• Title/Summary/Keyword: 3D 지형자료

Search Result 256, Processing Time 0.023 seconds

A study on the estimation of rock mass classes using the information off a tunnel center line (터널 중심선으로부터 이격된 자료를 활용한 미시추구간의 암반등급 산정에 관한 연구)

  • You, Kwang-Ho;Lee, Sang-Ho;Choo, Suk-Yeon;Jue, Kwang-Sue
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.6 no.2
    • /
    • pp.101-111
    • /
    • 2004
  • In order to guarantee the stability of a tunnel and its optimum design, it is very important to obtain enough ground investigation data. In realty, however, it is not the case due to the limitation of measuring spatially distributed data and economical reasons. Especially, there are regions where drilling is impossible due to civil appeal and mountainous topology, and it is also difficult to estimate rock mass classes quantitatively with only geophysical exploration data. In this study, therefore, 3 dimensional multiple indicator kriging (3D-MI kriging), which can incorporate geophysical exploration data and drill core data off a tunnel center line, is proposed to cope with such problems. To this end, two dimensional mutiple indicator kriging, which is one of the geostatistical techniques, is extended for three dimensional analysis. Also, the proposed 3D-MI kriging was applied to determine the rock mass classes by RMR system for the design of a Kyungbu express rail way tunnel.

  • PDF

3D Stereoscopic Terrain Extraction of Road Cut Failure Slope Using Unmanned Helicopter Photography System (무인 헬리콥터 사진촬영시스템을 이용한 도로 절개지 붕괴사면 3차원 입체 지형 추출)

  • Jang, Ho-Sik
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.28 no.5
    • /
    • pp.485-491
    • /
    • 2010
  • Acquisition of information on failure slope, which may cause apprehension of second hand damage, requires acquisition of fast and accurate topographical data and efficient expression in indirect surveying method without accessing as needed. Therefore, in this study, the images on the intended area were photographed through hovering in the air by approaching collapsed road cut slope with the use of unmanned helicopter photography system. As a result of comparing the points observed by no prism total station and the 10 coordinate points analyzed through image analysis, the averages of absolute values were shown to be 0.056m in X axis direction, 0.082m in Y axis direction and 0.066m Z axis direction. In addition, the RMSE of the error for 10 points of test points were 0.015636m in X axis direction, 0.021319m in Y axis direction and 0.018734m in Z axis direction. Therefore, this method can determine the range of slope and longitudinal and cross sections of each slope in dangerous area that cannot be approached in relational image matching method for the terrains of such collapsed cut slope.

A Experimental Study on the 3-D Image Restoration Technique of Submerged Area by Chung-ju Dam (충주댐 수몰지구의 3차원 영상복원 기법에 관한 실험적 연구)

  • 연상호
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.22 no.1
    • /
    • pp.21-27
    • /
    • 2004
  • It will be a real good news fer the people who were lost their hometown by the construction of a large dam to be restored to the farmer state. Focused on Cheung-pyung around where most part were submerged by the Chungju large Dam founded in eurly 1980s, It used remote sensing image restoration Technique in this study in order to restore topographical features before the flood with stereo effects. We gathered comparatively good satellite photos and remotely sensed digital images, then its made a new fusion image from these various satellite images and the topographical map which had been made before the water filled by the DAM. This task was putting together two kinds of different timed images. And then, we generated DEM including the outskirts of that area as matching current contour lines with the map. That could be a perfect 3D image of test areas around before when it had been water filled by making perspective images from all directions included north, south, east and west, fer showing there in 3 dimensions. Also, for close range visiting made of flying simulation can bring to experience their real space at that time. As a result of this experimental task, it made of new fusion images and 3-D perspective images and simulation live images by remotely sensed photos and images, old paper maps about vanished submerged Dam areas and gained of possibility 3-D terrain image restoration about submerged area by large Dam construction.

Seafloor Topographic Survey with Bedrock (기반암 정보를 포함한 해저 지형 조사 연구)

  • Kim, Myoung-Bae;Kwak, Kang-Yul
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.29 no.4
    • /
    • pp.343-349
    • /
    • 2011
  • Seabed topography and marine site survey should be performed first in the design and construction of marine structures. We could successfully acquire the seafloor topography information can be obtained by bathymetric survey and side scan sonar and the sediment layer thickness and 3D bedrock depth by seismic reflection. It is necessary to apply carry out the integrated interpretation to each other in the ocean civil Eng. In this paper, we have obtained information on the sea bottom topography and water depth at the same time using interferometer technique and on the basement depth by seismic reflection. We have performed to assess the proposed method on the seafloor topographic survey with bedrock.

