• Title/Summary/Keyword: AHP model

Search Result 840, Processing Time 0.023 seconds

Site Selection Method by AHP-based Artificial Neural Network Model for Groundwater Artificial Recharge (AHP 기반의 인공신경망 모델을 활용한 지하수 인공함양 후보지 선정 방안)

  • Kim, Gyoo-Bum;Choi, Myoung-Rak;Seo, Min-Ho
    • The Journal of Engineering Geology
    • /
    • v.28 no.4
    • /
    • pp.741-753
    • /
    • 2018
  • Local drought in South Korea has recently increased interest in the efficient use of groundwater and then induces a growing need to introduce artificial recharge of groundwater that stores water in sedimentary layer. In order to evaluate the potential artificial recharge sites in the alluvial basins in Chungcheongnamdo province, an AHP (Analytical hierarchy process) model consisting of three primary and seven secondary factors was developed in this study. In the AHP model, adding candidate sites changes final evaluation score through a mathematical calculation process. By contrast ANN (Artificial neural network) model always provides an unchanged score for each candidate area. Therefore, the score can be used as a selection criterion for artificial recharge sites. It is concluded that the possibility of artificial recharge is relatively low if the score of the ANN model is less than about 1.5. Further studies and field surveys on the other regions in Korea will lead to draw out a more applicable ANN model.

Decision making model for introducing Medical information system based on Block chain Technologies (블록체인 기반 의료정보시스템 도입을 위한 의사결정모델)

  • Zheng, Yajun;Kim, Keun Hyung
    • The Journal of Information Systems
    • /
    • v.29 no.1
    • /
    • pp.93-111
    • /
    • 2020
  • Purpose The purpose of this paper is to observe the relative priorities of importances among the modified versions of Block chain system, being based on AHP decision support model which should be also proposed in this paper. Design/methodology/approach Four versions modified from the beginning of Block chain were divided into Public& Permissionless, Private&Permissionless, Public&Permissioned and Private&Permissioned types. Five criteria for evaluating the four versions whether the version were suitable for Medical information system were introduced from five factors of Technologies Accept Model, which were Security, Availability, Variety, Reliability and Economical efficiency. We designed Decision support model based on AHP which would select the best alternative version suitable for introducing the Block chain technology into the medical information systems. We established the objective of the AHP model into finding the best choice among the four modified versions. First low layer of the model contains the five factors which consisted of Security, Availability, Variety, Reliability and Economical efficiency. Second low layer of the model contains the four modified versions which consisted Public&Permissionless, Private&Permissionless, Public&Permissioned and Private& Permissioned types. The structural questionnaire based on the AHP decision support model was designed and used to survey experts of medical areas. The collected data by the question investigation was analyzed by AHP analysis technique. Findings The importance priority of Security was highest among five factors of Technologies Accept Mode in the first layer. The importance priority of Private&Permissioned type was highest among four modified versions of Block chain technologies in second low layer. The second importance priority was Private&Permissionless type. The strong point of Private&Permissioned type is to be able to protect personal information and have faster processing speeds. The advantage of Private& Permissionless type is to be also able to protect personal information as well as from forging and altering transaction data. We recognized that it should be necessary to develop new Block chain technologies that would enable to have faster processing speeds as well as from forging and altering transaction data.

Development of an Analytic Hierarchy Process Model for the Bidder Selection of a Large Construction Project (대형공사의 최적입찰자 선정을 위한 계층분석과정(AHP) 모형의 개발)

  • 정병호;조권익
    • Korean Management Science Review
    • /
    • v.16 no.1
    • /
    • pp.75-85
    • /
    • 1999
  • In recent, an unfaithful construction bring about many social problems. The bidding process considering bidding price firstly is one of the reasons raising an unfaithfull construction work. Thus, we should consider many other criteria including bidding price in the bidder selection process. This paper suggests an analytic hierarchy process(AHP) model for selecting the best bidder of a large construction project. A questionnaire was used to obtain domain experts' opinion about criteria to be considered in the bidding process. A hierarchical structure of the AHP model is formed using criteria obtained in the survey. The model consists of bidding price, construction capability, financial status, faith, and their 17 sub-attributes. The relative importance of bidders are judged by pairwise comparison or absolute measurement. An illustrative example is given to show the process selecting the best bidder using the suggested AHP model.

  • PDF

A Study on Evaluation Model of Business Process Management Systems based on Analytical Hierarchy Process (AHP 기반의 비즈니스 프로세스 관리시스템 평가 모형에 관한 연구)

  • Yu, Sung-Yeol
    • Management & Information Systems Review
    • /
    • v.31 no.4
    • /
    • pp.433-444
    • /
    • 2012
  • The purpose of this study is to develop the evaluation model of BPMS(business process management systems) based on AHP(analytical hierarchy process). In this study, we draw some criteria to select BPMS solution from a experts panel. And, we develop an evaluation model based on AHP method. As a result, each organization can select the effective BPMS solution from the proposed evaluation model.

  • PDF

A Study on the Risk Index Model of Work Type in Architectural Construction Work (건축공사 공종별 위험지수 산정모델에 관한 연구)

  • Chang, Seong-Rok;Go, Seong-Seok;Lee, Jong-Bin
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.6
    • /
    • pp.63-68
    • /
    • 2007
  • The purpose of this study is to verify the relation between the risk index using AHP(Analytic Hierarchy Process) and the risk index using Computing Model. For doing the objective, this research classified 22 work types in architectural construction work from the analysis Korean architectural standard specification and Korea occupational safety & health agency code. Based on the classified 22 work types in architectural construction work, the risk index of each work type was calculated by AHP and Computing Model. For verifying the correlation of risk index between AHP and Computing Model methods, SAS version 8.0 System, which is one of the statistics programs, was used.

