• Title/Summary/Keyword: 4D CAD System

Search Result 197, Processing Time 0.023 seconds

Improved Methodology of Construction Information Management in 4D CAD System (4D-CAD시스템의 공사정보관리 효율화방안)

  • Kang Leen Seok;Kim Chang Hak;Ji Sang Bok;Han Joo A
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.1132-1135
    • /
    • 2004
  • Recently. our construction industry is using 4D-CAD system but the public Database (DB) for the 4D-CAD system is insufficiently built. It is difficult to connect 4D-CAD system information such as schedule, drawings. Therefore this study suggest a methodology to link the 4D-CAD system information with work breakdown structure(WBS) and the methodology suggested in this study was applied to a 4D-CAD system

  • PDF

Development and Case Study of 4D CAD System for Visualizing Schedule Data of Construction Project (건설시설물 공정정보 시각화를 위한 4D CAD시스템의 개발 및 적용사례 분석)

  • Kang, Leen-Seok;Yun, Seon-Mi;Kwon, Jung-Hui;Mun, Jin-Seok
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.4
    • /
    • pp.373-380
    • /
    • 2007
  • Recently, various 4D CAD systems for visualizing construction schedule data are being developed. Specially, in case of railway project, the numerical information of progress data should be changed with visualized data by long construction section because the railway project consists of long length in construction site. This study suggests a case study of development of 4D CAD system for visualizing schedule information and the major functions of developed system are verified by railway project. The detailed application procedure of 4D CAD system including input data for a railway project is described in the study. The practical application of 4D CAD system can be improved in railway project by these demonstration researches.

Fundamental Study of 4D CAD Application by Using Augmented Reality for Civil Engineering Project (증강현실(Augmented Reality)의 토목시설물 4D체계 활용을 위한 기초적 연구)

  • Kang, Leen-Seok;Moon, Hyoun-Seok;Kim, Hyun-Soo;Choi, Hyung-Lae;Kim, Chang-Hak
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.658-661
    • /
    • 2008
  • This study aims to suggest a methodology for developing the AR-4D CAD system which can improve construction progress control process by using augmented reality(AR) technology for civil engineering project. This study reviews practical application of AR process in 4D CAB system and suggests the detailed requirements, information flow system and integrated interface function for developing AR-4D CAD system. Through these methods, this research classifies main functions of AR-4D CAD system that can visualize construction progress control data, and suggests an operation scenarios of the system.

  • PDF

Improved Link System of Schedule and 3D Object for VR-base Construction Project (가상건설기반의 건설공사 일정 및 3D객체 연동시스템의 개선된 구축방안)

  • Kwon, Jung-Hui;Moon, Hyoun-Seok;Park, Seo-Young;Gi, Sang-Bok;Kang, Leen-Seok
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.289-294
    • /
    • 2007
  • Virtual reality (VR) technology for construction project includes 3D CAD application and 4D CAD system for visualizing construction schedule data. 3D CAD application is more important in the design phase and 4D CAD system is effective tool in the construction phase. This study suggests a methodology to develop VR functions that can be used for project life cycle. The results of this study includes composition algorithms to make VR systems such as bird's eye view system, VR drawings system, VR telepresence system and VR risk management system. Those methodologies can be used for integrated VR system with nD CAD object.

  • PDF

Knit Design Using 3D Virtual Clothing Simulation Program of Knit CAD System (니트 CAD시스템의 3D 가상착의 프로그램을 활용한 니트디자인)

  • Lee, Seul-A;Lee, Yoon Mee;Lee, Younhee
    • Journal of the Korean Society of Costume
    • /
    • v.65 no.1
    • /
    • pp.104-117
    • /
    • 2015
  • Recently, the fashion industry has been integrating with The IT industry in order to develop in various ways. This study looks into ways to utilize the 3D CAD system, which would reduce time and cost while producing samples, and strengthen the communication between the brand and its cooperators by deploying knit designs using Knit CAD system's 3D virtual clothing program. The research method was reference, Internet resources 3D fashion CAD system and 3D Knit CAD system. Based on the data, simulation of the complete design of 4 deployed knit designs was done by using 3D virtual clothing program of the Knit CAD system utilizing knit design elements. One of each design element among the virtual clothing designs was chosen to produce real clothing, and the experts did verification on the appearance assessment of 3D virtual clothing knit designs of the Knit CAD system. As a result, 3D virtual clothing knit design of the Knit CAD system proved itself as an efficient system in terms of time and cost.

