• 제목/요약/키워드: 400 GE

검색결과 87건 처리시간 0.029초

Synthesis of Core/Shell Graphene/Semiconductor Nanostructures for Lithium Ion Battery Anodes

  • 신용승;장현식;임재영;임세윤;이종운;이재현;;허근;김태근;황성우;황동목
    • 한국진공학회:학술대회논문집
    • /
    • 한국진공학회 2013년도 제45회 하계 정기학술대회 초록집
    • /
    • pp.288-288
    • /
    • 2013
  • Lithium-ion battery (LIB) is one of the most important rechargeable battery and portable energy storage for the electric digital devices. In particular, study about the higher energy capacity and longer cycle life is intensively studied because of applications in mobile electronics and electric vehicles. Generally, the LIB's capacity can be improved by replacing anode materials with high capacitance. The graphite, common anode materials, has a good cyclability but shows limitations of capacity (~374 mAh/g). On the contrary, silicon (Si) and germanium(Ge), which is same group elements, are promising candidate for high-performance LIB electrodes because it has a higher theoretical specific capacity. (Si:4200 mAh/g, Ge:1600 mAh/g) However, it is well known that Si volume change by 400% upon full lithiation (lithium insertion into Si), which result in a mechanical pulverization and poor capacity retention during cycling. Therefore, variety of nanostructure group IV elements, including nanoparticles, nanowires, and hollow nanospheres, can be promising solution about the critical issues associated with the large volume change. However, the fundamental research about correlation between the composition and structure for LIB anode is not studied yet. Herein, we successfully synthesized various structure of nanowire such as Si-Ge, Ge-Carbon and Si-graphene core-shell types and analyzed the properties of LIB. Nanowires (NWs) were grown on stainless steel substrates using Au catalyst via VLS (Vapor Liquid Solid) mechanism. And, core-shell NWs were grown by VS (Vapor-Solid) process on the surface of NWs. In order to characterize it, we used FE-SEM, HR-TEM, and Raman spectroscopy. We measured battery property of various nanostructures for checking the capacity and cyclability by cell-tester.

  • PDF

DMIDR 장치의 재구성 알고리즘 별 성능 평가 (Performance Evaluation of Reconstruction Algorithms for DMIDR)

  • 곽인석;이혁;문승철
    • 핵의학기술
    • /
    • 제23권2호
    • /
    • pp.29-37
    • /
    • 2019
  • DMIDR (General Electric Healthcare, USA)은 GE 사(社)의 최신 장비로써 PSF (Point Spread Function reconstruction), TOF(Time of Flight)와 Q.Clear의 적용이 가능하다. 특히, Q.Clear는 보정 알고리즘으로써 복셀(voxel)단위 신호 잡음 제거로 기존 OSEM (Ordered Subset Expectation Maximization)의 한계를 넘어설 수 있다. 따라서 이러한 재구성 및 보정 알고리즘의 성능 평가를 통해 정확한 SUV를 구현하며, 병변 검출 능력에 도움이 되는 알고리즘의 조합을 확인하고자 하였다. H/B(Hot & Background) Ratio 2:1, 4:1, 8:1의 비율로 NEMA/IEC 2008 PET phantom을 제작하였다. DMIDR의 NEMA test protocol을 이용하여 영상 획득을 하였다. 재구성 조합은 (1) VPFX(VUE point FX(TOF)), (2) VPHD-S(VUE point HD+PSF), (3) VPFX-S(TOF+PSF), (4) QCHD-S-400(VUE point HD+Q.Clear(${\beta}-strength$ 400)+PSF), (5) QCFX-S-400(TOF+Q.Clear(${\beta}-strength$ 400)+PSF), (6) QCHD-S-50(VUE point HD+Q.Clear(${\beta}-strength$ 50)+PSF), (7) QCFX-S-50(TOF+Q.Clear(${\beta}-strength$ 50) + PSF)의 7 가지로 구성하였다. H/B Ratio 및 재구성 알고리즘 별로 측정된 결과를 이용하여 CR (Contrast Recovery)와 BV (Background Variability)을 구하였다. 또한, 각 조합의 count를 측정하여 SNR (Signal to Noise Ratio)과 RC(Recovery Coefficient)를 구하고 SUV (Standardized Uptake Value)를 측정하였다. 구의 크기가 가장 작은 10 mm와 13 mm에서는 VPFX-S, 17 mm 이상에서는 QCFX-S-50에서 가장 높은 CR 결과를 보였다. BV와 SNR의 비교에서는 QCFX-S-400과 QCHD-S-400에서 좋은 값을 보였다. SUV 측정 결과는 H/B ratio와 비례하여 증감하는 양상을 보였다. SUV에 대한 RC의 경우 H/B ratio와 반비례하는 양상을 보였으며, 재구성 알고리즘 중에서는 QCFX-S-50이 가장 높은 값을 보였다. 또한, Q.Clear에 ${\beta}-strength$ 400이 적용된 재구성 알고리즘들이 낮은 값 분포를 보였다. Q.Clear가 적용된 재구성 조합은 ${\beta}-strength$를 높이면 신호잡음이 억제되어 영상 품질면에서 우수한 결과를 보였고 ${\beta}-strength$를 낮추면 선예도가 증가하며, partial volume effect가 감소하여 기존의 재구성 조건에 비하여 높은 RC에 근거한 SUV 측정이 가능하였다. 이러한 진보된 알고리즘의 사용으로 보다 정확한 정량화와 미세병변 검출능력을 향상 시킬 수 있으나 상관 관계를 고려하여 목적에 맞는 최적화 과정이 필요할 것으로 사료된다.

