• 제목/요약/키워드: AC railway

검색결과 201건 처리시간 0.025초

STATCOM을 이용한 고속전철 부하가 연계된 계통의 안정도 향상에 관한 연구 (A Study on System Stability Improvement of Power System with High Speed Electric Railway Using STATCOM)

  • 이준경;오재경;김진오
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제52권11호
    • /
    • pp.625-631
    • /
    • 2003
  • The purpose of this paper is to assess experimentally system stability of the 154 ㎸ transmission system due to the current of the forthcoming AC High-Speed Railway (HSR) era. It introduces a simple method to evaluate the system stability The proposed method also shows the relationship between stability and power losses, and the stability indices made by the numerical process proposed in this paper will be used to assess whether a system can be stabilized or not. This paper also presents the improvement of the stability via loss reduction using STATCOM. Reactive power compensation is often the most effective way to improve both power transfer capability and system stability. The suitable modeling of the electric railway system should be applicable to the PSS/E. In the case study the proposed method is tested on a practical system of the Korea Electric Power Corporation (KEPCO) which will be expected to accommodate the heavy HSR load. Furthermore, it prove that the compensation of voltage drop and its by-product, loss reduction is closely related to improvement of system stability.

교류전기철도에서의 에너지저장시스템 적용효과 예측 (Estimation about Application Effects of Energy Storage System at AC Electric Railway)

  • 이장무;이한민;김길동
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.1849-1854
    • /
    • 2010
  • Energy Storage System(ESS) is installed at feeding line of railway substation. ESS will absorb regenerative energy when train braking and also charge electric energy when feeding line is no load condition. Absorbed and charged energy will be supplied when train is accelerating condition. Due to ESS the energy variation will be minimized and this effect is estimated.

  • PDF

철도와 항공설비간의 EMC (EMC between Railway and Airplane Equipments)

  • 한문섭;김주락;이장무
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.1407-1412
    • /
    • 2007
  • This study examined EM compatibility between noise from electric railway and signal of ILS in the case that an AC double track system is located about 1km far from end zone of runway at the airport. ILS is the most major equipment to help give airplane route during the landing.

  • PDF

교류전기철도 급전시스템의 전차선 전압해석 (Analysis for Catenary Voltage of The ATs-Fed AC Electric Railroad System)

  • 이승혁;정현수;김진오
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2002년도 추계학술대회 논문집(I)
    • /
    • pp.490-496
    • /
    • 2002
  • This paper presents exact Autotransformers(ATs)-fed AC electric Railroad system modeling using constant current mode far locomotives. An AC electric railroad system is rapidly changing single-phase load, and at a feeding substation, 3-phase electric power is transferred to paired directional single-phase electric power. As the train moves along a section of line between two adjacent ATs. The proposed AC electric railroad system modeling method considers the line self-impedances and mutual-impedances. The constant current mode model objectives are to calculate the catenary and rail voltages with the loop equation. When there are more than one train in the AC electric railroad system, the principle of superposition applies and the only difference between the system analyses for one train. Finally, this paper shows the general equation of an AC electric railroad system, and that equation has no relation with trains number, trains position, and feeding distance.

  • PDF

철도차량기지용 단권변압기의 전압강하에 대한 이론적 고찰 (A Theoretical Study on Voltage Drop of Auto-Transformer for Railway Vehicle Base)

  • 유기성;김재문
    • 전기학회논문지
    • /
    • 제67권12호
    • /
    • pp.1723-1728
    • /
    • 2018
  • In order to investigate the voltage drop compensation effect of AT for domestic railway vehicle base, the parameters of AT voltage drop of railroad car base are Z3 (Impedance of feeder line), Xn ( Distance from railroad vehicle to AT to SS), and Dn (distance between both ATs of railway vehicle).In addition, when installed in a SSP for a railway vehicle base, there is no AT and feeder line in the railway vehicle base except for the SSP for the main line and the SSP for the railway vehicle base, so that if zero or ignored, the AC single-phase two- It can be confirmed that it becomes a form.

