Journal of The Korean Digital Architecture Interior Association
/
v.10
no.3
/
pp.11-18
/
2010
Cost estimation through fast and correct quantity take offs are crucial in the process of construction project. The existing methods for cost estimation are mainly based on 2D-based drawings and the estimation result tends to be different according to the estimator's experience, the quality and quantity of used information and estimation time. To solve these problems, the domestic construction industry have recently tried to use the data extracted from 3D data modeling based on BIM(Building Information Modeling) in order to achieve more accurate and objective cost estimation. However it tends to increase dramatically the quantity of information that can be used in cost estimation by estimators. Therefore in order to achieve quality information data from 3D data modeling, the characteristics of the project should be reflected on the 3D model and it is most important to extract information only for cost estimation from the whole 3D model fast and accurately. Thus this study aims to propose the 3D modeling method through Data Normalization which maximizes the usability of 3D Data modeling in cost estimation process.
Journal of the Korean Society of Clothing and Textiles
/
v.45
no.3
/
pp.439-452
/
2021
The purpose of this thesis is to compare the efficiency of 3D digital design technology with traditional hand-drawn designs of a transformable dress for a small wedding. After reviewing the literature, this empirical study analyzed the tendencies of small wedding dress design, concluding that a transformable dress for a small wedding consists of a bodice, skirt, and outer skirt or gown with train, each of which has five possible designs, resulting in 15 virtual items within the 3D program. The 3D program provides the benefit of easy design development as well as reduced costs and design time. Specifically, the random combination of 15 items with layers in the 3D program produced 150 different styles in 5 hours, while hand-drawing 150 dresses took 50 hours. Moreover, the 3D program does not need any material, but 150 physical drawings required a sketchbook, pencil, eraser, and marker, total cost 31,100 won. Additionally, the 3D whole-body scan helps the bride decide which design she prefers through virtual try-ons. Eventually, the 3D program could help a bride decide what she prefers and produce it with virtual simulation, resulting in reduced time and costs.
Journal of the Society of Naval Architects of Korea
/
v.56
no.1
/
pp.66-74
/
2019
In the field of shipbuilding design, the use of 3D CAD is becoming commonplace, and most of the large shipyards are conducting 3D design. However at the production site, workers are still working on 2D drawings rather than 3D models. This tendency is even worse in small-scale shipyards and block manufacturing shops. Particularly, in a manufacturing shop that is engaged in the outsourcing of blocks, it may not be possible to provide 3D model. However, the demand for 3D models in the production field is steadily increasing. Therefore, it would be helpful if 3D model could be generated from a 2D drawing. In this paper, we propose a method to extract template and unfolded surface shape information from shell template offset drawing using computer vision technology. Also a 3D surface model was reconstructed and visualized from the extracted information. The result of this study is thought to be helpful in the work environment where 3D model information can not be obtained.
The BIM design is expected to expand to the domestic and overseas construction industries, depending on the effect of construction productivity and quality improvement. However, with the obligation of Public Procurement Service to design the BIM design, it includes a design error and the problem of utilization of 3D design by choosing a simple 2D to 3D remodelling method that can not be modelled in 3D modeling or use of the construction and maintenance phases. The results reviewed by BIM design results were largely underutilized and were not even performed with the verification of the error. In order to resolve this, one must develop the check system that secures the quality of BIM design and ensure that the reliability of BIM results are available. In this study, it is designed to develop a program that can automatically verify the design of the BIM design results such as violation of the rules of the BIM design, design flaws, and improve the usability of the BIM design. In particular, this programs were developed not only to identify programmes that were not commercially available, but also to validate drawings in low-light computer environments. The developed program(LH-BIM) store the information of attribute extracted from the Revit file(ArchiCAD, IFC file included) in the integrated DB. This provides the ability to freely lookup the features and properties of drawings delivered exclusively by the LH-BIM Program without using the Revit tools. By doing so, it was possible to resolve the difficulties of using traditional commercial programs and to ensure that they operate only with traditional PC performance. Further, the results of the various BIM software can be readily validated, which can be solved the conversion process error of IFC in the case of SMC. Additionally, the developed program has the ability to automatically check the error and design criteria of the drawings, as well as the ability to calculate the area estimation. These functions allow businesses to apply simple and easy tasks to operate tasks of BIM modelling. The developed system(LH-BIM) carried out a verification test by reviewing the review of the BIM Design model of the Korea Land & Housing Corporation. It is hoped that the verification system will not only be able to achieve the Quality of BIM design, but also contribute to the expansion of BIM and future construction BIM.
