• Title/Summary/Keyword: 3차원 캐드정보

Search Result 13, Processing Time 0.02 seconds

Usability Improvement of BIM for Construction Projects Using Active BIM Functions (능동형 BIM 체계에 의한 토목 및 건축분야 BIM 활용성 개선 연구)

  • Kang, Leen-Seok;Moon, Hyun-Seok;Kim, Hyeon-Seung;Kwak, Joong-Min
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.74-83
    • /
    • 2013
  • Most current BIM systems are focused on the visual information of work status in the design and construction stages. In a passive BIM system, 3D CAD tool can visualize the interference elements of design drawings, however, it cannot suggest a solution to solve the interference status. And 4D CAD tool in the construction stage can simulate the appearance of each activity by construction schedule, however, it cannot suggest an optimized schedule plan considering specified schedule condition of the project. Recently, many organizations need BIM solutions that can improve the work status beyond the level of simple visual information from BIM system. Active BIM system can provide the solutions to the project manager. This study suggests active BIM functions for the solutions and attempts to develop a 4D CAD engine to validate the usability of the functions.

A Development of 3D Computer-Aided Design(CAD) Add-on Program for a Quantity Take-off through the User Needs Analysis (사용자 요구 사항 분석에 따른 물량산출 연동 프로그램 개발)

  • Kim, Seong-Ah;Lee, Jea-Jun;Shin, Tea-Hong;Chin, Sang-Yoon;Kim, Yea-Sang;Choi, Cheol-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.297-300
    • /
    • 2008
  • Since the Three Dimensional Computer Aided Design(3D CAD) appeared in 1990s, Building Information Modeling(BIM) has got the great issue in the construction project nowadays. BIM is the process of managing and generating building information during life cycle of a construction project. And information can be moved to 3D modeling flexibly in BIM. As a result, a field of estimating has also been doing researches in the calculation of the amount of building materials from 3D modeling. And the Construction Cost Estimating Software which is generally used over the world has been trying to be applied to the Construction project in Korea. But, when we consider the productivity, it is less efficient than the existing way in Korea which use the 2D Drawings when they take off the Quantity. Also, there are lots of difference how to estimate the construction cost. between Korea and the others. Because it is a bit hard to apply the software used in the other countries to the construction project in Korea, people couldn't use it well in the construction project actually. In this study, for developing the appropriate construction cost estimating software rooted in 3D in Korea, we suggest 3D CAD Add-on Program for a Quantity Take-off which can move quantitative information to 3D CAD.

  • PDF

3D printed interim immediate denture by using the occlusal plane digital transfer method of the POP BOW system in a patient planning to extract upper and lower residual teeth: a case report (상하악 전악 발거 환자에서 POP BOW 시스템의 교합평면 디지털 전이법을 이용한 3D 프린팅 임시 즉시의치의 수복 증례)

  • Park, Do-Hyun;Bae, Eun-Bin;Jung, In-Hwan;Jeong, Chang-Mo;Yun, Mi-Jung;Huh, Jung-Bo;Lee, So-Hyoun
    • Journal of Dental Rehabilitation and Applied Science
    • /
    • v.38 no.3
    • /
    • pp.178-188
    • /
    • 2022
  • Interim immediate denture is fabricated to minimize the period of edentulousness after removal of the patient's remaining teeth and before delivery of final prosthesis. In the case of using the CAD/CAM system, there is an advantage in that the manufacturing process in the clinic and laboratory can be simplified by overcoming some of the limitations of manufacturing interim immediate dentures in the traditional way. However, there are also disadvantages in that errors occur in the process of transmitting information about the patient's intermaxillary relationship to the digital network of the laboratory, resulting in unstable occlusal relationships or non-esthetic prostheses. To overcome this problem, using the simple and accurate POP BOW system's occlusal plane digital transfer method, it was possible to fabricate an esthetic and functional 3D printed interim immediate denture after removal of the remaining upper and lower anterior teeth.