• Title/Summary/Keyword: 3D Building Model

Search Result 698, Processing Time 0.033 seconds

A Case Study on 3-D Modeling of the Orebody by using the 3D Modeler ('3D Modeler'를 사용한 광체의 3차원 모델링 사례연구)

  • Lee, Doo-Sung;Kim, Hyoun-Gyu
    • Geophysics and Geophysical Exploration
    • /
    • v.5 no.2
    • /
    • pp.93-98
    • /
    • 2002
  • A three dimensional model for the orebody of an operating mine in Korea was constructed by using a program called '3-D Modeler'. The program allows the user to interactively construct a 3-D model of an orebody from its horizontal cross-sections. The 3-D Modeler is easily able to combine and display various spatial data for model construction. The result of modeling is strongly influenced by control points that correlate to the adjacent horizontal cross-sections. The control points are determined by comparing the geometrical shape of the adjacent cross-sections in conjunction with the geological features of the orebody. The resulting model can be evaluated in viewing the constructed object in three dimensional space or more closely evaluated by inspecting the cross-section. The model can iteratively be improved by modifying the shape of the cross-section and by using this new cross-section for the model building.

Reconstruction of 3D Building Model from Satellite Imagery Based on the Grouping of 3D Line Segments Using Centroid Neural Network (중심신경망을 이용한 3차원 선소의 군집화에 의한 위성영상의 3차원 건물모델 재구성)

  • Woo, Dong-Min;Park, Dong-Chul;Ho, Hai-Nguyen;Kim, Tae-Hyun
    • Korean Journal of Remote Sensing
    • /
    • v.27 no.2
    • /
    • pp.121-130
    • /
    • 2011
  • This paper highlights the reconstruction of the rectilinear type of 3D rooftop model from satellite image data using centroid neural network. The main idea of the proposed 3D reconstruction method is based on the grouping of 3D line segments. 3D lines are extracted by 2D lines and DEM (Digital Elevation Map) data evaluated from a pair of stereo images. Our grouping process consists of two steps. We carry out the first grouping process to group fragmented or duplicated 3D lines into the principal 3D lines, which can be used to construct the rooftop model, and construct the groups of lines that are parallel each other in the second step. From the grouping result, 3D rooftop models are reconstructed by the final clustering process. High-resolution IKONOS images are utilized for the experiments. The experimental result's indicate that the reconstructed building models almost reflect the actual position and shape of buildings in a precise manner, and that the proposed approach can be efficiently applied to building reconstruction problem from high-resolution satellite images of an urban area.

A 3-D Propagation Model Considering Building Transmission Loss for Indoor Wireless Communications

  • Choi, Myung-Sun;Park, Han-Kyu;Heo, Youn-Hyoung;Oh, Sang-Hoon;Myung, Noh-Hoon
    • ETRI Journal
    • /
    • v.28 no.2
    • /
    • pp.247-249
    • /
    • 2006
  • In the development of a new wireless communications system, a versatile and accurate radio channel for indoor communications is needed. In particular, the investigation of radio transmission into buildings is very important. In this letter, we present an improved three-dimensional electromagnetic wave propagation prediction model for indoor wireless communications that takes into consideration building penetration loss. A ray tracing technique based on an image method is also employed in this study. Three-dimensional models can predict any complex indoor environment composed of arbitrarily shaped walls. A speed-up algorithm, which is a modified deterministic ray tube method, is also introduced for efficient prediction and computation.

  • PDF

A Study on Development of Intelligent CCTV Security System based on BIM (건물정보모델 기반 지능형 CCTV 보안감시 시스템 개발)

  • Kim, Ik-Soon;Shin, Hyun-Shik
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.6 no.5
    • /
    • pp.789-795
    • /
    • 2011
  • This paper aims to develop authoring tools and services platform that can be Immediate response through supervisor's intuitive understanding based 3d-Building Information mode about overall security situation of building by mapping many CCTV images on 3D space information from traditional observation way that make simply visualize CCTV images on the Situation Board.

DEVELOPMENT OF AN INTEGRATED MODEL OF 3D CAD OBJECT AND AUTOMATIC SCHEDULING PROCESS

  • Je-Seung Ryu;Kyung-Hwan Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1468-1473
    • /
    • 2009
  • Efficient communication of construction information has been critical for successful project performance. Building Information Modeling (BIM) has appeared as a tool for efficient communication. Through 3D CAD objects, it is possible to check interception and collisions of each object in advance. In addition, 4D simulation based on 3D objects integrated with time information makes it realize to go over scheduling and to perceive potential errors in scheduling. However, current scheduling simulation is still at a stage of animation due to manual integration of 3D objects and scheduling data. Accordingly, this study aims to develop an integrated model of 3D CAD objects that automatically creates scheduling information.

