• Title/Summary/Keyword: 3D drawings

Search Result 207, Processing Time 0.024 seconds

A Study on 3D Data Model Development by Normalizing and Method of its Effective Use - Focused on Building Interior Construction - (정규화를 통한 3차원 데이터 모델 구축 및 활용성 향상 방안 연구 -건축 마감 공사 중심으로 -)

  • Lee, Myoung-Hoon;Ham, Nam-Hyuk;Kim, Ju-Hyung;Kim, Jae-Jun
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.10 no.3
    • /
    • pp.11-18
    • /
    • 2010
  • Cost estimation through fast and correct quantity take offs are crucial in the process of construction project. The existing methods for cost estimation are mainly based on 2D-based drawings and the estimation result tends to be different according to the estimator's experience, the quality and quantity of used information and estimation time. To solve these problems, the domestic construction industry have recently tried to use the data extracted from 3D data modeling based on BIM(Building Information Modeling) in order to achieve more accurate and objective cost estimation. However it tends to increase dramatically the quantity of information that can be used in cost estimation by estimators. Therefore in order to achieve quality information data from 3D data modeling, the characteristics of the project should be reflected on the 3D model and it is most important to extract information only for cost estimation from the whole 3D model fast and accurately. Thus this study aims to propose the 3D modeling method through Data Normalization which maximizes the usability of 3D Data modeling in cost estimation process.

A Comparative Analysis of the Design Efficiency of Transformable Wedding Dresses Using 3D Programs -Focusing on Dress Design for Small Weddings- (3D 프로그램을 활용한 트랜스포머블 웨딩드레스 디자인 개발 및 효율성 비교연구 -스몰웨딩용 웨딩드레스 디자인을 중심으로-)

  • Bae, Soojeong;Yuan, Xinyi
    • Journal of the Korean Society of Clothing and Textiles
    • /
    • v.45 no.3
    • /
    • pp.439-452
    • /
    • 2021
  • The purpose of this thesis is to compare the efficiency of 3D digital design technology with traditional hand-drawn designs of a transformable dress for a small wedding. After reviewing the literature, this empirical study analyzed the tendencies of small wedding dress design, concluding that a transformable dress for a small wedding consists of a bodice, skirt, and outer skirt or gown with train, each of which has five possible designs, resulting in 15 virtual items within the 3D program. The 3D program provides the benefit of easy design development as well as reduced costs and design time. Specifically, the random combination of 15 items with layers in the 3D program produced 150 different styles in 5 hours, while hand-drawing 150 dresses took 50 hours. Moreover, the 3D program does not need any material, but 150 physical drawings required a sketchbook, pencil, eraser, and marker, total cost 31,100 won. Additionally, the 3D whole-body scan helps the bride decide which design she prefers through virtual try-ons. Eventually, the 3D program could help a bride decide what she prefers and produce it with virtual simulation, resulting in reduced time and costs.

A Study on the Method for Reconstructing the Shell Plates Surface from Shell Template Offset Drawing (Shell Template Offset 도면을 활용한 선체 곡판 형상 복원 방법에 관한 연구)

  • Hwang, Inhyuck;Son, Seunghyeok
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.56 no.1
    • /
    • pp.66-74
    • /
    • 2019
  • In the field of shipbuilding design, the use of 3D CAD is becoming commonplace, and most of the large shipyards are conducting 3D design. However at the production site, workers are still working on 2D drawings rather than 3D models. This tendency is even worse in small-scale shipyards and block manufacturing shops. Particularly, in a manufacturing shop that is engaged in the outsourcing of blocks, it may not be possible to provide 3D model. However, the demand for 3D models in the production field is steadily increasing. Therefore, it would be helpful if 3D model could be generated from a 2D drawing. In this paper, we propose a method to extract template and unfolded surface shape information from shell template offset drawing using computer vision technology. Also a 3D surface model was reconstructed and visualized from the extracted information. The result of this study is thought to be helpful in the work environment where 3D model information can not be obtained.

