed Design Developing Phase (APR+ 표준상세설계 개발단계에서의 경제성 평가)

  • Ha, Gak-Hyeon;Suh, Yong-Pyo;Kim, Man-Won;Kim, Sung-Choon;Park, Sun-Eung
    • Journal of Energy Engineering
    • /
    • v.21 no.3
    • /
    • pp.292-300
    • /
    • 2012
  • KHNP CRI has been developing APR+ nuclear power plant since 2007, which is GEN III+ model with 4,361 MWth capacity. To develop safer and more economical nuclear power plant than APR1400, we studied domestic and foreign nuclear power plants under construction. We also reviewed nuclear power plants which are appropriate for domestic construction in Korea and also for export. Economic assessments were made twice during the second phase of standard detailed design of the plant. The result of the second phase of economic analysis for APR+ standard detailed design showed that APR+ N-th plant was 24.6% more economical than coal-fired 1,000MW power plant, and was evaluated to be competitive enough in global market for construction of the nuclear power plant.