  • PDF

Development of Productivity Analysis Simulation Model for Formwork Based on 3D Printing Technology Using ARENA (ARENA를 활용한 3D 프린팅 기술 기반 거푸집 공사의 생산성 분석 시뮬레이션 모델 개발)

  • Ahn, Heejae;Lee, Changsu;Kim, Harim;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.188-189
    • /
    • 2021
  • The technology of manufacturing freeform molds with S-LOM based 3D printer has advantages in the production period and the curvature range. However, there is no any support tool about productivity analysis of S-LOM technology because S-LOM technology is early-stage technology. There can be problems about increase of construction time and cost without any decision support tool like productivity analysis models etc. Therefore, in this study, the productivity analysis simulation model for freeform formwork based on S-LOM technology was developed using ARENA software. The process and logic of manufacturing freeform molds can be easily visualized in this model. Futhermore, the resource like labor, equipment and material can be easily optimized with this model. As a result, it can contribute to preventing the increase of construction time and cost in formwork with further productivity analysis.

  • PDF

Extracting Building Geomety from BIM for 3-D City Model (BIM으로부터 가상도시 구축용 건축물정보의 추출)

  • Goh, Il-Du;Choi, Joong-Hyun;Kim, E-Doo;Jeong, Yeon-Suk;Lee, Jae-Min
    • Spatial Information Research
    • /
    • v.16 no.2
    • /
    • pp.249-261
    • /
    • 2008
  • This study proposes a method for acquiring and managing basic information on building, which is continuously updated through construction and re-construction, in order to implement 3D-GIS based on geometric shape information and building information. First of all, distinctions between BIM and GIS information models are described, and then an overview of CityGML for virtual city and its Level of Detail are introduced. At last, a prototype for extracting building geometry from BIM data in accordance with CityGML is presented for demonstration. By using IFC data from BIM, this approach enables a lot of firms and contractors in building industry to utilize their 2D/3D, data on sites and buildings, and also to save many effects for generating exterior and interior building models which are inevitable for implementing National GIS.

  • PDF

A Study on Inelastic Behavior of an Asymmetric Tall Building (비대칭 초고층건물의 비탄성거동에 관한 연구)

  • 윤태호;김진구;정명채
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.1 no.3
    • /
    • pp.37-44
    • /
    • 1997
  • In this paper, the inelastic behavior of an asymmetric tall building is investigated. The asymmetry in rigidity caused by the structural asymmetry induces torsional as well as lateral deformation. The inelastic analysis of such an asymmetric structure is difficult to carry out with a planar model and thus requires a full three dimensional model. In this paper a 102 story unsymmetric tall building is analized by static push-over procedure and its behavior is investigated. The analysis are performed with and without floor rotation to compare the results. According to the results the static behavior of the model building, as expected, turned out to be dependent heavily an the asymmetry of the plan shapes of the building.

  • PDF

Design and Implementation of Real-Time Progress Management System Using UML (Unified Modeling Language) - The Focus on Steel Structural Construction - (UML을 이용한 실시간 진도관리 시스템의 설계 및 구현 - 로봇 크레인 기반 철골공사를 중심으로 -)

  • Park, Jung-Lo;Kim, Kyung-Hwan;Kim, Jael-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.163-166
    • /
    • 2009
  • All sorts of technique for schedule progress management is being developed recently, These can change and develop the abstractive concept model to a detailed model that describes the visual 3D image about a schedule plan. but, this technique is troublesome, because this requires the handwork by means of connection between 3D-CAD and scheduling Program. In this study, the process of real-time schedule progress control system using the integrated database by 3D-CAD object information system and schedule module is presented. This study present the process of a schedule progress management using UML, and the process of real-time schedule progress management using RFID system. Through this study, we want to realize the rapid generation of estimated schedule information and to simulate and analyze actual schedule information by real-time.

  • PDF

A Study on Analysis for Energy Demand of the Heating, Cooling and Lighting in Office Building with Transparent Thin-film a-Si BIPV Window (투광형 박막 BIPV 창호 적용에 따른 냉난방 및 조명 부하 저감에 관한 연구)

  • Yoon, Jong-Ho;An, Young-Sub;Park, Jang-Woo;Kim, Bit-Na
    • KIEAE Journal
    • /
    • v.13 no.3
    • /
    • pp.91-96
    • /
    • 2013
  • The purpose of this study was to analyze the annual energy demand including heating, cooling and lighting according to kind of windows with transparent thin-film a-Si Building Integrated Photovoltaic(a-Si BIPV) for office building. The analysis results of the annual energy demand indicated that the a-si BIPV window was reduced by 8.4% than the clear gazing window. The base model A was combinate with a-Si BIPV window area of 67% and clear window area of 33% among the total exterior area. The model B is to be applied with low-e clear glass instead of clear glass of the base model A. The model B was reduced to annual energy demand of 1% more than the model A. Therefore, By using a-si BIPV solar module, the cooling energy demand can be reduced by 53%(3.4MWh) and the heating energy demand can be increase by 58%(2.4MWh) than clear glazing window in office building. Also, Model C applied to the high efficient lighting device to the model B was reduced to annual energy demand of 14.4% more than the Model D applied to the high efficient lighting device to the model A. The Model E applied with daylight dimming control system to the Model C was reduced to annual energy demand of 5.9% more than Model C.