• Title/Summary/Keyword: 3D building model

Search Result 699, Processing Time 0.029 seconds

Derivation of System Requirements and Scenario for Smart Bridge Facility Management System Development (스마트 교량 관리시스템 개발을 위한 요구사항 및 활용 시나리오 도출)

  • Hong, Sungchul;Kang, Taewook;Hong, Changhee;Moon, Hyounseok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.11
    • /
    • pp.7902-7909
    • /
    • 2015
  • The needs for smart city management technology has been increased for efficiently managing huge and complex social infrastructures. Thus, this research introduces smart bridge facility management system based on sensor and BIM technologies so that the inadequacy of current facility maintenance system and the limitations of data objectivity, consistency and expandability can be improved. For which, current trends on sensor and BIM technologies and standard information system were investigated to derive system develop requirements, and a scenario was suggested to discuss how to utilize the suggested system. Research outcomes are expected to be utilized as a preliminary research for developing the real application framework for bridge facility management.

Enhancement of BIM Modeling Automation Algorithm for Linear-Based Tunnel Infrastructure and Development of BIM Modeling Automation System (선형기반 터널 인프라 구조물의 BIM 모델링 자동화 알고리즘 개선 및 BIM 모델링 자동화 시스템 개발)

  • Kim, Yun-Ok;Kim, Ji-Young; Kim, Tae-Min;Moon, So-Yeong
    • Journal of KIBIM
    • /
    • v.13 no.3
    • /
    • pp.1-11
    • /
    • 2023
  • In order to use BIM as a tool for improving the productivity and quality of products in the construction industry, a BIM model must be created from the design stage first. Infrastructure structures such as bridges and tunnels are mainly created based on three-dimensional alignment in the generation of BIM models. Especially, generation of BIM models based on three-dimensional linearity has high task difficulty and algorithms for automating BIM modeling for railway infra structures have been suggested in previous studies. This study improved the BIM modeling automation algorithm of railway infrastructures and developed a system based on the algorithm so that it can be easily used by ordinary users. The system was built as an add-in system of Autodesk's Revit. As an improvement first, it is possible to arrange different libraries for each pattern, enabling various uses. In addition, it can be created models of several members with a single process and the system can automatically places structures that are added periodically, such as Rock Bolt and Fore Polling. Finally, 3D length information and volume for each pattern are automatically calculated for more accurate 3D-based volume calculation. This study contributes to increasing user accessibility by building a BIM modeling automation algorithm into a system. The system is expected to improve the efficiency of BIM modeling creation of linear-based infra structures, including railway infrastructure.

A Study on the Deformation of O.D 245mm Off-shore Plant Pipe by Induction Bending (고주파 벤딩을 통한 직경 245mm 해양플랜트 배관의 변형에 관한 연구)

  • Joo, Yi-Hwan;Kim, Namyong;Kim, Dong-Seon;Lyu, Sung-Ki
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.21 no.8
    • /
    • pp.72-78
    • /
    • 2022
  • Bending using high-frequency induction heating is used to bend pipes and sections, and is currently widely applied in industrial fields such as power generation facilities, ships, onshore plants, and offshore plants. The purpose of this study is to study the manufacturing process and design technology of high-frequency bending of pipe to make the best pipe design arrangement. Although various studies are being conducted in the field of high-frequency bending, more research is needed on high-frequency bending of pipes for ship building and offshore plants. The purpose of this study is to review the feasibility of production design using 3D model tool of S3D and AM(PDMS), and to review and improve bending thickness reduction, reduction rate, and roundness.

A Study on Landscape Management Techniques of Cultural Heritage Designated Area Using 3D Mapping Method (3D맵핑을 이용한 문화재 지정구역 경관관리기법 연구)

  • Kim, Jae-Ung;Lee, Won-Ho;Shin, Hyun-Sil
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.36 no.1
    • /
    • pp.97-108
    • /
    • 2018
  • The purpose of this study is to propose the construction of a visibility analysis model, which is the basis of the analysis for landscape management on the heritage sites such as historic villages and scenic sites. Results of the visibility analysis using DEM and the visibility analysis of DSM based on 3D mapping data are compared as follows: Precision level of the extracted data was confirmed to be less than 6.5cm, based on RTK survey results produced by constructing orthoimage data and DSM from the digital data of 2cm-class GSD(Ground Sample Distance) obtained by using a small UAV(Unmanned Aerial Vehicle). As a result of comparing the visibility analysis data of Digital Surface Model (DSM) using a small UAV with Digital Elevation Model(DEM) applying the height of the building to the Digital Topographic Map, it was confirmed that more realistic visibility analysis can be accomplished by applying DSM, as the structures such as fences, trees, and houses are reflected in the topographic data. The visibility analysis model using the 3D mapping technique can efficiently obtain the constantly changing topographic information when needed, by immediately constructing the data by utilizing a small UAV. It seems to be possible to propose a reasonable analysis result for preservation management such as landscape evaluation of cultural property.

