• Title/Summary/Keyword: A Major Building

Search Result 1,576, Processing Time 0.032 seconds

A Comparative Study of Building Energy Simulations for Building Types in Multiple Stock Housing based on BIM(Building Information Modeling) (BIM기반의 공동주택 주동 유형별 건물에너지 시뮬레이션 비교에 관한 연구)

  • Lee, Byeongho;Lee, Geonwon;Yeo, Youngho
    • KIEAE Journal
    • /
    • v.10 no.4
    • /
    • pp.87-100
    • /
    • 2010
  • The energy efficient design of the multiple stock housing is very important not only to save energy but also to increase sustainability in a whole city because the multiple stock housing type is dominated in the major residential supply markets in Korea. During the early design phase of the multiple stock housing type, the architect need convenient and accurate tools for evaluating energy consumptions based on building types rapidly. Building Information Modeling(BIM) is introduced as useful tool systems providing interoperability between 3rd dimensional modeling tools and environmental engineering analysis tools, and could reduce time and cost for unnecessary modeling works in the analysis. However, it is still hard to apply to building design practice and integrated energy simulation techniques because interoperability using industrial standard file formats such as IFC and bXML is still underdeveloped. Therefore, the purpose of this study is to perform the building energy simulations, to compare the results on typical building types in multiple stock housing based on BIM, and to clear the problems using industrial standard file formats between 3rd dimensional modeling and building energy simulation software. In addition, through comparisons with simulation results according to the typical building types such as building forms, orientations, and building stories, the interrelation ship and characteristics of BIM based building energy simulation software are analysed and evaluated.

A Basic Study on the Design Method for Decorative Floodlighting in an Architecture (건축에 있어 경관조명 설계 기법에 관한 기초적 연구)

  • 최택진;이성주;김회서
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 1999.11a
    • /
    • pp.201-206
    • /
    • 1999
  • Since more than Building Decorative Floodlighting in an Architecture is used for improving image at city, the importance of an efficient Building Decorative Floodlighting in an Architecture can't be overemphasized. The purpose of this study was to develop a Building Decorative Floodlighting process model, through analyzing, measuring brightness of real Building Decorative Floodlighting forms in night of Seoul. The results of the study can be summarized as: Building Decorative Floodlighting process model consists of four major which are $\circled1$ Building Audit $\circled2$ Building Analysis $\circled3$ Selection Opportunities $\circled4$ Follow through

  • PDF

A Proposal of Quality Model for Alternative Evaluation of Major Construction Projects (건설공사에서 주요공종 대안평가를 위한 품질모델 제안)

  • Lee, Jong-Min;Seo, Bo-Ram;Son, Hyun-Jeong;Lee, Tae-Shim;Yang, Jin-Kook;Lee, Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.43-44
    • /
    • 2019
  • Major construction projects will be directly related to construction costs and disclosure period depending on the selection of the construction method. However, there are some sites that choose without taking into account sufficient conditions. Therefore, the company wants to present a quality model that suits the characteristics of major engineering fields.

  • PDF

An Inquiry on the Building Process of Pedagogical Content Knowledge of Prospective Mathematics Teachers -centered at function concepts- (수학과예비교사들의 교수학적지식 형성 과정 탐구 -함수 개념을 중심으로-)

  • Kang Yun-Soo;Jun Sung-A
    • The Mathematical Education
    • /
    • v.45 no.2 s.113
    • /
    • pp.217-230
    • /
    • 2006
  • The purpose of this study is to inquire the building process of Pedagogical Content Knowledge of prospective mathematics teachers about the function concepts. For this purpose, We performed the following steps; First, we performed the survey relaying to the prospective mathematics teachers' teaching experiences, capabilities of their error evaluation of the students, and viewpoints about the function concepts. Second, we performed the survey on the subject-matter knowledge about the function concepts and the key items of designing teaching plans about the function concepts. And then, we interviewed the participants to check the results of the surveys and to supplement the necessary contents. The collected data was relatively correlative and analyzed in the process. As a result, we found the followings; First, subject-matter knowledge of prospective mathematics teachers about the function concepts is different depending on the grades. Second, prospective mathematics teachers are building more extended function concepts through the major subjects. Third, the major subjects are important to build the Pedagogical Content Knowledge of function concepts. Fourth, teaching experience plays an important role in transforming subject-matter knowledge of function concepts to Pedagogical Content Knowledge of it. Fifth, building the Pedagogical Content Knowledge means transferring the teacher's viewpoint from himself/herself to the learner.

  • PDF

ROBOTICS AND AUTOMATION IN CONSTRUCTION INDUSTRY

  • Younus Khan;G. Chandra Sekhar Reddy;V.S.S. Kumar
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.527-532
    • /
    • 2005
  • The construction industries are facing problems of productivity, quality of work, safety, and the completion of projects in time. In construction industry a worker is exposed to hazardous environment, and has to do more physical work, effecting his health and also productivity. The automation and robotics can offer solution to many problems of the industry. In the past the major barrier to construction automation is the lack of electronic components and systems. This is solved now with the development of information technology, and the current obstacle is the high cost of automated systems, shortage of public money for R&D, and problems of acceptance. The robots employed in construction have followed the same concept as those employed in manufacturing. However, construction industry requires a different kind of robot compared to manufacturing Industry. The robots are stationery and product moves along the assembly line in manufacturing sector, but construction robots have to move about the site because buildings are stationary and of large size. The construction robots must function in adverse weather conditions, including variation in humidity, and temperature and increase the overall construction productivity rate. The major objective of the paper is to review the existing applications of building robots and to assess their implementation in building industry. A case study is considered for the implementation of robots for the painting work of the University Building at Saifabad PG College of Science, Hyderabad, India.