PLS-II 진공시스템 1차 시운전

  • 박종도;하태균
    • 한국진공학회:학술대회논문집
    • /
    • 한국진공학회 2013년도 제44회 동계 정기학술대회 초록집
    • /
    • pp.241-241
    • /
    • 2013
  • PLS-II 저장링 진공시스템은 2011년 6월 설치 완료 후 2011년 7월부터 2012년 초 까지 1차 시운전을 마쳤다. PLS-II 저장링 진공시스템은 누적 전류 50 Ah 운전 후, 3 GeV, 400 mA 전자빔 운전 시 평균 진공도 $2{\times}10^{-9}$ mbar를 유지도록 설계되어 빔-기체 산란 수명을 20 시간 이상 확보하도록 설계하였다. 지금까지의 간략한 운전 이력과 진공시스템의 성능을 보고하고 최근 방사광 가속기에서 중요하게 취급하는 진공용기(특히, 빔전류 측정 진공용기)의 기계적 안정도, 변위 등과 BPM TE mode noise suppression 등을 보고하고자 한다.

  • PDF

AES-128 크립토 코어의 경량화 구현 (A Lightweight Implementation of AES-128 Crypto-Core)

  • 배기철;신경욱
    • 한국정보통신학회:학술대회논문집
    • /
    • 한국정보통신학회 2016년도 춘계학술대회
    • /
    • pp.171-173
    • /
    • 2016
  • 128-비트의 마스터 키를 지원하는 블록암호 AES-128을 IoT 보안에 적합하도록 경량화하여 구현하였다. 키 스케줄러와 라운드 블록을 8 비트 데이터 패스로 구현하고, 다양한 최적화 방법을 적용함으로써 하드웨어를 최소화시켰으며, 100 MHz 클록 주파수에서 4,400 GE의 작은 게이트로 구현되었다. Verilog HDL로 설계된 AES 크립토 코어를 Vertex5 XC5VSX50T FPGA 디바이스에 구현하여 올바로 동작함을 확인하였다.

  • PDF

PLS-II 저장링에 사용할 고진공펌프

  • 박종도
    • 한국진공학회:학술대회논문집
    • /
    • 한국진공학회 2010년도 제39회 하계학술대회 초록집
    • /
    • pp.44-44
    • /
    • 2010
  • 포항가속기연구소에서는 성능향상사업(PLS-II)를 수행하고 있다. 전자빔의 에너지는 2.5에서 3 GeV로, 빔전류는 200 mA에서 400 mA로 증가되는 반면 빔에미턴스는 약 1/3로 줄어든다. 저장링 진공시스템은 저장된 전자가 충분한 시간동안 저장되도록 $10^{-9}$ Torr 대의 진공도를 가져야 한다. 빔에너지와 전류가 늘어나기 때문에 기체부하도 약 4배 상승하므로 적절한 배기 시스템을 가지도록 설계되어야 한다. 본 논문에서는 저장링 Main pump로 사용할 조합펌프, Lumped NEG 펌프의 설계 과정과 시험결과 에 대하여 보고하고자 한다.

