• Title/Summary/Keyword: 3D drawings

Search Result 207, Processing Time 0.022 seconds

Effects of Mold Precision in Micromini Cellphone Optical Systems (초소형 휴대폰 광학계의 금형 정밀도가 광학성능에 미치는 영향)

  • Ye, In-Soo;Cheong, Seon-Hwan;Choi, Seong-Dae;Hyun, Dong-Hoon
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.19 no.5
    • /
    • pp.660-666
    • /
    • 2010
  • In cellphone optical systems, a tiny difference of manufacturing has a strong influence on camera lenses. This study aims to find out the worst result by tolerances come from all parts in optical performance. First, 3D Measure Instrument, Roundness Measure Instrument, and Wavelength Measure Instrument were used for greater precision by making and measuring the parts to see how different from the drawings. It was confirmed that even narrow tolerances could result in defects by assembling. Tolerances in assembly should be concerned as those in parts through the research.

Integrated SolidWorks & Simscape Platform for the Model-Based Control Algorithms of Hydraulic Manipulators

  • Ahn, Doo Sung;Lee, Ill Yeong;Kim, Hyun Ho
    • Journal of Drive and Control
    • /
    • v.12 no.4
    • /
    • pp.41-47
    • /
    • 2015
  • Hydraulic manipulators have been widely used in many different fields due to their high force/torque to inertia ratio. The increased speed of hydraulic manipulators requires solutions to problems ranging from mechanical design to the need to determine a robot model suitable for model-based control. As a solution, this paper presents the integration of SolidWorks with Simscape for designing and controlling hydraulic manipulators. The integration provides a platform for the rapid control prototyping of a hydraulic robot without the need to build actual prototypes. The mechanical drawings of a manipulator are first created using Solidworks and are then imported into Simscape, where the manipulator is represented by connected block diagrams based on the principle of physical modeling. Simulation examples for a 3D manipulator made by KNR SYSTEM INC are verified to show the effectiveness of the presented platform.

Visual Arts Development in 4- to 6-year-old Children (4-6세 아동의 미술 표현 발달)

  • Choi, Young-Ok;Lee, Young
    • Korean Journal of Child Studies
    • /
    • v.21 no.2
    • /
    • pp.171-188
    • /
    • 2000
  • The level of representation, exploration and artistry by age and sex was examined in twenty children in each of 4-, 5-, and 6-year old groups attending an early education facility in Pundang City, Kyong'gi Province. Evaluation was by the scoring system used in the Project Spetrum(Krechevsky, 1994) with children's drawings of an animal, person, imaginary animal and 3D work with clay. Data were analyzed by 2-way ANOVA and Duncan test. The level of representation was lower than exploration and artistry in the 4-year-old groups. Level of artistry was lower than representation and exploration in the 5-and 6-year-old groups. The older children and girls showed higher scores than the younger children and boys in representation and exploration. There were differences between 4-and 5-year old children in artistry development.

  • PDF

Flow and Heat Transfer Analysis of Reactor Coolant Pump in Transient Conditions (원자로 냉각재 펌프의 과도 상태의 유동 및 열전달 해석 연구)

  • Hur, N.;Kim, S.;Yoo, K.-P.;Kim, S. T.
    • 유체기계공업학회:학술대회논문집
    • /
    • 1999.12a
    • /
    • pp.245-251
    • /
    • 1999
  • The structural analysis of a reactor coolant pump(RCP) of a nuclear power plant is very important for the safety assessment of the plant. Accurate boundary conditions for the heat transfer coefficient are required for reliable thermal stress analysis of the pump casing, especially in transient operations of the pump since the coolant properties are largely dependent on operational conditions. In the present study, a 3D mixed flow type coolant pump was modeled from the RCP drawings and analyzed in the steady state and number of transient flow conditions by using a commercial code STAR-CD. From the result of the computation, it is seem that the average heat transfer coefficients for the cases considered are found to be the suggested values of the manufacturer, Westinghouse Energy System. The unevenness in local heat transfer coefficients, however, is found to be considerable so that the use of average heat transfer coefficients in all boundaries might not give reliable thermal stresses.

  • PDF

A Study on the Reduction Plan About Prefabricated Wall Construction Error Rates for BIM-based Modular Construction (BIM기반 모듈러 건축의 조립식 벽체 시공 오차율 저감방안에 대한 연구)

  • Suh, Bong-Gyo;Bae, Seong-Jae;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.213-214
    • /
    • 2013
  • Recently, modular construction has been begun to introduce actively for improvment of productivity in the construction industry. By the way, the construction technology is being IT through BIM. This is why modular construction needs BIM technology. In this study, we analyze the problems in the current modular construction at factory production stage. The way to extract 3D shop drawings using BIM is suggested to solve this problem.