Development of an Verification System for Enhancing BIM Design Base on Usability (활용성을 고려한 BIM 설계 오류 검증시스템 개발)

  • Yang, Dong-Suk
    • Land and Housing Review
    • /
    • v.8 no.1
    • /
    • pp.23-29
    • /
    • 2017
  • The BIM design is expected to expand to the domestic and overseas construction industries, depending on the effect of construction productivity and quality improvement. However, with the obligation of Public Procurement Service to design the BIM design, it includes a design error and the problem of utilization of 3D design by choosing a simple 2D to 3D remodelling method that can not be modelled in 3D modeling or use of the construction and maintenance phases. The results reviewed by BIM design results were largely underutilized and were not even performed with the verification of the error. In order to resolve this, one must develop the check system that secures the quality of BIM design and ensure that the reliability of BIM results are available. In this study, it is designed to develop a program that can automatically verify the design of the BIM design results such as violation of the rules of the BIM design, design flaws, and improve the usability of the BIM design. In particular, this programs were developed not only to identify programmes that were not commercially available, but also to validate drawings in low-light computer environments. The developed program(LH-BIM) store the information of attribute extracted from the Revit file(ArchiCAD, IFC file included) in the integrated DB. This provides the ability to freely lookup the features and properties of drawings delivered exclusively by the LH-BIM Program without using the Revit tools. By doing so, it was possible to resolve the difficulties of using traditional commercial programs and to ensure that they operate only with traditional PC performance. Further, the results of the various BIM software can be readily validated, which can be solved the conversion process error of IFC in the case of SMC. Additionally, the developed program has the ability to automatically check the error and design criteria of the drawings, as well as the ability to calculate the area estimation. These functions allow businesses to apply simple and easy tasks to operate tasks of BIM modelling. The developed system(LH-BIM) carried out a verification test by reviewing the review of the BIM Design model of the Korea Land & Housing Corporation. It is hoped that the verification system will not only be able to achieve the Quality of BIM design, but also contribute to the expansion of BIM and future construction BIM.

How to automatically extract 2D deliverables from BIM?

  • Kim, Yije;Chin, Sangyoon
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1253-1253
    • /
    • 2022
  • Although the construction industry is changing from a 2D-based to a 3D BIM-based management process, 2D drawings are still used as standards for permits and construction. For this reason, 2D deliverables extracted from 3D BIM are one of the essential achievements of BIM projects. However, due to technical and institutional problems that exist in practice, the process of extracting 2D deliverables from BIM requires additional work beyond generating 3D BIM models. In addition, the consistency of data between 3D BIM models and 2D deliverables is low, which is a major factor hindering work productivity in practice. To solve this problem, it is necessary to build BIM data that meets information requirements (IRs) for extracting 2D deliverables to minimize the amount of work of users and maximize the utilization of BIM data. However, despite this, the additional work that occurs in the BIM process for drawing creation is still a burden on BIM users. To solve this problem, the purpose of this study is to increase the productivity of the BIM process by automating the process of extracting 2D deliverables from BIM and securing data consistency between the BIM model and 2D deliverables. For this, an expert interview was conducted, and the requirements for automation of the process of extracting 2D deliverables from BIM were analyzed. Based on the requirements, the types of drawings and drawing expression elements that require automation of drawing generation in the design development stage were derived. Finally, the method for developing automation technology targeting elements that require automation was classified and analyzed, and the process for automatically extracting BIM-based 2D deliverables through templates and rule-based automation modules were derived. At this time, the automation module was developed as an add-on to Revit software, a representative BIM authoring tool, and 120 rule-based automation rulesets, and the combinations of these rulesets were used to automatically generate 2D deliverables from BIM. Through this, it was possible to automatically create about 80% of drawing expression elements, and it was possible to simplify the user's work process compared to the existing work. Through the automation process proposed in this study, it is expected that the productivity of extracting 2D deliverables from BIM will increase, thereby increasing the practical value of BIM utilization.

  • PDF

Oil Storage Tank Inspection using 3D Laser Scanner (3D 레이저스캐너를 활용한 유류 저장탱크의 검사)

  • Park, Joon-Kyu;Lee, Keun-Wang
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.12
    • /
    • pp.867-872
    • /
    • 2020
  • Oil storage tanks are a major structure in chemical industrial complexes. Damage to the structure due to natural disasters or poor management can cause additional damage, such as leakage of chemicals, fire, and explosion, so it is essential to understand the deformation. In this study, data on oil storage tanks were acquired using a 3D laser scanner, and various analyzes were performed for storage tank management by comparing them with design data. Modeling of the oil storage tank was performed using the data and design drawings acquired by a 3D laser scanner. An inspection of the oil storage tank was effectively performed by overlapping. In addition, cross-sectional and exploded views of the deformation were produced to generate visible data on the deformation of the facility, and it was suggested that the oil storage tank had a maximum deformation of -7.16mm through quantitative analysis. Data that can be used for additional work was obtained by producing drawings to be precisely inspected for areas with large deformation. In the future, an inspection of oil storage tanks using 3D laser scanners is quantitative and visible data on oil storage tank deformation. This will greatly improve the efficiency of facility management by rebuilding it.