도시철도 직류 전력량 계측을 위한 직류용 스마트미터링 시스템 개발 및 성능시험 (Development and Performance Test of DC Smart Metering System for the DC Power Measurement of Urban Railway)

  • 정호성;신승권;김형철;박종영
    • 전기학회논문지
    • /
    • 제63권5호
    • /
    • pp.713-718
    • /
    • 2014
  • DC urban railway power system consists of DC power network and AC power network. The DC power network supplies electric power to railway vehicles and the AC power network supplies electric power to station electric equipment. Recently, because of power consumption reduction and peak load shaving, intelligent measurement of regenerative energy and renewable energy adapted on DC urban railway is required. For this reason, DC smart metering system for DC power network shall be developed. Therefore, in this paper, DC voltage sensor, current sensor, and DC smart meter were developed and evaluated by performance test. DC voltage sensor was developed for measuring standard voltage range of DC urban railway, and DC current sensor was developed as hall effect split core type in order to install in existing system. DC smart meter possesses function of general intelligent electric power meter, such as measuring electricity and wireless communication etc. And, DC voltage sensor showed average 0.17% of measuring error for 2,000V/50mA, and current sensor showed average 0.21% of measuring error for ${\pm}2,000V/{\pm}4V$ in performance test. Also DC smart meter showed maximum 0.92% of measuring error for output of voltage sensor and current sensor. In similar environment for real DC power network, measuring error rate was under 0.5%. In conclusion, accuracy of DC smart metering system was confirmed by performance test, and more detailed performance will be verified by further real operation DC urban railway line test.

능동형 전압제어를 통한 교류 전기철도 급전망에 대한 전력손실 분석 (A Power Losses Analysis of AC Railway Power Feeding Network using Adaptive Voltage Control)

  • 정호성;김형철;신승권;김진호;윤기용;조용현
    • 전기학회논문지
    • /
    • 제62권11호
    • /
    • pp.1621-1627
    • /
    • 2013
  • This paper compares power losses between voltage controlled before and after using power conversion device in AC feeding system. For this purpose we present voltage control procedures and criteria and model high speed line and train using PSCAD/EMTDC to compare power losses in various feeding condition. Power losses of the simulation result in power control before and after in single point feeding system was reduced maximum 0.37 MW(23.8 %) and average 0.23 MW(20.5 %) when one vehicle load operates maximum load condition. When three vehicles operate maximum load condition in one feeder section, power losses after voltage control was reduced 1.03 MW(49.5%) compared to before voltage control. And, power loss of parallel feeding system is reduced the average 0.08 MW(7.2 %) compared to the single feeding system. In conclusion, adaptive voltage control method using power conversion device can reduce power losses compared with existing method.

PSCAD/EMTDC를 이용한 교류 전철급전시스템 해석 (Analysis of AC Electric Railway System using the PSCAD/EMTDC)

  • 이한민;한문섭;창상훈;오광해;이장무;김주락
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 B
    • /
    • pp.1241-1243
    • /
    • 2002
  • This study presents a AC electric railway system analysis using PSCAD/EMTDC for circuit analysis and fault studies. This PSCAD/EMTDC model includes feeder, contact line, rails. Scott-transformer. Auto-transformer and so on. This model is based on four-port network which is an extension of two-port network theory. In order to verify the proposed model, fault studies of a test system are performed.

  • PDF

축소형 교류급전시스템 절연구간 자동절체장치 성능시험 (Test results of small scale changeover system using in neutral section for AC feeding system)

  • 장동욱;한문섭
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.948-953
    • /
    • 2011
  • In AC railway feeding system, three phase received from the network is changed to two phase power sources with different phases. The main circuit breaker installed train is automatically open by track signal when the train passes the neutral section. In order to continuously supply power source to train, the changeover system was used in Japan. Therefore, the train is able to operate under powering condition when it was passing through the neutral section. We investigated the control method to reduce the inrush current flowing main transformer in train. To examine the inrush current and operate the static semiconductor switch such as thyristor, we manufactured the small scale the changeover system and carried out performance tests.

  • PDF

윈도우즈 기반의 교류 전기철도 급전시스템 통합 시뮬레이터 개발 (Development of Integrated Simulator for AC Traction Power Supply System)

  • 김주락;김정훈
    • 전기학회논문지
    • /
    • 제59권1호
    • /
    • pp.76-81
    • /
    • 2010
  • This paper describes the development of integrated simulator with GUI(Graphic User Interface) for traction power supply system. This simulator consists of a lot of calculation modules such as TPS, train time schedule, line constant, and power supply system analysis. Each module has input and output structure respectively. The algorithms of all modules have confirmed the validity to comparison with field test that is performed on both high speed railway line and conventional line.