• Title/Summary/Keyword: AEC system

Search Result 65, Processing Time 0.024 seconds

A Design of Fuzzy Power System Stabilizer using Adaptive Evolutionary Computation (적응진화연산을 이용한 퍼지-전력계통안정화장치 설계)

  • Hwang, Gi-Hyun;Park, June-Ho
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.48 no.6
    • /
    • pp.704-711
    • /
    • 1999
  • This paper presents a design of fuzzy power system stabilizer (FPSS) using adaptive evolutionary computation (AEC). We have proposed an adaptive evolutionary algorithm which uses a genetic algorithm (GA) and an evolution strategy (ES) in an adaptive manner in order to take merits of two different evolutionary computations. FPSS shows better control performances than conventional power system stabilizer (CPSS) in three-phase fault with heavy load which is used when tuning FPSS. To show the robustness of the proposed FPSS, it is appliedto damp the low frequency oscillations caused by disturbances such as three-phase fault with normal and light load, the angle deviation of generator with normal and light load and the angle deviation of generator with heavy load. Proposed FPSS shows better robustness than CPSS.

  • PDF

BIM Clash Quality Control by Expert System (전문가시스템을 활용한 BIM 물리적 품질 검토방법에 관한 기초연구)

  • Kwon, Ocheol;Cho, Joowon
    • Korean Journal of Computational Design and Engineering
    • /
    • v.20 no.1
    • /
    • pp.22-35
    • /
    • 2015
  • As BIM in the construction industry has been activated, the building information reliability - design quality is getting important. Meanwhile, it is still difficult to reflect the quality control experience to the modelling since the current methods are strongly rely on a certain BIM tools or systems with formal logics and limited information for quality checking. Therefore, the checking results may contain a lot of issues unrelated or unnecessary to the BIM qualities. In order to overcome this problem, we firstly performed clash check using a conventional checking tool and secondly interpret the results by an Expert System to filter out more meaningful results. We found this study gave a confirmation that it is possible to improve clash quality control when we link the expert experience to the rule-based automatic checking system.

A Building Information Modeling based Collaboration Supporting System for Construction Project (BIM 기반 건설 프로젝트의 협업 지원 시스템)

  • Yoon, Su-Won;Chin, Sang-Yoon;Choi, Cheol-Ho;Lee, Ghang;Shin, Tae-Hong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.476-481
    • /
    • 2008
  • The objective of this paper is to propose a conceptual framework of a BIM based collaboration supporting System, called Construction Project Life Cycle Management (CPLM). The framework of CPLM is proposed by reflecting the characteristics of the AEC industry such as deliverly methods, process, fragmentation, etc.. And it is a system intended to help project participants make better decisions and to facilitate coordination between various stakeholders in a project by providing virtual collaboration environment.

  • PDF

Optimization of BIM based Space Plan by Expert System (전문가시스템을 활용한 BIM기반 건축공간 면적계획 최적화 방안)

  • Kwon, Ocheol;Cho, Joowon
    • Korean Journal of Computational Design and Engineering
    • /
    • v.21 no.2
    • /
    • pp.99-110
    • /
    • 2016
  • The quality of building space program is a key to measure how the building performance satisfies its owner and users. However assuring its efficiency requires reliable criteria that reflect high level experience knowledge in the field. This study suggests a plan to gauge the level of building space performance using expert knowledge, which has not been utilized well enough but should play a critical role. In order to setup an expert system measuring level of the space program, we firstly optimized the space areas to the best case in a knowledgebase and use them as criteria to judge the quality of the spaces extracted from BIM model. We found the experimental results show us a promising way of measuring a relative quality of the space programs.

Study of Process Model Using CAD System and Distributed Building Component Database (CAD 시스템과 분산형 건축부품 데이터베이스를 이용한 프로세스 모델에 관한 연구)

  • 박현수
    • Korean Journal of Computational Design and Engineering
    • /
    • v.7 no.1
    • /
    • pp.66-73
    • /
    • 2002
  • The purpose of this study is to propose a new process model for architects and suppliers in AEC(Architectural, Engineering and Construction) industry, which comes from its utilization of a distributed database. Information used by participants of this process is not held in one singular application sewer, but in tile databases of multiple participants. This study addresses the problem of coping with dynamic information changes that architects face when designing with increasingly time-sensitive product information from multiple suppliers. It also describes the new distributed architecture for design representation, and outlines a corresponding process model to address the needs architectural designers during design and procurement phases. The feasibility of the process was tested in a prototype system that combines existing technologies, which allows for an objects transfer from the Web to the CAD application.

