• 제목/요약/키워드: 765kV T/L

Search Result 21, Processing Time 0.022 seconds

The conception of conductor selection for KEPCO 765 kV T/L. (한전 765 KV 송전선로 전선선정 검토의 기본 방향)

  • Koo, B.M.;Oh, C.H.;Park, Y.S.
    • Proceedings of the KIEE Conference
    • /
    • 1994.07b
    • /
    • pp.1505-1508
    • /
    • 1994
  • Lately in KEPCO, the power plant capacity has increasingly become larger than before and it has become difficult to get R.O.W for T/L. Therefore KEPCO decided to increase its system voltage level from 345kV to 765kV. By doing this, KEPCO would like to expand its transmission capability by less T/L route. In 765kV system, we should consider various kinds of environmental impacts that can be neglected in lower voltage level. These environmental impacts are very important factor in T/L design. That can be changed greatly according to the selected conductor. And also conductor selection has relation with the economy of T/L construction directly. This paper deals with some general factors to be considered and basic principles about the conductor and ground wire selection for 765KV T/L with referring to the experiences of foreign utilities.

  • PDF

Analysis of Electrical Safety Level Test for Barehand Work at 765kV Vertical Double Circuit Six Bundle Conductors on the Suspension String Tower Type (765kV 수직2회선 6도체 현수형 철탑에서 직접활선작업의 안전성 평가분석)

  • Kim, Dae-Sik;Han, Sang-Ok
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.57 no.3
    • /
    • pp.275-278
    • /
    • 2008
  • It has been issued that the necessity of Live line work for 765kV vertical double circuit six bundle conductors transmission line when the characteristics of transmission line, the composition of T/L and near the T/L circumstances etc. Others are considered. The Barehand method of UHV T/L is extremely dangerous work and especially it is directly related with lineman life so it is very dangerous. It should be performed several technology developments for live-line work on the UHV T/L, that should be considered such as the electrical influence on workers near the T/L, development of live-line facilities, guarantee of safety, the technical rules of live-line work, the safe method of live-line work and etc. In order to maintain the 765kV transmission lines safely by barehand work, first of all, we should know the analysis of electrical safety level test in live-line work at 765kV vertical double circuit six bundle conductors on the suspension string tower type.

Analysis of 765kV Transmission Line Fault (765kV신태백#1T/L 고장에 따른 보호시스템 동작 분석)

  • Yoon, J.W.;Kim, B.J.;No, J.H.;Kim, J.Y.;Kim, M.H.
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.362-364
    • /
    • 2005
  • 전력계통이 대형화되고 복잡 고도화 되는 추세에 따라 전력계통운용에서 송전선로 보호시스템의 중요도가 매우 커지게 되었다. 이에 국내에 적용되기 시작한 765kV 전력계통망은 하위 전압계급 계통망에 미치는 영향이 커지게 되어 765kV 송전선로 보호시스템의 보호 신뢰도 향상은 전력계통을 안정적으로 운전하는 데 있어서 매우 중요한 요소가 되었다. 지난 2004년 11월에 신태백-신가평변전소간 765kV신태백T/L의 상업 운전이 시작되었고 그 상업운전 중 2005년 3월 낙뢰사고에 의한 765kV신태백T/L의 고장이 발생하였다. 이에 본 논문에서는 신태백T/L의 고장이 발생에 대한 보호시스템의 동작 상태를 분석한 사례에 대해서 기술하였다.

  • PDF

A study on the ice and snow loading condition in Taebaek and Sabuk area in Gangwon province for the construction of KEPCO 765kV transmission lines (한전 765 kV 송전선로 건설을 위한 강원도 태백.사북지역 착빙설 하중조건 검토)

  • Park, K.H.;Kim, Y.W.;Won, B.J.
    • Proceedings of the KIEE Conference
    • /
    • 1996.07c
    • /
    • pp.1923-1924
    • /
    • 1996
  • Some part of the route in KEPCO 765kV transmission line being constructed passes through a high mountain area which is 800m above the sea level (Taebaek, Sabuk area in Gangwon province). This area is the top part of Taebaek mountains corresponding to the backbone of korean peninsula and has lots of snow during the winter season because the winter seasonal wind gone up along the mountainside of Taebaek Mts. meets open air of the East sea. KEPCO has experienced 63 faults of T/L between 1968 and 1993 in this area, which is a very serious problem. Especially 154kV Hwang-Ji T/L fault in 1990, 2 was a unprecedented case which needs to be analyzed carefully to take proper measures. After reviewing ice and snow loading conditions and analyzing the fault of Hwang-Ji T/L, we're going to determine the revisement of ice and snow loading condition in this area to increase reliability of 765kV transmission line.

