• Title/Summary/Keyword: 3단계 공정

Search Result 808, Processing Time 0.025 seconds

A Basic Study for Accumulating Scheduling Knowledge-Base (공정관리 지식기반 구축을 위한 기초적 연구)

  • Jang Se-Han;Kim Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.3 s.7
    • /
    • pp.83-91
    • /
    • 2001
  • Generally the level of accumulating scheduling knowledge-base in Korean construction companies is in the scheduling knowledge-base infrastructure construction phase and Even in top 10 construction companies, the level is in early scheduling knowledge activity phase. The principle causes of this situation are unawareness of importance to scheduling knowledge and absence of procedure related to scheduling knowledge-base. This research analyzes the problems to accumulate scheduling knowledge-base in Korean construction companies and proposes a procedure model to accumulate scheduling knowledge-base property, which adds items of scheduling knowledge-base infrastructure and scheduling knowledge activity to the existing scheduling procedures of Korean construction companies. Using procedure model for accumulating scheduling knowledge-base, Korean construction companies can develop a new scheduling procedure and accumulate scheduling knowledge accordingly. If scheduling knowledge were accumulated property according to the procedure, a framework for knowledge management system could be provided.

  • PDF

Optimization of boric acid production process from boron ore (붕소원광으로부터 붕산제조 공정의 최적화)

  • 임형미;이옥란;이승호;최병현
    • Proceedings of the Materials Research Society of Korea Conference
    • /
    • 2003.03a
    • /
    • pp.32-32
    • /
    • 2003
  • Calcuim borate 화합물의 하나인 Colemanite 천연원광을 출발물질로 붕산을 제조하는 공정에 대한 연구로 황산 첨가량과 처리온도, 건조온도와 시간에 따라 생성되는 붕산의 결정상과 수득률, 순도 및 입자의 형상을 관찰하였다. 황산 첨가로 붕소 성분은 용해되어 액상에 남고, SO$_4$$^{2-}$ 와 결합하여 불용성 고체로 분리되고, 붕소의 온도에 따른 용해도 차를 이용하여 재결정화하는 방법으로 99% 이상의 순도를 갖는 붕산(H$_3$BO$_3$)을 얻었다. 공정의 각 단계에서 생성되는 화합물을 TG, NMR, IR, XRD, ICP 등의 방법으로 분석하여 최적 제조 조건을 찾았다.

  • PDF

Development of Aroma Diffuser Using Rapid Prototyping System (쾌속조형기를 이용한 방향기의 개발)

  • 주영철;이창훈
    • Proceedings of the KAIS Fall Conference
    • /
    • 2002.11a
    • /
    • pp.263-265
    • /
    • 2002
  • 제품 개발 초기부터 3차원 CAD를 이용하여 설계를 하고 쾌속조형기를 이용하여 시제품을 제작한 후 이를 이용하여 제품의 성능시험을 하는 새로운 개발공정을 제시하였다. 이 공정을 방향기 개발에 적용함으로써 기존의 시작금형을 이용한 공정보다 제품의 개발기간과 개발비용을 획기적으로 절감할 수 있었다. 또한 설계단계부터 3차원 CAD를 이용함으로써 제품개발의 시행착오 횟수를 크게 줄일 수 있었다.

Construction Progress Management System for PPC Implementation (작업성취율 활용을 위한 공정관리체계)

  • Lim, Chul-Woo;Yu, Jung-Ho;Kim, Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.57-65
    • /
    • 2007
  • Last Planner System (LPS) developed by Lean Construction Institute consists of four steps: Master Schedule, Phase Schedule, Lookahead Planning and Weekly Work Plan. This paper focuses on the process of measuring Percent of Plan Completed (PPC) at the weekly Work Plan stage. PPC means the percentage of weekly assignments completed. According to the results of the researches that deal with PPC from many other countries, we can assure the benefits or using PPC. However the concept of PPC is unfamiliar in Korea construction industry. This paper analyzes the cases in which PPC is applied in other countries and compares them with the production control system in Korean construction industry. The results of this research will provide the time management system for using PPC in Korea.