Examining Success Factors of Online P2P Lending Service Using Kano Model and Fuzzy-AHP (Kano 모형과 Fuzzy-AHP를 이용한 온라인 P2P 금융 서비스 성공요인 도출)

  • An, Kyung Min;Lee, Young-Chan
    • Knowledge Management Research
    • /
    • v.19 no.2
    • /
    • pp.109-132
    • /
    • 2018
  • Recently, new financial services related to FinTech has gained attention more and more. Online P2P financial services transactions such as FinTech require careful examination of the constituents of information systems as an investment is made based on the information presented on the online platform without direct face-to-face contact. The purpose of this study is to find out the success factors of online P2P Lending service among FinTech. To serve the purpose, we build IS (information system) success model, and then use Kano model and fuzzy analytic hierarchy process (Fuzzy-AHP) to find out factors for the success of online P2P Lending service. In particular, this study uses Kano model to classify information system satisfaction factors and to calculate the satisfaction coefficient. The Kano model, however, has a drawback of evaluating single criterion. Therefore, we use multi-criteria decision-making technique such as Fuzzy-AHP to derive the relative importance of the factors. The analysis results show different results depending on the analysis technique. In the Kano model, most of the information system factors are a one-dimensional quality attribute. The satisfaction coefficient is highest for personalized service, followed by the responsiveness of service, ease of using a system, understanding of information, usefulness of information' reliability. The service reliability is the highest in dissatisfaction coefficient, followed by system security, service responsiveness, system stability, and personalized service. The results of the Fuzzy-AHP analysis shows that the usefulness of information quality, the personalization of service quality, and the security of system quality are the significant factors and the stability of system quality was a secondary factor.

An efficient Decision-Making using the extended Fuzzy AHP Method(EFAM) (확장된 Fuzzy AHP를 이용한 효율적인 의사결정)

  • Ryu, Kyung-Hyun;Pi, Su-Young
    • Journal of the Korean Institute of Intelligent Systems
    • /
    • v.19 no.6
    • /
    • pp.828-833
    • /
    • 2009
  • WWW which is an applicable massive set of document on the Web is a thesaurus of various information for users. However, Search engines spend a lot of time to retrieve necessary information and to filter out unnecessary information for user. In this paper, we propose the EFAM(the Extended Fuzzy AHP Method) model to manage the Web resource efficiently, and to make a decision in the problem of specific domain definitely. The EFAM model is concerned with the emotion analysis based on the domain corpus information, and it composed with systematic common concept grids by the knowledge of multiple experts. Therefore, The proposed the EFAM model can extract the documents by considering on the emotion criteria in the semantic context that is extracted concept from the corpus of specific domain and confirms that our model provides more efficient decision-making through an experiment than the conventional methods such as AHP and Fuzzy AHP which describe as a hierarchical structure elements about decision-making based on the alternatives, evaluation criteria, subjective attribute weight and fuzzy relation between concept and object.

Subcontractor Evaluation Model for construction Industry Using AHP (AHP 기법을 응용한 건설업 협력업체 평가모형 개발에 관한 연구)

  • 김성수;이영훈
    • Korean Management Science Review
    • /
    • v.17 no.2
    • /
    • pp.135-150
    • /
    • 2000
  • Korean construction companies are recently facing stiff competition in free market economy, and construction projects tend to be complex and large-scale. Such an environment demands that construction companies ensure specialized subcontractors. This paper suggested a subcontractor evaluation model for selection of competent subcontractors which are equipped with operational, technical and productive ability. For designing a subcontractor model, AHP method as a group decision-marking method is applied in assigning weighting indices of evaluation elements. To verify this method, actual data collected in one of construction companies are analysed statistically.

  • PDF

Using Dirichlet Probability Model to Combine AHP Priorities (Dirichlet 확률모형을 이용한 AHP 중요도 결합방법)

  • Kim, Sung-Chul
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.26 no.3
    • /
    • pp.213-219
    • /
    • 2000
  • Combination of AHP priorities is essential in combining opinions of multiple experts. There are two ways to get combined priorities: one is to combine the pairwise matrices and obtain the priority from it and another is to combine the individual priorities. In this paper, we use a Dirichlet probability model to combine the priorities from multiple experts. The resulting combined priority is an expected value of the model, which is a function of some measure of the homogeneity and credibility of the group of experts. We give some interpretations of this measure and illustrate them by numerical example.

  • PDF

Efficiency Analysis of Construction Firms Using a Combined AHP and DEA Model (AHP와 DEA 결합모델을 이용한 상장 건설기업의 효율성 분석)

  • Seo, Kwang-Kyu;Choi, Da-Young
    • The Journal of the Korea Contents Association
    • /
    • v.11 no.6
    • /
    • pp.302-310
    • /
    • 2011
  • Recently, many construction firms fall on hard times because construction business continues to stagnate. In this paper, we analyze the efficiency of the listed construction firms using a combined AHP and DEA model. In order to determine the input and output factors of DEA, the AHP model is applied to evaluate the importance of input and output factors. The benchmarking companies and efficiency value for the construction firms with inefficiency are also provided to improve the their efficiency. We analyzed the 57 listed companies consisted of 36 listed on KOSPI and 21 listed on KOSDAQ at the end of 2009. The analysis results show that eleven companies whose values of CCR are 1, and fourteen enterprises whose values of BCC efficiency are 1. In additions, the eleven firms have the scalability efficiency. Finally, we test the correlation between efficiency and the stock price and the correlation coefficient of efficiency group is 0.7 in the CCR model.