  • PDF

Technology and Design Standards of 765kV 1cct Transmission Line (765kV 1회선 송전선로 기술기준 및 설계방안)

  • Sim, Soon-Bo;Min, Byeong-Wook;Park, K.H.;Jo, C.I.;Kim, J.Y.;Sin, I.S.
    • Proceedings of the KIEE Conference
    • /
    • 2002.11b
    • /
    • pp.80-82
    • /
    • 2002
  • To solve the difficulty in obtaining transmission routes and substation sites. increase the transmission capacity between generation sites and load centers. and enhance the stability of the power system. we have constructed and operated the 765kV double circuit transmission line(hereunder T/L) from the Dangjin thermal power plant and the Uljin nuclear power plant to the metropolitan. It makes it possible for us to accumulate know-how of the 765kV system that is the highest operating system level in Asia. As the second 765kV project, we are going to construct the 765kV single circuit T/L between Ansung and Gap yung. Because of the different electrical and mechanical characteristics. we are in need of different design technology. This paper presents the optimal design of 765kV single circuit transmission line after due consideration about the arrangement of conductors. the shape of a tower, insulation, etc.

  • PDF

Predicting formula development of audible noise on a 765kV AC transmission line(I) (765kV 교류 송전선로의 가청소음계산 예측식개발(I))

  • 이동일;구자윤
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.45 no.4
    • /
    • pp.612-615
    • /
    • 1996
  • Audible noise from corona discharge had been identified as one of the most important factors in the design of conductor configurations for high-voltage transmission lines. 500kV and above. Therefore this paper describes audible noise characteristics of 6 X 480mm conductor bundle in KEPRI 765kV Test Line and Corona Cage. Prediction formula for audible(corona) noise on a 765kV transmission Line was developed using this results.

  • PDF

A study on the mechanical strength system and supporting method of insulator strings for KEPCO 765kV transmission lines (한전 765 kV 송전선로 애자장치 강도계열 및 지지방식에 관한 검토)

  • Han, Yup;Park, K.H.;Yoon, S.H.;Seo, C.S.
    • Proceedings of the KIEE Conference
    • /
    • 1996.07c
    • /
    • pp.1920-1922
    • /
    • 1996
  • After determining the type and string condition of conductor of 765kV transmission lines, we studied the mechanical strength system of insulator strings to support conductors and insulate conductors from towers. In this paper, for the insulator strings which will be used in 765kV transmission lines, we're going to optimally determine the mechanical strength system and supporting method in the consideration of the reliability, economics and the survey data of T/L routes, and also suggest the calculation method to stipulate for the application limits of suspension and strain insulator strings according to the loadspan and height difference of tower.

  • PDF

Determination of Reasonable Amounts of Under-Voltage Load Shedding for 765kV T/L According to the Power System Reliability Standards (전력계통 신뢰도 기준 분석을 통한 765kV 선로사고에 대한 부하차단 적정량 산정에 관한 연구)

  • Yoo, Je-Ho;Hur, Jin;Cha, Jun-Min;Kim, Tae-Gyun;Kang, Bu-Il;Cho, Soo-Hwan
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.6
    • /
    • pp.845-851
    • /
    • 2015
  • Load shedding is a last measure to avoid nationwide cascading collapses of power system by removing the pre-determined amount of loads from the main grid. In Korea, SPS(Special Protection System) is prepared to keep the power system stability from the extreme contingency of the critical transmission line losses. Among them, we need to pay attention to 765kV T/L’s because they have great influence on the total system stability. According to the present SPS operating guide, the total loads of 1,500MW should be removed through 2 step under-voltage load shedding(UVLS) scheme in case of 765kV T/L’s contingencies. However, it is not clear to defined how to determine the typical load reduction amounts for each case. This paper proposes a method to estimate appropriate amounts of load shed for 765kV T/L’s contingencies by analyzing the relevant national and international standards.

A study on the design and manufacture technique for 765kV T/L pipe steel tower. (765kV 송전용 강관철탑설계 및 제조기술에 관한 연구)

  • Kim, J.B.;Lee, D.I.;Park, T.D.;Lee, I.H.;Shin, S.S.;Kim, H.R.
    • Proceedings of the KIEE Conference
    • /
    • 1993.11a
    • /
    • pp.281-283
    • /
    • 1993
  • We have studied and researched about the pipe steel tower. Which can be designed briefly with fewer members and due to electrical supported with single member economically and safely as higher structure and bigger load is required for 765kv T/L and it is difficult to transmit the electricity with good quality Safely and economically by the traditional steel tower composed of single angle.

  • PDF

Flashover Characteristics of Damaged Insulator Strings for Live-line works in 765kV T/L (765kv 송전선로 활선작업을 위한 불량애자 발생 유형별 전기적 섬락특성 분석)

  • Lee, H.K.;Shon, H.K.;Park, M.Y.;Park, I.P.;Kim, H.J.
    • Proceedings of the KIEE Conference
    • /
    • 2005.05b
    • /
    • pp.31-34
    • /
    • 2005
  • The 765kV transmission line will be maintained by live-line works for efficient operation, In order to maintain the 765kV transmission lines safely by live-line works, lineman have to know flashover characteristics of the insulator strings with damaged insulators. This paper suggests flashover characteristics of the 765kV insulator strings from experimental test results directly.

  • PDF