The Application of Geospatial Information Acquisition Technique and Civil-BIM for Site Selection (지형공간정보취득기술과 토목BIM을 활용한 부지선정 연구)

  • Moon, Su-Jung;Pyeon, Mu-Wook;Park, Hong-Gi;Ji, Jang-Hun;Jo, Jun-Ho
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.28 no.6
    • /
    • pp.579-586
    • /
    • 2010
  • Due to the recent development of measuring technology and 3D programs, it has become possible to obtain various spatial data. This study utilizes the 2-dimensional data and 3-dimensional data extraction technology based on the existing empirical and statistical DB. The data obtained from geospatial data technology are integrated with civil engineering BIM to conduct the modeling of the topography of the target region and select the optimum location condition by using the cut and fill balance of the volume of earth. The target area is the land around Tamjin River, Jangheong-gun, Jeolla-do. The 3-dimensional topology linked with 3-dimensional mapping technology by using the orth-image and aerial LiDAR that uses aerial photo of the target area is visualized with Civil3D of AutoDesk. By using Civil3D program, the Thanks to the recent development of measuring technology and 3D programs, target area is analyzed through visualization and related data can be obtained for analysis. The method of using civil engineering BIM enables to obtain various and accurate information about the target area which is helpful for addressing the issues risen from the existing methodology. In this regard, it aims at searching for the alternatives and provides suggestions to utilize the information.

Analysis of Terrain Data Change using Digital Elevation Data (수치표고자료를 활용한 지형자료변화 분석)

  • 이형석;송승호;배상호
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2004.11a
    • /
    • pp.385-388
    • /
    • 2004
  • Many environmental destruction factors are accompanied in the mining development work and the secondary environmental disaster and the induction factors are inhered. We aquired digital data using aerial photogrammetry to analyze the terrain current situation according to the development situation of the mining restoration plan. We made the object area to 3D model and conducted terrian change monitoring. Then, we presented the decision-making information to improve rational management according to the original state plan.

  • PDF

Building Boundary Extraction from Airborne LIDAR Data (항공 라이다자료를 이용한 건물경계추출에 관한 연구)

  • Lee, Suk Kun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.6D
    • /
    • pp.923-929
    • /
    • 2008
  • Due to the increasing need for 3D spatial data, modeling of topography and artificial structures plays an important role in three-dimensional Urban Analysis. This study suggests a methodology for solving the problem of calculation for the extraction of building boundary, minimizing the user's intervention, and automatically extracting building boundary, using the LIDAR data. The methodology suggested in this study is characterized by combining the merits of the point-based process and the image-based process. The procedures for extracting building boundary are three steps: 1) LIDAR point data are interpolated to extract approximately building region. 2) LIDAR point data are triangulated in each individual building area. 3) Extracted boundary of each building is then simplified in consideration of its area, minimum length of building.The performance of the developed methodology is evaluated using real LIDAR data. Through the experiment, the extracted building boundaries are compared with digital map.

Analysis of Accuracy and DTM Generation Using Digital Photogrammetry (수치사진 측량을 이용한 DTM 추출 및 정확도 분석)

  • Park, Jin-Seong;Hong, Sung-Chang;Sung, Jae-Ryeol;Lee, Byung-Hwan
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2010.04a
    • /
    • pp.301-306
    • /
    • 2010
  • Recently GIS is not only displaying and servicing data on the 2D, but also is changing rapidly to display and service 3D data. Also 3D related technology is developing actively. For display of 3D data, terrain DTM has become a basis. Generally, to acquire DTM, users are using LIDAR data or digital map's contour line. However, if using these data for producing DTM, users need to additional cost and data lead time. And hard to update terrain data. For possibility of solving these problem, this study did DTM extraction with automatic matching for aerial photograph, and analysed the result with measurement of Orthometric height and excuted accuracy through DTM(which extracted from digital photogrammetric technique). As a result, we can get a high accuracy of RMSE (0.215m).

  • PDF

Integrated Data Model of Topographic and Cadastral Information in LIS (토지정보체계에서 지형 및 지적 정보의 공동 활용에 관한 연구)

  • Lee, Suk Kun;Kim, Gab Jin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.3D
    • /
    • pp.541-547
    • /
    • 2006
  • With the new paradigm of ubiquitous in the developed computing technology, it is urgently necessary to research GIS fields centering around positioning techniques. The intention of this study is to propose implementation methods for integrating topographic and cadastral data. For this purpose an integrated data model is formed to coincide the graphic data of cadastral map with that of topographic map. As a result, the integrated data model could be built by harmonizing cadastral map with topographic map. We suggest data model for connecting with other information systems in the conditions of data uniformity and implementation. This data implementation models suggested in this research can provide a good reference for the future implementation of other systems. This results will be efficiently used as basis for practical use in ubiquitous environments of spatial informations.