  • PDF

A study on application of high strength steel SM570 in bridge piers with stiffened box section under cyclic loading

  • Kang, Lan;Suzuki, Motoya;Ge, Hanbin
    • Steel and Composite Structures
    • /
    • 제26권5호
    • /
    • pp.583-594
    • /
    • 2018
  • Although a lot of experimental and analytical investigations have been carried out for steel bridge piers made of SS400 and SM490, the formulas available for SS400 and SM490 are not suitable for evaluating ultimate load and deformation capacities of steel bridge piers made of high strength steel (HSS) SM570. The effect of various parameters is investigated in this paper, including plate width-to-thickness ratio, column slenderness ratio and axial compression force ratio, on the ultimate load and deformation capacities of steel bridge box piers made of SM570 steel subjected to cyclic loading. The elasto-plastic behavior of the steel bridge piers under cyclic loads is simulated through plastic large deformation finite element analysis, in which a modified two-surface model (M2SM) including cyclic hardening is employed to trace the material nonlinearity. An extensive parametric study is conducted to study the influences of structural parameters on the ultimate load and deformation capacities. Based on these analytical investigations, new formulas for predicting ultimate load and deformation capacities of steel bridge piers made of SM570 are proposed. This study extends the ultimate load and deformation capacities evaluation of steel bridge piers from SS400, SM490 steels to SM570 steel, and provides some useful suggestions.

선택적 Si 확산을 이용한 저저항층을 갖는 이온주입 GaAs MESFET (Fabrication of ion implanted GaAs MESFET with Si selectively diffused low resistive layer)

  • 양전욱
    • 전자공학회논문지D
    • /
    • 제36D권3호
    • /
    • pp.41-47
    • /
    • 1999
  • SiN로부터 GaAs로 확산된 Si을 이용하여 소스와 드레인 영역에 고농도 Si 확산층을 갖는 GaAs MESFET를 제작하였다. 제작된 MESFET의 소스와 드레인 영역은 950°C, 30초의 열처리에 의해 Si 확산층이 표면에서부터 350Å두께로 형성되어 확산층이 없을 때 1000Ω/sq.정도였던 면저항이 400Ω/sq.로 내외로 감소하였다. 고농도로 확산된 Si은 AuGe/Ni/Au와 GaAs 기판 사이의 저항성 접촉 특성을 2.5×10\sub -6\Ω-cm\sup 2\로부터 1.5×10\sup -6\Ω-cm\sup 2\로 개선시켰다. 제작된 lum게이트 길이의 확산층을 갖는 MESFET는 최대 트랜스컨덕턴스가 260mS/mm 이었으며, 이득과 최소잡음지수는 12GHz에서 각각 8.5dB와 3.57dB를 나타내 같이 제작된 표면 확산 층이 없는 MESFET에 비해 1.3dB와 0.4dB가 향상되었다.

  • PDF

모형 가스터빈 연소기의 기초 연소특성에 대한 실험적 연구 (An Experimental Study of Combustion Characteristics in a Model Gas Turbine Combustor)

  • 이장수;김민기;박성순;윤영빈
    • 한국추진공학회:학술대회논문집
    • /
    • 한국추진공학회 2009년도 춘계학술대회 논문집
    • /
    • pp.263-266
    • /
    • 2009
  • 본 연구는 GE 7FA+e DLN 2.6 가스터빈 연소기를 축소 제작한 모형 가스터빈 연소기의 연소 동특성 및 연소불안정 현상을 알아보고 위해 진행되었다. 모형 연소기에 사용된 연료노즐은 1/3 크기로 상사하여 제작되었으며, 실제 연료노즐과 동일한 2단 스월러(swirl vane)를 가지고 있다. Plenum과 연소기의 형상은 실 가스터빈과 유사한 음향학적 특성을 가질수 있도록 설계되었다. 실험은 공기온도 $200{\sim}400^{\circ}C$, 대기압, 노즐출구 속도 $30{\sim}75\;m/s$, 당량비 $0.4{\sim}1.2$, 연소실 길이 $375{\sim}700\;mm$,에서 이루어졌으며, 그 결과 소염영역 근처의 저 당량비 영역과 당량비 1.1 이상인 연료 과농 상태에서 연소 불안정 현상이 관찰 되었다.