A Study on a Technique for Simplifying the Connection of a 3D Model and Schedule Information for 4D Simulation (4D 시뮬레이션을 위한 3D 모델 및 공정 정보의 연계 간소화 기법 연구)

  • Park, Sang Mi;Lee, Jae Hee;Yoon, Hyeong Seok;Hwang, Jae Yoeng;Kang, Hyo Jeong;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.6
    • /
    • pp.861-868
    • /
    • 2022
  • A key use of applying building information modeling (BIM) to the construction stage of a project is to help identify construction obstacles and to visualize construction status according to the progress of the construction schedule. When employing 4D simulation for this purpose, start and finish dates for each activity and a 3D model of the activity must be prepared. In this work, in order to simplify the configuration of a 4D model, minimum attribute information of the BIM model produced in the design stage was used to construct a system that generated activity information in the construction stage using a clustering algorithm. Its usefulness as actual schedule management information was then analyzed.

Felling Productivity in Korean Pine Stands by Using Chain Saw (체인톱을 이용한 잣나무의 벌도작업 공정 분석)

  • Han, Won Sung;Cho, Koo Hyun;Oh, Jae-Heun;Song, Tae-Young;Kim, Jae-Won;Shin, Man Yong
    • Journal of Korean Society of Forest Science
    • /
    • v.98 no.4
    • /
    • pp.451-457
    • /
    • 2009
  • This study was conducted to evaluate the felling productivity by chain saw in thinning operation of Korean pine (Pinus koraiensis) stands. Time study data were collected from 4 thinning site in Korean pine stands. This study derived a regression model to estimate the average felling cycle time for evaluating the productivity in felling, which was used to analyze the felling productivity by thinning period. In the study sites, the average felling cycle time per a tree was 463 sec/cycle and the productivity was $2.26m^3/hr$. Thinning period in Korean pine is divided into three groups by producing purposes; small-diameter log, medium-diameter log, and large-diameter log. And analyzed working time and productivity from thinning period fixed by producing purposes. For the small-diameter log producing purpose estimated to be thinning period operated once when the mean DBH was 16 cm and its productivity was $8.94m^3/man{\cdot}day$. For the medium-diameter and large-diameter log producing purposes, thinning period was twice and three times when the mean DBH of the 1st and 2nd thinning period was 16 cm and 21 cm, and its productivity was $9.06m^3/man{\cdot}day$ and $10.86m^3/man{\cdot}day$. The 30 cm in DBH and $15.12m^3/man{\cdot}day$ in productivity was operated 3rd thinning for the large-diameter log producing purposes.

Simulation on Structure of Spiral Inductors for LAM Process Applications (LAM 공정 응용을 위한 나선형 인덕터의 구조에 대한 시뮬레이션)

  • Yun, Eui-Jung;Kim, Jae-Wook;Park, Hyeong-Sik;Lee, Won-Kuk
    • Proceedings of the KIEE Conference
    • /
    • 2006.07c
    • /
    • pp.1347-1348
    • /
    • 2006
  • 기존 반도체공정들이 갖는 리소그래피와 식각 등의 공정단계를 배제하는 direct-write 공정을 이용하여 친환경적인 이점을 가질 수 있는 나선형 인덕터의 구조를 제안하고 주파수 특성을 확인하였다. 인덕터의 구조는 Si를 $300{\mu}m$, $SiO_2$$3{\mu}m$으로 하였으며, CU 코일의 폭과 선간의 간격은 LAM 공정과 direct-write 공정을 이용할 수 있도록 각각 $100{\mu}m$으로 설정하여 3회 권선하였다. 인덕터는 200-500MHz 범위에서 3.5nH의 인덕턴스, 4GHz에서 최대 29 정도의 품질계수를 가지며, SRF는 2.6GHz로 시뮬레이션 결과를 얻을 수 있었다.