International conference on construction engineering and project management
/
2022.06a
/
pp.1253-1253
/
2022
Although the construction industry is changing from a 2D-based to a 3D BIM-based management process, 2D drawings are still used as standards for permits and construction. For this reason, 2D deliverables extracted from 3D BIM are one of the essential achievements of BIM projects. However, due to technical and institutional problems that exist in practice, the process of extracting 2D deliverables from BIM requires additional work beyond generating 3D BIM models. In addition, the consistency of data between 3D BIM models and 2D deliverables is low, which is a major factor hindering work productivity in practice. To solve this problem, it is necessary to build BIM data that meets information requirements (IRs) for extracting 2D deliverables to minimize the amount of work of users and maximize the utilization of BIM data. However, despite this, the additional work that occurs in the BIM process for drawing creation is still a burden on BIM users. To solve this problem, the purpose of this study is to increase the productivity of the BIM process by automating the process of extracting 2D deliverables from BIM and securing data consistency between the BIM model and 2D deliverables. For this, an expert interview was conducted, and the requirements for automation of the process of extracting 2D deliverables from BIM were analyzed. Based on the requirements, the types of drawings and drawing expression elements that require automation of drawing generation in the design development stage were derived. Finally, the method for developing automation technology targeting elements that require automation was classified and analyzed, and the process for automatically extracting BIM-based 2D deliverables through templates and rule-based automation modules were derived. At this time, the automation module was developed as an add-on to Revit software, a representative BIM authoring tool, and 120 rule-based automation rulesets, and the combinations of these rulesets were used to automatically generate 2D deliverables from BIM. Through this, it was possible to automatically create about 80% of drawing expression elements, and it was possible to simplify the user's work process compared to the existing work. Through the automation process proposed in this study, it is expected that the productivity of extracting 2D deliverables from BIM will increase, thereby increasing the practical value of BIM utilization.
Journal of the Korea Academia-Industrial cooperation Society
/
v.21
no.12
/
pp.867-872
/
2020
Oil storage tanks are a major structure in chemical industrial complexes. Damage to the structure due to natural disasters or poor management can cause additional damage, such as leakage of chemicals, fire, and explosion, so it is essential to understand the deformation. In this study, data on oil storage tanks were acquired using a 3D laser scanner, and various analyzes were performed for storage tank management by comparing them with design data. Modeling of the oil storage tank was performed using the data and design drawings acquired by a 3D laser scanner. An inspection of the oil storage tank was effectively performed by overlapping. In addition, cross-sectional and exploded views of the deformation were produced to generate visible data on the deformation of the facility, and it was suggested that the oil storage tank had a maximum deformation of -7.16mm through quantitative analysis. Data that can be used for additional work was obtained by producing drawings to be precisely inspected for areas with large deformation. In the future, an inspection of oil storage tanks using 3D laser scanners is quantitative and visible data on oil storage tank deformation. This will greatly improve the efficiency of facility management by rebuilding it.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.137-142
/
2001
The traditional schedule management system provides project manager with analysis reports, such as progress control, earned value management and resource management, including schedule chart. However, the reports and functions in the traditional system are still limited in 2D concept. Recently, the scheduling method is using 4D concept that time of construction schedule is linked to space of drawings. This study presents the limitation of those systems and an improved method for developing 4D system through the comparative analysis of representative 4D systems that are developed up to date.
Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
/
2010.04a
/
pp.367-369
/
2010
The purpose of this study is to develop a campus facility management system, construct 3D graphic data and attribute data of facilities on the Kumoh National Institute of Technology and then verificate the developed system's practicability. Utilized the existing campus facility data from the existing drawings, images, cadastre records and so forth, 3D position data of underground facilities surveyed with a total station and high-resolution aerial photos, 3D realistic models were produced by means of a XD2D software and a XDWORLD Builder Professional software of GIS engines. We intend to embody not only campus guide service in virtual reality space but visualization of 3D virtual campus by providing 2D and 3D data to web space using XDWORLD server soon after. It is expected that the campus facility management system is able to contribute to the integrated management of 3D facility data service, the support of prompt decision-making related to spatial affairs, the work simplification through data holding in common between the members of the staff and so forth.
Kim, Young-Hoon;Peck, Yoo-Jung;Park, Joon-Young;Chun, Kuk-Chun
KIEAE Journal
/
v.16
no.3
/
pp.13-23
/
2016
Purpose: In this paper, based on the design drawings of Naju Agricultural Technology Learning Center by focusing on features of New-Hanok applied technology in the design and construction process of New-Hanok Type Public buildings by looking at the characteristics of the whole building is planned to be presented in the future development direction and value of public architecture applied to public buildings. Method: we first review the Phase 1 study results of technology development and application technology to look at the type and characteristics of the technologies applied in Naju Hanok Experience Agriculture Learning Center. As construction designs through the consultation suggestions reflect changes were seven times. By analyzing the changes in the basic design and conduct design in the process were organized for the new technologies applied and whether the application of existing technology hanok. Result: (1) Complements the shortcomings of technology and R & D to offer an alternative to the reinforcement was omitted modify the construction method or irrational process. (2) Implementation of a technique aiming to apply new-hanok workability and economic efficiency is based on a combination of the modern construction techniques and materials. (3) The use of modern materials to the extent that can assist in the purpose and function of the building are to be accommodated. (4) There is sufficient historical study and design plan for establishing identity is necessary in order to reflect the history and tradition of new-hanok public buildings.
Proceedings of the Korea Concrete Institute Conference
/
2009.05a
/
pp.43-44
/
2009
3D bridge information models for a concrete box-girder bridge were built and a typical application example for the estimation linked with the 3D models was proposed. 3D geometry objects with PBS (product breakdown structure) were constructed using standard classification codes and 2D drawings. Information on the amount of materials according to the classification codes was utilized for the estimation system. A process for the estimation of concrete and rebars was developed and verified through the pilot test. Optimization of rebar fabrication was suggested as an additional function and was utilized for the cost reduction and standard fabrication.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.