A Study on the Development of Ship Building for the Wooden Canoe by Piling-up Laminated Wooden Plates Kit [1] - A Design for canoe hull and laminating wooden plates for piling-up kit - (적층식 평판 키트형 카누 건조 기술 개발에 관한 연구 [1] - 카누 선체의 설계 및 적층식 평판 키트 분할 기법 -)

  • Kim, Heui-Jung;Kim, Shung-Hyun;Jeong, Jae-Hyun
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.33 no.5
    • /
    • pp.762-769
    • /
    • 2009
  • A canoe is one of the most popular boats in leisure on the water. Generally canoe has been built by good wooden strips. And canoe built by FRP is used for business recently. But by the users' demands for good quality and the restriction to environmental pollution the wooden canoes are required for personal and canoe building business. The modern wooden canoes were built by the strip construction method are used typically. However it is not suitable for the mass productivity requires effective resource operations and managements of men, materials, times, and price. On this paper the new construction method, called the piling-up laminated construction method, is studied to building a canoe using the piling-up with the laminated wooden plates gives more productivity than the others. First a canoe with various curved surfaces is designed from 3D design system. And the hull of canoe model is divided horizontally to generating the laminated plates that will be converting real wooden plates available from the market and will be routed by the manufacturing machine. After the simulating and analyzing of piling-up with the laminated plates, the canoe is building with less times, less men, less resources, and lower price than other method, avoid of the requirements of additional building tools. On the next paper the constructing of a real canoe using the manufactured wooden plates will be studied.

Development of a Flood Disaster Evacuation Map Using Two-dimensional Flood Analysis and BIM Technology (2차원 침수해석과 BIM 기술을 활용한 홍수재난 대피지도 작성)

  • Jeong, Changsam
    • Journal of Korean Society of Disaster and Security
    • /
    • v.13 no.2
    • /
    • pp.53-63
    • /
    • 2020
  • In this study, the two-dimensional flow analysis model Hydro_AS-2D model was used to simulate the situation of flooding in Seongsangu and Uichang-gu in Changwon in the event of rising sea levels and extreme flooding, and the results were expressed on three-dimensional topography and the optimal evacuation path was derived using BIM technology. Climate change significantly affects two factors in terms of flood damage: rising sea levels and increasing extreme rainfall ideas. The rise in sea level itself can not only have the effect of flooding coastal areas and causing flooding, but it also raises the base flood level of the stream, causing the rise of the flood level throughout the stream. In this study, the rise of sea level by climate change, the rise of sea level by storm tidal wave by typhoon, and the extreme rainfall by typhoon were set as simulated conditions. The three-dimensional spatial information of the entire basin was constructed using the information of topographical space in Changwon and the information of the river crossing in the basic plan for river refurbishment. Using BIM technology, the target area was constructed as a three-dimensional urban information model that had information such as the building's height and location of the shelter on top of the three-dimensional topographical information, and the results of the numerical model were expressed on this model and used for analysis for evacuation planning. In the event of flooding, the escape route is determined by an algorithm that sets the path to the shelter according to changes in the inundation range over time, and the set path is expressed on intuitive three-dimensional spatial information and provided to the user.

Effect of damage on permeability and hygro-thermal behaviour of HPCs at elevated temperatures: Part 1. Experimental results

  • Gawin, D.;Alonso, C.;Andrade, C.;Majorana, C.E.;Pesavento, F.
    • Computers and Concrete
    • /
    • v.2 no.3
    • /
    • pp.189-202
    • /
    • 2005
  • This paper presents an analysis of some experimental results concerning micro-structural tests, permeability measurements and strain-stress tests of four types of High-Performance Concrete, exposed to elevated temperatures (up to $700^{\circ}C$). These experimental results, obtained within the "HITECO" research programme are discussed and interpreted in the context of a recently developed mathematical model of hygro-thermal behaviour and degradation of concrete at high temperature, which is briefly presented in the Part 2 paper (Gawin, et al. 2005). Correlations between concrete permeability and porosity micro-structure, as well as between damage and cracks' volume, are found. An approximate decomposition of the thermally induced material damage into two parts, a chemical one related to cement dehydration process, and a thermal one due to micro-cracks' development caused by thermal strains at micro- and meso-scale, is performed. Constitutive relationships describing influence of temperature and material damage upon its intrinsic permeability at high temperature for 4 types of HPC are deduced. In the Part II of this paper (Gawin, et al. 2005) effect of two different damage-permeability coupling formulations on the results of computer simulations concerning hygro-thermo-mechanical performance of concrete wall during standard fire, is numerically analysed.