Development of Telepresence System for Schedule Management in Railway Construction Project (철도시설공사의 현장 공정관리를 위한 원격 영상 운영체계 개발)

  • Kang, Leen-Seok;Kim, Hyeon-Seung;Park, Jin-Jung;Moon, Hyoun-Seok;Shin, Min-Ho
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.1
    • /
    • pp.23-30
    • /
    • 2010
  • In the construction phase, the existing schedule management system by 4D CAD has been difficult to check for a status and progress of construction product in real-time because it simulates only VR (virtual reality) object based on a planned schedule. This study suggests a construction schedule management system by telepresence technique that can visualize progress status in real-time by using 4D CAD system based on remote monitoring. The telepresence methodology and system were developed in the study and they were verified for a railway construction project. The developed system can examine the status and progress of construction because it can compare 4D simulation based on planned schedule with real-time site images through web-camera.

Development of Major Functions of Visualization System for Construction Schedule Data in Plant Project (플랜트공사 관리 효율화를 위한 공정정보 시각화 시스템의 주요 기능 구성방안)

  • Kang, Leen-Seok;Moon, Hyoun-Seok;Ji, Sang-Bok;Lee, Tae-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.1
    • /
    • pp.66-76
    • /
    • 2008
  • Plant project is a complex project that consists of civil engineering, building, mechanical and electronic works. The schedule management is one of important factors in plant project because the construction duration of the project is very short comparing with the other construction projects. Specially, 4D CAD system needs to visualize construction schedule information in those complex projects. This study suggests methodologies for improving 4D CAD functions by considering those project characteristics. To develop a plant 4D CAD system, this study includes to develop new functions by analyzing actual schedule information from the plant construction sites.

Earned Value Management Systems Using 4D-CAD (4D CAD 활용을 통한 공정-원가 통합 시스템)

  • Park Ji-Ho;Jung Young-Soo;Kim Sung-Mo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.504-508
    • /
    • 2003
  • Cost and schedule are the major concerns for the successful construction project management. The four dimensional CAD (4D CAD) integrating graphical data and scheduling data has also been an area of research interests for improving construction controls. In order to achieve the benefits from these areas in an integrated way, this study proposes a 4D-EVMS system for the owners. Managerial requirements for cost and schedule control for the owners are identified first. A 4D-EVMS model is then proposed which provides functional flexibility in order to enhance the efficiency of the system. Lessons learned and practical implications are briefly summarize.

  • PDF

A Study on 4D CAD and GIS Integrated System for Process Risk Management Model (4D CAD와 GIS의 통합시스템을 통한 프로젝트 단계별 리스크관리 모델에 관한 연구)

  • Jeon, Seung-Ho;Yun, Seok-Heon;Paek, Joon-Hong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.7 no.3
    • /
    • pp.91-98
    • /
    • 2007
  • Recently a construction industry introduces information that brings about many advantages in the early planning phase, design phase and construction phase. Especially it replaces 2D, 3D systems(usually using explanation of drawing information) ai 4D CAD(offering a sort of 4D-having relation of construction schedule and 3D drawing information). Nevertheless a 4D has these benefits, it has limits which are not only usually using 3D modeling but also limit of making full use of practical affairs because of a lack of connecting varietals of progress of work. To solve these uppermost limits, this research is presenting unified systems to use in risk management which are efficient management of space and non-space information, space analysis, making full use of data base, introducing GIS system of easy interaction.

A Case Study of 3D and 4D CAD Application for the Domestic Construction Project (국내 건설공사 3D 및 4D CAD 적용사례로 본 현황분석)

  • Gi, Sang-Bok;Kang, Leen-Seok;Kwon, Jung-Hui;Moon, Jin-Seok;Bak, Sang-Min
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.120-125
    • /
    • 2008
  • The purpose of this case study is to find out current issue and improvement directions of the application of 3D and 4D to the construction project including building, highway and railway projects. For the study, the main functions of the 3D and 4D simulation of current system are analyzed and proposed improvement directions for 3D CAD utilization in 4D environment. Case studies of CAD application include land development for housing complex, highway project and express railway project.

  • PDF