  • PDF

The Status and prospect of Pohang Synchrotron Light Source at PAL on its 25th Anniversary

  • 조무현
    • 한국진공학회:학술대회논문집
    • /
    • 한국진공학회 2013년도 제45회 하계 정기학술대회 초록집
    • /
    • pp.61.2-61.2
    • /
    • 2013
  • 우리나라 최초의 거대과학 장치인 포항방사광가속기(PLS)는 지난 16년(1994~2010) 동안 국내외 이용자에게 제3세대 방사광을 제공했다. 최초 2기의 빔라인을 시작으로 꾸준하게 빔라인 증설과 성능개선을 위해 노력해 왔다. 지속해서 늘어나는 방사광 이용자 수와 더욱더 좋은 수준의 방사광 요구에 부응하기 위하여 2009년부터 3년 동안 가속장치의 성능향상사업(PLS-II)을 마쳤다. PLS-II는 PLS 대비에너지와 빔전류는 3 GeV, 400 mA로 늘리는 반면 빔의 크기는 크게 줄이고 빔안정성을 개선한 고품질 X-선 방사광 발생장치이다. 2012년부터 16기의 삽입장치 빔라인을 포함한 30기의 빔라인을 가동하여 이용자 지원을 하고 있으며 초전도케비티 설치를 포함한 목표 성능의 확보에도 많은 노력을 기울이고 있다. 현재는 6 nm-rad의 빔에 미턴스, 3-GeV전자빔, 약 0.5 ${\mu}m-rms$ 빔안정도를 가진 200 mA Top-up 운전으로 빔을 제공 하고 있으며 2014년 말에는 저장전류 400 mA급의 PLS-II 목표치로 운전할 계획이다. 본 발표에서는 포항가속기의 25년 역사를 돌아보고 가속장치의 건설에 얽힌 이야기, 중요장치 그리고 운전과 빔제공에 관한 내용, 특히 핵심 운전가치인 빔안정성을 개선하고 유지하기 위한 노력을 빔운전 측면과 진공을 포함한 엔지지어링 측면에서 언급하고자 한다. PLS 건설부터 현재 운용 중인 30기의 빔라인에서 수행된 연구 성과의 통계에 대하여 훑어보고 X-선 산란과 광전자분광을 이용한 구조, 성분 및 물성분석, 그리고 이미징 등의 분야에서 나온 탁월한 연구 결과를 살펴본다. 앞으로 건설될 신규 빔라인과 빔라인의 향후 운영 방향을 소개한다. 마지막으로 지금 포항가속기연구소에서 건설 중인 제4세대 가속기(X-선 자유전자레이저) 프로젝트의 개요 및 건설 현황과 함께 앞으로 기대되는 새로운 과학에 대하여도 소개하고자 한다.

  • PDF

포항 20억 전자볼트 선형가속기 클라이스트론-모듈레이터 시스템의 성능 (KLYSTRON-MODULATOR SYSTEM PERFORMANCES FOR PLS 2-GeV LINAC)

  • 박상욱;박성수;이경태;오종석;조무현;남궁원
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1995년도 하계학술대회 논문집 C
    • /
    • pp.1365-1367
    • /
    • 1995
  • The PLS 2-GeV linac employs 11 units of high-power pulsed klystrons(80MW) as the main RF sources. The matching modulators of 200 MW(400kV, 500 A) can provide a flat-top pulse width of 4.4 ${\mu}s$ with a maximum pulse repetition rate of 120 Hz at the full power level. For a good stability of electron beams, the pulse-to-pulse flat-top voltage variation of a modulator requires less than 0.5%. In order to achieve this goal, we stabilized high voltage charging power supplies within 1% by a phase controlled SCR voltage regulator. In addition, we employed ac/dc feedback together with a resistive De-Q'ing system to achieve far less than 0.5% variation of the PFN charging voltage. This paper presents the main feature of the klystron-modulator system and the characteristics of the pulsed high-power RF system performance during the beam injection operation for the Pohang Light Source commissioning.

  • PDF