Introducing and Surveying 4D Models in AEC Industry (4D 공정관리시스템의 개발현황 조사연구)

  • Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.137-142
    • /
    • 2001
  • The traditional schedule management system provides project manager with analysis reports, such as progress control, earned value management and resource management, including schedule chart. However, the reports and functions in the traditional system are still limited in 2D concept. Recently, the scheduling method is using 4D concept that time of construction schedule is linked to space of drawings. This study presents the limitation of those systems and an improved method for developing 4D system through the comparative analysis of representative 4D systems that are developed up to date.

  • PDF

Construction of a Campus Facilities Management System Using Three Dimensional GIS (3차원 GIS에 의한 캠퍼스 시설물 관리시스템 구축)

  • Lee, Jin-Duk;Kim, Ki-Ho;Hur, Chan-Hoe
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2010.04a
    • /
    • pp.367-369
    • /
    • 2010
  • The purpose of this study is to develop a campus facility management system, construct 3D graphic data and attribute data of facilities on the Kumoh National Institute of Technology and then verificate the developed system's practicability. Utilized the existing campus facility data from the existing drawings, images, cadastre records and so forth, 3D position data of underground facilities surveyed with a total station and high-resolution aerial photos, 3D realistic models were produced by means of a XD2D software and a XDWORLD Builder Professional software of GIS engines. We intend to embody not only campus guide service in virtual reality space but visualization of 3D virtual campus by providing 2D and 3D data to web space using XDWORLD server soon after. It is expected that the campus facility management system is able to contribute to the integrated management of 3D facility data service, the support of prompt decision-making related to spatial affairs, the work simplification through data holding in common between the members of the staff and so forth.

  • PDF

Application of the Public Buildings for the Korean-style houses in the availability of R&D technologies - Focused on Drawings of Agricultural Education and Experience Center in Na-Ju, Korea

  • Kim, Young-Hoon;Peck, Yoo-Jung;Park, Joon-Young;Chun, Kuk-Chun
    • KIEAE Journal
    • /
    • v.16 no.3
    • /
    • pp.13-23
    • /
    • 2016
  • Purpose: In this paper, based on the design drawings of Naju Agricultural Technology Learning Center by focusing on features of New-Hanok applied technology in the design and construction process of New-Hanok Type Public buildings by looking at the characteristics of the whole building is planned to be presented in the future development direction and value of public architecture applied to public buildings. Method: we first review the Phase 1 study results of technology development and application technology to look at the type and characteristics of the technologies applied in Naju Hanok Experience Agriculture Learning Center. As construction designs through the consultation suggestions reflect changes were seven times. By analyzing the changes in the basic design and conduct design in the process were organized for the new technologies applied and whether the application of existing technology hanok. Result: (1) Complements the shortcomings of technology and R & D to offer an alternative to the reinforcement was omitted modify the construction method or irrational process. (2) Implementation of a technique aiming to apply new-hanok workability and economic efficiency is based on a combination of the modern construction techniques and materials. (3) The use of modern materials to the extent that can assist in the purpose and function of the building are to be accommodated. (4) There is sufficient historical study and design plan for establishing identity is necessary in order to reflect the history and tradition of new-hanok public buildings.

Estimating System for Concrete Bridge using 3D Bridge Information Models (3차원 교량정보모델에 기반한 콘크리트 교량의 견적 시스템)

  • Shim, Chang-Su;Kim, Deok-Won;Lee, Kwang-Myong
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2009.05a
    • /
    • pp.43-44
    • /
    • 2009
  • 3D bridge information models for a concrete box-girder bridge were built and a typical application example for the estimation linked with the 3D models was proposed. 3D geometry objects with PBS (product breakdown structure) were constructed using standard classification codes and 2D drawings. Information on the amount of materials according to the classification codes was utilized for the estimation system. A process for the estimation of concrete and rebars was developed and verified through the pilot test. Optimization of rebar fabrication was suggested as an additional function and was utilized for the cost reduction and standard fabrication.

  • PDF