A comparative study of full-band and sub-band approaches to acoustic echo cancellation (음향 피드백 제거를 위한 전대역, 협대역 적응 필터의 비교)

  • 신민철;김상명
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2003.05a
    • /
    • pp.645-651
    • /
    • 2003
  • The system in which a microphone and a loudspeaker are simultaneously used can cause an echo. The echo is caused by feedback between the output of the loudspeaker and the input of the microphone. The acoustic echo canceller is a device to cancel the echo in a communication system. Its general procedure for cancellation is first estimating the plant response of the feedback path and then eliminating the feedback signal from the input signal. In this paper, full-band and sub-band approaches are compared by using some simulation examples.

  • PDF

Real-time In-situ Plasma Etch Process Monitoring for Sensor Based-Advanced Process Control

  • Ahn, Jong-Hwan;Gu, Ja-Myong;Han, Seung-Soo;Hong, Sang-Jeen
    • JSTS:Journal of Semiconductor Technology and Science
    • /
    • v.11 no.1
    • /
    • pp.1-5
    • /
    • 2011
  • To enter next process control, numerous approaches, including run-to-run (R2R) process control and fault detection and classification (FDC) have been suggested in semiconductor manufacturing industry as a facilitation of advanced process control. This paper introduces a novel type of optical plasma process monitoring system, called plasma eyes chromatic system (PECSTM) and presents its potential for the purpose of fault detection. Qualitatively comparison of optically acquired signal levels vs. process parameter modifications are successfully demonstrated, and we expect that PECSTM signal can be a useful indication of onset of process change in real-time for advanced process control (APC).

A Literature Review of Unmanned Aircraft System (UAS) Integrated Constructed Facility Condition Inspections (무인항공체계 기반 시설물 상태점검 최근 연구동향 분석)

  • Kwon, Jin-Hyeok;Yun, Jiyeong;Youn, JongYoung;Lee, Donghoon;Kim, Sungjin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.172-173
    • /
    • 2021
  • In recent, unmanned Aircraft Systems (UAS) have been widely used for various purposes, such as safety inspection, facility condition inspection, progress monitoring, in the architecture engineering, and construction (AEC) industry. This technology can provide visual assets regarding the conditions of construction jobsites as well as constructed facilities during flying over the point of interests. With the significant interests in this advancement, the recent studies have presented how the UAS can be applied fro different types of facilities (e.g., buildings, power genereation systems, roads, or bridges) to inspect the current conditions of them for safe operations as well as public's safety. This study reviewed the receent studies to document their scientific findings and practical contributions, as well as provided the overview of further implications for future studies.

  • PDF

A Study on Development of Framework Based BIM Guideline System (BIM지침의 통합관리를 위한 구조화에 관한 연구)

  • Han, Jisu;Lee, Seip;Jo, Chanwon;Kim, Gutaek;Cho, Joowon
    • Korean Journal of Computational Design and Engineering
    • /
    • v.20 no.2
    • /
    • pp.210-219
    • /
    • 2015
  • As various contractors have been asking BIM data in the construction industry, BIM guidelines and standards has become increasingly important these days. Above all, BIM guidelines should be established properly because it is utilized at the earliest stage of BIM data creation. However, each of the existing BIM guidelines was totally different by contractors, disciplines or phases so that it caused problems about repetitious work, inefficient management and so on. In order to overcome these problems, we suggest integrated management system for BIM guidelines. We firstly collected and analyzed existing guidelines, secondly standardized guideline phrases and lastly constructed data structure of integrated management system. This integrated management system is expected to increase work efficiency to avoid working error for designers and enable easy creation or revision of BIM guidelines for contractors.

Introducing and Surveying 4D Models in AEC Industry (4D 공정관리시스템의 개발현황 조사연구)

  • Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.137-142
    • /
    • 2001
  • The traditional schedule management system provides project manager with analysis reports, such as progress control, earned value management and resource management, including schedule chart. However, the reports and functions in the traditional system are still limited in 2D concept. Recently, the scheduling method is using 4D concept that time of construction schedule is linked to space of drawings. This study presents the limitation of those systems and an improved method for developing 4D system through the comparative analysis of representative 4D systems that are developed up to date.

  • PDF