  • PDF

Sewage Sludge Treatment with Internal Recirculation and Diverse Pre-treatment Methods Using Combined Digestion Process (혼합 소화공정에서 내부반송과 다양한 전처리를 통한 하수 슬러지 처리)

  • Ha, Jeong Hyub;Choi, Suk Soon;Park, Jong Moon
    • Applied Chemistry for Engineering
    • /
    • v.29 no.5
    • /
    • pp.613-619
    • /
    • 2018
  • In this study, various influent sludge pre-treatment methods and the internal recirculation of thickened sludge from effluents using a liquid/solid separation unit were adopted to investigate their effects on the sludge digestion and methane production in a combined mesophilic anaerobic and thermophilic aerobic sludge digestion process. A lab-scale combined sludge digestion process was operated during 5 phases using different feed sludge pre-treatment strategies. In phase 1, the feed sludge was pre-treated with a thermal-alkaline method. In contrast, in phases 2, 3 and 4, the internal recirculation of thickened sludge from the effluent and thermal-alkaline, thermal, and alkaline pre-treatment (7 days) were applied to the combined process. In phase 5, the raw sludge without any pre-treatment was used to the combined process. With the feed sludge pre-treatment and internal recirculation, the experimental results indicated that the volatile suspended solid (VSS) removal was drastically increased from phases 1 to 4. Also, the methane production rate with the thermal-alkaline pre-treatment and internal recirculation was significantly improved, showing an increment to 285 mL/L/day in phase 2. Meanwhile, the VSS removal and methane production in phase 5 were greatly decreased when the raw sludge without any pre-treatment was applied to the combined process. Considering all together, it was concluded that the combined process with the thickened sludge recirculation and thermal-alkaline pre-treatment can be successfully employed for the highly efficient sewage sludge reduction and methane gas production.

A measure for activating BIM by actual application analysis of integrated utilization process of quantity, process(4D), and construction cost(5D) in view of life-cycle

  • Lee, Jae-Hong;Kim, Tae-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.25 no.12
    • /
    • pp.1-15
    • /
    • 2020
  • In this paper, we propose a novel method for converting the existing 2D processes in the design and construction phase of civil engineering, to the future BIM-based processes. First, we compare and analyze the actual application processes of the outputs of the existing 2D method and the outputs of the 3D BIM method, for the whole process of BIM design of earthworks and road structures and integrated utilization of quantity, process(4D) and construction cost(5D), in view of life-cycle. The proposed method acquire the outputs of the design phase integrating IFC international common standard file information and CBS/OBS/WBS standard classification scheme information, and acquire the outputs of the construction stage by using an integrated utilization module for quantity, process(4D) and construction cost(5D). Ultimately, we intend to commercialize the step by step technologies for BIM design and construction in civil engineering by using the proposed method.

항생제 생산을 위한 생물 공정상의 문제점

  • 노용택
    • The Microorganisms and Industry
    • /
    • v.16 no.2
    • /
    • pp.58-61
    • /
    • 1990
  • 항생제 생산을 위한 생물공정은 크게 3단계로 나뉠 수 있다. 우주균주 선발, 현장균주 보존및 현장 종균 공급을 위한 일련의 종균배양 과정을 Upstream이라 할 수 있고, 종모실로 부터 공급받은 종균을 현장에서 증식시키는 현장 종균배양 공정과 본 발효조에서의 항생제 생합성공정을 Mid-Stream, 발효가 끝난 상태의 배양액으로부터 균체, 세포내 및 세포외 불필요한 물질을 제거하고 항생제만을 회수, 정제하는 Down Stream으로 나뉠 수 있다. 따라서 항생제 발효는 좁은 의미에서는 본 발효조에서의 항생제 생합성공정을 가르키지만 넓은 의미에서는 위 전체 공정을 가르키는 말이기도 하다. 따라서 본 소고에서는 항생제 생산을 위한 생물 공정상의 문제점을 3분야로 나누어 제시하고자 한다. 실제로 항생제 공장을 건립하여 항생제 발효를 실시해 왔으며 그것을 좀더 나은 수준으로 개선하고자 꾸준히 노력해 온 당사에서의 경우를 그 예로 보아 문제점을 제시하고자 한다.

  • PDF