Estimation of Quantitative Daily Precipitation Forecasting for Integrated Real-time Basin Water Management System (실시간 물관리를 위한 정량적 강수예측기법에 관한 연구)

  • Oh, Jai-Ho;Kim, Jin-Young;Kang, Bu-Sick;Jeong, Chang-Sam;Ko, Ick-Hwan
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.1488-1491
    • /
    • 2006
  • 본 연구에서는 실시간 통합 물관리 시스템의 일환으로 월별 일강수량 예측 시스템에 관한 연구를 실시하였다. 선행시간 2일 예측에 대해서는 기상청 생성 수치모의 RDAPS (Regional Data Assimilation and Prediction System)를 기반으로 강수진단모형인 QPM (Quantitative Precipitatiom Model)을 이용하여 지형효과를 보정하였으며, 선행시간 2일에서 8일까지의 예측에 대해서는 GDAPS (Global Data Assimilation and Prediction System) 모의결과를 QPM을 이용하여 보정하였고, 선행시간 10일 이후의 예측값은 통계적 기법을 이용한 자료를 활용하였다. 통계적 기법으로는 과거 20년간의 관측된 강수경향을 이용하여 시스템을 구축하였다. 강수진단모형 (QPM)은 Misumi et al. (2001), Bell (1978), Collier (1975)등이 제안한 바 있는 Collier-type의 모형으로서 이들 모형은 소규모 지형 효과를 고려한 강수량을 산출하는 진단 모형이다. QPM은 중규모 예측 모형으로부터 계산된 수평 바람, 고도, 기온, 강우 강도, 그리고 상대습도 등의 예측 자료를 이용하고, 중규모 예측 모형에서는 잘 표현되지 않는 소규모 지형 효과를 고려함으로써 중규모 예측 모형에서 생산된 상대적으로 성긴 격자의 강수량 예측 값을 상세 지역의 지형을 고려한 강수량 예측 값으로 재구성하게 된다. QPM은 중규모 모형으로부터 나온 자료를 초기 자료로 이용하고 3 km 간격의 상세 지형을 반영하는 모형으로 소규모 지형 효과를 표현함으로써 상세 지역에서의 강수량 산출과 지형에 따른 강수량의 분포 파악이 용이할 뿐 아니라, 계산 효율성을 개선시킬 수 있다.착능이 높은 것으로 사료되었다.X>${\mu}_{max,A}$는 최대암모니아 섭취률을 이용하여 구한 결과 $0.65d^{-1}$로 나타났다.EX>$60%{\sim}87%$가 수심 10m 이내에 분포하였고, 녹조강과 남조강이 우점하는 하절기에는 5m 이내에 주로 분포하였다. 취수탑 지점의 수심이 연중 $25{\sim}35m$를 유지하는 H호의 경우 간헐식 폭기장치를 가동하는 기간은 물론 그 외 기간에도 취수구의 심도를 표층 10m 이하로 유지 할 경우 전체 조류 유입량을 60% 이상 저감할 수 있을 것으로 조사되었다.심볼 및 색채 디자인 등의 작업이 수반되어야 하며, 이들을 고려한 인터넷용 GIS기본도를 신규 제작한다. 상습침수지구와 관련된 각종 GIS데이타와 각 기관이 보유하고 있는 공공정보 가운데 공간정보와 연계되어야 하는 자료를 인터넷 GIS를 이용하여 효율적으로 관리하기 위해서는 단계별 구축전략이 필요하다. 따라서 본 논문에서는 인터넷 GIS를 이용하여 상습침수구역관련 정보를 검색, 처리 및 분석할 수 있는 상습침수 구역 종합정보화 시스템을 구축토록 하였다.N, 항목에서 보 상류가 높게 나타났으나, 철거되지 않은 검전보나 안양대교보에 비해 그 차이가 크지 않은 것으로 나타났다.의 기상변화가 자발성 기흉 발생에 영향을 미친다고 추론할 수 있었다. 향후 본 연구에서 추론된 기상변화와 기흉 발생과의 인과관계를 확인하고 좀 더 구체화하기 위한 연구가 필요할 것이다.게 이루어질 수 있을 것으로 기대된다.는 초과수익률이 상승하지만, 이후로는 감소하므로, 반전거래전략을 활용하는 경우 주식투자기간은 24개월이하의 중단기가 적합함을 발견하였다. 이상의 행태적 측면과 투자성과측면의 실증결과를 통하여 한국주

  • PDF