• Title/Summary/Keyword: A no charge parking

Search Result 3, Processing Time 0.017 seconds

A Study for Parking Characteristic of Parking Operation Method (주차장 운영방식에 따른 주차특성 분석)

  • Jung, Ki-Soo;Lee, Young-Woo
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.13 no.1
    • /
    • pp.5-13
    • /
    • 2010
  • Industrialization and urbanization occurred-traffic delay, traffic accident and parking problem etc.-variety of transportation problems. Parking problem is one of the transportation problem then transportation engineers would get involved in trying to solve parking problem. A way to overcome a variety of parking problems needs preliminary data for conditions of parking but it lacks the preliminary data to do so. Thus this study analyzed a characteristic of a parking through a field survey for parking in Daegu Metropolitan City. This study analyzed parking characteristic of parking operation method. This study result reveals difference between a toll parking and a no charge parking characteristic. Thus a close examination for a toll parking characteristic and a no charge parking characteristic is a prerequisite for a rational parking policy.

  • PDF

A Study of Electronic Vehicle Charging Station Structure System Using PV(Photovoltaic) System (PV 시스템을 이용한 전기자동차 충전소의 구조시스템 연구)

  • Lim, Jae-Hwi;Yoon, Sung-Won
    • Journal of Korean Association for Spatial Structures
    • /
    • v.11 no.1
    • /
    • pp.105-112
    • /
    • 2011
  • Fundamental Electric vehicle charge system is urgently needed for commercialization of electric vehicles. Car parking building is equipped with PV system for providing electricity to charge electric vehicles, because it must be charged at least for 30 minutes. In parking lots abroad, electric car charging stations are installed to charge electric cars by the electricity gained from PV systems which are also installed. Also, charge infrastructure construction plans and electric car charging facility support standards are being set and proposed, but there are no cases like abroad of electric car charging stations using PV systems and only electric car charging stations using ordinary electricity are being proposed. Therefore, this paper prepares establishment of domestic electric car charging networks. By researching inside outside solar parking lots and cases of abroad PV system electric car charging stations, and by analysis and comparative analysis of structural systems, structural material, and etc., many cantilever structure and small-size types were installed in PV system electric car charging stations.

Displacement and Stress Monitoring for Excavation Deep Foundation (인접지역의 깊은 터파기 굴착에서 변위 및 응력의 계측)

  • 원연호
    • Explosives and Blasting
    • /
    • v.17 no.1
    • /
    • pp.27-55
    • /
    • 1999
  • The excavation works for deep foundation in urban areas have recently increased complaints of blasting vibration and settlement of ground level. Foundation must be excavated approximately up to 24-28m depths from the surface. The roads and subway line pass through the excavation area. The Dae-chung station is also located at the nearest distance 5-35m from the working site. To protect subway station and adjacient some structures from blasting and settlement, the level of ground vibration, displacements and stress were monitored and analyzed. The results can be summarized as follows ; 1. An empirical particle velocity equation were obtained by test blasts at Nassan Missi 860 Office tel construction site. $V{\;}={\;}K(D/\sqrt{W})^{-n}$, where the values for n and k are estimated tobe 0.371 and 1.551. From this ground vibration equation, the max. charge weight per delay time against distance from blasting point is calculated. Detailed blasting method is also presented. 2. To measure the horizontal displacement in directions perpendicular to the borehole axis, 6 inclinometers installed around working sites. The displacement at the begining was comparatively high because the installation of struts was delayed, but after its installation the values showed a stable trend. Among them, the displacement by 3 inclinometers installed on a temporary parking area showed comparatively high values, for example, the displacement measured at hole No. IC-l recoded the max. 47.04mm for 6 months and at hole No. IC-2 recorded the max. 57.33mm for 7 months. So, all of these data was estimated below a safe standard value 103mm. 3. Seven strain gauge meter was installed of measure the magnitude and change of stress acted on structs. The measured value of maximum stress was $-465{\;}kgf/\textrm{cm}^2,{\;}-338.4{\;}kgf/\textrm{cm}^2,{\;}302.3{\;}kgf/\textrm{cm}^2$ respectively. In compareto the allowable stress level of steel, they are estimated to be safe.

  • PDF