Classification System of BIM based Spatial Information for the Preservation of Architectural Heritage - Focused on the Wooden Structure - (건축문화재의 보존관리를 위한 BIM 기반 공간정보 분류체계 구성개념 - 목조를 중심으로 -)

  • Choi, Hyun-Sang;Kim, Sung-Woo
    • Korean Institute of Interior Design Journal
    • /
    • v.24 no.1
    • /
    • pp.207-215
    • /
    • 2015
  • It seems obvious that the spatial information of existing architectural heritage will be re-structured utilizing BIM technology. In the future to be able to implement such task, a new system of classification of spatial information, which fit to the structural nature of architectural heritage is necessary. This paper intend to suggest the conceptual model that can be the base of establishing new classification system for architectural heritage. For this study we reviewed researches related to classification system of architectural heritage (CS-AH) and BIM based architectural heritage (BIM-AH), first. As a result, we found that CS-AH is focused on building elevation and type, and BIM-AH is biased on the Library and Parametric Modeling. Second, we figured out a relationship between the CS-AH and BIM-AH. From this analysis, we found that BIM-AH is biased on Library and Parametric since the building elevation and type was focused on CS-AH. This review suggests a potential of the 3D CS-AH to expand the range of research for BIM-AH. At last, we suggest the three concept of classification are: 1)horizontality-accumulation relationship, 2)structure-infill relationship, 3)segment-member relationship. These three concept, together as one system of classification, could provide useful framework of new classification system of spatial information for architectural heritage.

Operation Results and Utility of Dynamic Pricing Response Control-Applied VRF System in Summer Season

  • Kim, Min-seok;Lee, Je-hyeon;Song, Young-hak
    • Architectural research
    • /
    • v.19 no.3
    • /
    • pp.71-77
    • /
    • 2017
  • Dynamic pricing refers to a system in which a tariff varies, according to a level of charging and applied time depending on time change. The power billing system used in the Korean Electric Power Corporation (KEPCO) is based on time of use (TOU) pricing, which is one of the dynamic pricing systems. This paper aimed to determine the operational results of a variable refrigerant flow system, to which a new control algorithm was applied, in order to respond to dynamic pricing, in summer and the utility of the new control. To do this, real measured data was acquired from a VRF system installed in a building for educational purposes, where dynamic pricing was applied for about 100 days during summer time. At the maximum load operation time period in TOU, the new control minimized operation within the indoor comfort range, an increase in refrigerant evaporation temperature in the indoor unit and the number of revolutions in a compressor in the outdoor unit was limited. As a result, power usage was decreased by 11%, and the operational cost by 14.6%. Furthermore, measurement results using the Predicted Mean Vote (PMV) model, that represented satisfaction of thermal environment, showed that 82.8% to 90.4% of the occupants of the building were satisfied during operation when the new control was applied.

Dynamic responses on traditional Chinese timber multi-story building with high platform base under earthquake excitations

  • Zhang, Xicheng;Ma, Hui;Zhao, Yanli;Zhao, Hongtie
    • Earthquakes and Structures
    • /
    • v.19 no.5
    • /
    • pp.331-345
    • /
    • 2020
  • The multi-story timber structure with high platform base is one of the important architectural types in the traditional Chinese buildings. To study the dynamic characteristics and seismic responses on this kind of traditional structure, the 3-D finite element models of Xi'an drum tower which included the high platform base, upper timber structure and whole structure was established considering the structural form and material performance parameters of the structure in this study. By the modal analysis, the main frequencies and mode shapes of this kind of traditional building were obtained and investigated. The three kinds of earthquake excitations included El-Centro wave, Taft wave and Lanzhou wave were separately imposed on the upper timber structure model and the overall structure model, and the seismic responses on the tops of columns were analyzed. The results of time history analysis show that the seismic response of the upper timber structure is obviously amplified by high platform base. After considering the effect of high platform base, the mean value on the lateral displacement increments of the top column in the overall structure is more than 20.478% and the increase of dynamic coefficients was all above 0.818 under the above three different earthquake excitations. Obviously, it shows that the existence of high platform base has a negative influence on the seismic responses of upper timber structure. And the high platform base will directly affect the safety of the upper timber structure. Therefore, the influence of high platform base on the dynamic response of its upper timber structure cannot be neglected.