  • PDF

Building Response to Excavation-Induced Ground Movements and Damage Estimation (굴착유발 지반변위에 의한 인접구조물의 거동 및 손상도 예측)

  • Son, Moo-Rak;Cording, E.J.
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.249-256
    • /
    • 2006
  • New infrastructures and buildings are being constructed increasingly in congested urban areas, and excavation-induced ground movements often cause distortion and damage to adjacent buildings. Protection of adjacent structures occupies a major part of the cost, schedule and third-party impacts of urban development. To limit damage or mitigate their effects on nearby structures, it is highly important to understand the whole mechanism from excavation to building damage, and to estimate building damage reliably before excavation and provide appropriate measures. This paper investigates the effects of excavation-induced ground movements on nearby structures, considering soil-structure interactions for ground and structures, and a building damage criterion, which is based on the state of strain, is proposed. The criterion is compared with other existing damage estimation criteria and a procedure is finally provided for estimating building damage due to excavation-induced ground movements.

  • PDF

Influence Factors and Management based on Phase of Building Construction for the Improvement of Post Occupancy Indoor Air Quality

  • Lim, Hyoung-Chul
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.6
    • /
    • pp.576-586
    • /
    • 2011
  • In recent years, pollution in residential spaces has been a significant area of concern. In particular, the indoor air quality (IAQ) of an apartment building before occupancy, which is related to the interior material, is a serious problem. Unlike previous research, which has mainly focused on pollution control after construction, this study has derived influencing factors and priority of management with a controlling schedule for IAQ. The objectives of this research are 1) control of schedule or improvement of management for IAQ, 2) distribution of responsibility to the parties concerned (factory, material company, construction company, design and engineering, occupancy). The results show the relative priority of the four major items in wall?based apartment buildings and in column?based apartment buildings. An analysis of the parties responsible for improvement based on the IAQ results shows more efforts to improve IAQ are needed in material factories and engineering/design companies.

DEVELOPMENT OF MOBILE APPLICATION BASED RFID AND BIM FOR DEFECT MANAGEMENT ON CONSTRUCTION FIELD

  • Oh-Seong Kwon;Hwi-Gyoung Ko;Hee-Taek Park;Chan-Sik Park
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.7-13
    • /
    • 2013
  • Recently, defect management have been considered as one of the major issues for more large-sized and complicated in domestic construction industry. However, the defect management have not been performed systematically because of special manpower, excessive amount of documents, 2D based inspection work, unclear traditional checklists, complicated work process and difficulty in communicating construction information. Therefore, the construction field manager could not performed the quality inspection and defect management work on time as well as the reliability of recorded quality and defect factors was decreased. The primary objective of this study is develop a Construction Defect Management Application CDMA) using a mobile (smartphone). The application can be sharing a huge information and communication technology based on RFID (Radio-Frequency Identification), BIM (Building Information Modeling) which enables field mangers to efficiently gather the information of defection in construction on-site.

  • PDF

Who Occupies the Green Building: a Case of Australia

  • Kim, Sumin;Kim, Jinu;Lim, Benson T.H.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.549-553
    • /
    • 2015
  • For successful outcome of real estate development projects, it is important to understand the potential tenants as they drive the demand for properties. The aim of this study is to investigate tenant characteristics of the Australian green office building sector. The specific objectives are to; (1) compare and contrast the increment trend of green buildings within the green office building sector; (2) identify the tenancy profile of green buildings; (3) ascertain the possible industry concentrations within the current green building sector; and (4) explore the relationship between green building occupants' characteristics and their tenancy. Descriptive statistics shows that Finance, Insurance and Real Estate (FIRE) industries along with government owned companies are the major tenants of green office buildings in the NSW State of Australia. In particular, real estate companies occupy more than half of the NSW based green office buildings whilst one third of them are the tenants of the 6-star rated buildings - the highest rated building in the current form of Australian Green Star accreditation scheme.

  • PDF

A Study on the Design Elements and Tectonics for High-Rise Building Space Planning (초고층 공간계획의 디자인 요소와 구축에 관한 연구)

  • Cho, Jong-Soo
    • Korean Institute of Interior Design Journal
    • /
    • v.19 no.1
    • /
    • pp.3-15
    • /
    • 2010
  • The high-rise building is a dramatic phenomenon and a powerful expression of architecture in the modern civilization. The architecture of these high-rise buildings has been developed with mutual contributions of architectural aesthetic form and advanced technologies. Architecturally the significant evolution of tall buildings from ancient towers is a "change of function" from some religious symbols to a commercial concept that has aesthetically become acceptable with the changing of modern society and culture driven by a technological evolution. Generally, this commercial function in the evolution of high-rise building is office where high-rise working style is simply a necessity to meet quantitative market demands since this style in major cities around world has been changed from low-rise to high-rise during the last several decades in influenced of the modern industrial society. To achieve optimum spaces with architectural aesthetics in the high-rise building, the design has become collaborative, requiring the input of architects, engineers, economists, and other consultants. Hence, architects must deeply understand the basic planning theories of high-rise buildings and try to find optimum planning between architectural aesthetics and other issues. For the approach, we can firstly start with measurement and analysis of the planning use situation for major planning issues of high-rise buildings in practice. Therefore, this study is to analysis Design Elements and to find commonly used planning strategies, tectonic, of high-rise building in practice. It will give a chance to confirm commonly used planning and then becomes the starting point of the planning development of high-rise buildings based on practical planning issues.