  • PDF

BIM-based Property Management by Linking Maintenance with Financial Data for Commercial Building Projects

  • Shin, Hyeonju;Cha, Heesung
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.418-425
    • /
    • 2022
  • For a commercial building, property managers play an important role in maximizing the benefit by reducing cost and increasing revenue in the operation and maintenance phase of the building. However, most of property managers are spending their time in monitoring facility managers who have little impact on cost reduction and maximization of operating profit. The industry practitioners have difficutlty in increasing the efficiency of thier work due to this work environment. In addition, both property managers(PMr) and facility managers(FMr) are dependent on the paper drawings and manuals, which can worsen the inefficiency and human errors are inevitable. This study aims to contribute to improvement of the current practice by developing a novel algorithm that autmatically links the facility information with 3D model, which can provide an efficient property management for commercial buildings.

  • PDF

RISK ASSESSMENT USING BIM BASED SAFETY MANAGEMENT SYSTEM

  • Hongseob Ahn;Hyunjoo Kim;Wooyoung Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.107-110
    • /
    • 2011
  • The key role in safety management is to identify any possible hazard before it occurs by identifying any possible risk factors which are critical to risk assessment. This planning/assessment process is considered to be tedious and requires a lot of attention due to the following reasons: firstly, falsework (temporary structures) in construction projects is fundamentally important. However, the installation and dismantling of those facilities are one of the high risk activities in the job sites. Secondly, temporary facilities are generally not clearly delineated on the building drawings. It is our strong belief that safety tools have to be simple and convenient enough for the jobsite people to manage them easily and be flexible for any occasions to be occurred at various degrees. In order to develop the safety assessment system, this research utilizes the BIM technology and collects important information by importing data from BIM models and use it in the planning stage.

  • PDF

Basic Design of 40ft Class Pleasure Boat based on Digital Mock-up (디지털 목업 모델 기반 40ft 급 알루미늄 레저보트 설계)

  • Oh, Dae-Kyun;Lee, Kyung-Woo;Lee, Chang-Woo
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.17 no.3
    • /
    • pp.283-289
    • /
    • 2011
  • As leisure boats become large-scaled and high value-added, their design requirements gradually get more complicated and accordingly their manufacturing processes get more complicated than those of existing ones. Leisure boat builders overseas make efforts to overcome this circumstance by establishing a 3-D model-based design system which is based on the concept of PLM. On the other hand, Korean shipbuilders still remain in the development process of traditional leisure boats which are mainly based on 2-D drawings. There have been some efforts made to have the 3-D model-based design system; however, they belong to a very early stage. This study carried out initial research to apply DMU technology to the development process of leisure boats. It established the design process based on a DMU model and proved its usefulness through a case study on the design of 40-ft class aluminum leisure boats.

A Study on the Generation of the Production Material Information of a Building Block and the Simulation of the Block Erection (선체 블록의 물량 정보 생성 및 블록 탑재 시뮬레이션에 관한 연구)

  • Lee K.Y.;Roh M.I.
    • Korean Journal of Computational Design and Engineering
    • /
    • v.11 no.2
    • /
    • pp.115-127
    • /
    • 2006
  • At the initial design stage, the generation process of the production material information of a building block and the simulation process of the block erection, which are required to perform the production planning and scheduling, have been manually performed by using 2D drawings, data of parent ships, and design experiences. To make these processes automatic, the accurate generation method of the production material information and the convenient simulation method of the block erection using the 3D CAD model, which was generated from the initial hull structural design system early developed by us, were proposed in this study. For this, a 3D CAD model for a whole hull structure was generated first, and the block division method for dividing the 3D CAD model into several building blocks was proposed. The generation method of the production material information for calculating the weight, center of gravity, painting area, joint length, etc. of a building block was proposed as well. Moreover, the simulation method of the block erection was proposed. Finally, to evaluate the efficiency of the proposed methods for the generation of the production material information and the simulation of the block erection, these methods were applied to corresponding processes of a deadweight 300,000 ton VLCC (Very Large Crude oil Carrier). As a result, it was shown that the production material information of a building block can be accurately generated and the block erection can be conveniently simulated in the initial design stage.

3D Modeling of Automobile Part Using Pattern Scanner and Efficiency Analysis (패턴스캐너를 이용한 자동차부품의 3차원모델링 및 효용성분석)

  • Han Seung-Hee
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.24 no.1
    • /
    • pp.1-8
    • /
    • 2006
  • Effective three dimensional modeling becomes essential in a wide range of drawings, such as construction, machinery and design. In particular, it has been developed as the tool enabling reverse design. Three dimensional modeling requires rapidity, accuracy and tangibility. Data acquisition methods for modeling including contact type coordinate measurement machine, LASER scanner, pattern scanner and digital photogrammetry. In this study, we try to analyze modeling techniques as well as introduce three dimensional modeling using pattern scanner. In addition, this study conducts three dimensional modeling using OPTO-Top pattern scanner with distinguished accuracy and rapidity, and then compare efficiency with digital photogrammetry. And, this study attempts to form environment that enables to turn around models on web in three dimensional ways.