This paper presents exact Autotransformers(ATs)-fed AC electric Railroad system modeling using constant current mode far locomotives. An AC electric railroad system is rapidly changing single-phase load, and at a feeding substation, 3-phase electric power is transferred to paired directional single-phase electric power. As the train moves along a section of line between two adjacent ATs. The proposed AC electric railroad system modeling method considers the line self-impedances and mutual-impedances. The constant current mode model objectives are to calculate the catenary and rail voltages with the loop equation. When there are more than one train in the AC electric railroad system, the principle of superposition applies and the only difference between the system analyses for one train. Finally, this paper shows the general equation of an AC electric railroad system, and that equation has no relation with trains number, trains position, and feeding distance.
This study presents the AC railway system modeled by EMTDC in detail. The ,model made by EMTDC have a lot of advantages. It could be available for the system change, simulated repeatedly and also applied regarding very complicated systems. EMTDC simulations to verify this model are compared with the hand calculations. It is confirmed that the model made by EMTDC is correctly designed.
The electric railway has been widely used as a transportation all over the world. It also was opened in 1973 in korea and it has been steadily proceeded in making electric railway network for a big city and building Keongbu high speed , electric railway. That's why the system of electric railway is able to solve the environmental pollution and operate the useful energy in environmental ways, it helps to increase the ability of transportation and to decrease the cost. Because of the advantage of making the economic situation better, the system of electric railway is trying to do their best in developing technique of electric railway. Because of the increasing of transportation and the high speed operation, cars with regenerative braking system was adapted. Therefore, unbalanced voltage and current of three phase system and the drop and rise of voltage of feeding circuit is expected. Now that building the substation, newly spends lots of costs and time, it is a very difficult situation to solve the problem. We can guess that electric railway line can't receive power from the power system of bigger size in building newly electric railway. In this paper, it was proved that series voltage compensator was suitable as a solution according to voltage drop and voltage fluctuating through computer simulation.
The electric power, regenerated while railway vehicles braking or running downhill, makes U line voltage rise and the feeding system may not be secure. In order to keep away from these kind of insecurity, the regenerative energy should be consumed by loads or transmitted to the AC side via certain devices such as DC/AC converters. This paper introduces the developed regenerative inverter for electric railway.
In an electric railway feeding system, transient over-voltage often appears due to the feeder's direct lightning and induced lightning, while switching over-voltage also frequently occurs during operation of electric feeding in substation facilities. Such over-voltage is several times larger than the regular power, and accordingly leads to the dieletric breakdown of eletric power products such as invasion transformers and circuit breakers. Arresters are installed to protect these machines, while arrester counters are installed to observe the arrester's activation. This thesis aims to explore the status of an arrester counter that is being activated several thousand times, determine whether the arrester has actually been activated in relation to the counter, and investigate the over-heatedness and risks of the arrester.
In case of DC railway, value of ESS(Energy Storage System) is already approved. Whereas AC railway system, there are a lot of differences such as system design and operation pattern. Therefore there is doubt about AC ESS usefulness. Especially, regenerative energy can return to the source. So in case of AC 25kV system, it is necessary to consider different operation algorithm compare to DC railway system. In this paper ESS which is installed in AC high-speed railway was introduced. Power consumption pattern of High speed trains were analyzed, proper storage material was reviewed and operation algorithm was suggested. Super capacitor and Battery was used with hybrid type. Super capacitor was used to handle short term energy movement because of its prompt response and battery was used to handle long term energy movement because of its high energy density. Also in case of operation algorithm, phase control method was upgraded compare to voltage magnitude detection method.
This paper analyze scenario of feeder wire fault that occurs in the AC feeding system considering train position. The fault location of AC feeding system is calculated by measuring impedance. However, in this way, estimation error can be occurred because of tie connection, boosting current, etc. Therefore, it's hard to find fault location, so that it is required to detailed circuit analysis according to fault location. We analyze the short circuit impedance values with respect to feeder wire fault according to a train position. In this paper, PSCAD is used for modeling and analysis of AC railway feeding system.
The rectifier for Electric railway is one of the most important facilities in DC urban railway which converts power from KEPCO(AC 22.9kV) to the electric mil car(DC 1.5kV), therefore it should be managed as the best condition for the drive. There are several things to cause performance degradation and deterioration of parts such as pollutants occurred by it established under the ground such as dust or foreign substances, rapid changes of driving current, and pyrogen which put the rectifier for Electric railway in malfunction. On the flow of time, the rectifier for Electric railway is causing a malfunction or failure which drive electric rail car in operations as well as loss of life. In this research we try to find the way of removing the various components of mal-functions in the performance of the rectifier for Electric railway by Over-Haul and reform itself, which gives us to get the chance investment of the reduction, the reliability of power supply to the electric rail car.
The traction power demand highly varies with time and train positions and the traction load is a large-capacity current at single phase converted from 3-phase power system. Subsequently, each phase current converted from 3-phase power system cannot be maintained in balance any longer and thus the traction load can bring about imbalance in three-phase voltage. Therefore, the exact assessment of voltage unbalance must be carried out preferentially as well as load forecast at stages of designing and planning for electric railway system. The evaluation of unbalance voltage in areas, such as electric railway depots should be a prerequisite with more accuracy. The conventional researches on voltage unbalance have dealt with connection schemes of the transformers used in ac AT-fed electric railroads system and induced formulas to briefly evaluate voltage unbalance in the system(3). These formulas are still being used widely due to their easy applicabilities on voltage unbalance evaluation. Meanwhile, they don't take into account detailed characteristics of ac AT-fed electric railroads system, being founded on some assumptions. Accordingly. accuracy still remains in question. This paper proposes a new method to more effectively estimate voltage unbalance index. In this method, numerous diverted circuits in electric railway depots are categorized in three components and each component is defined as a two-port network model. The equivalent circuit for the entire power supply system is also described into a two-port network model by making parallel and/or series connections of these components. Efficiency and accuracy in voltage unbalance calculation as well can be promoted by simplifying the circuits into two-port network models.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.