• Title/Summary/Keyword: 1 day strength

Search Result 638, Processing Time 0.036 seconds

A Study on Development of 1 Day Usable High Early Strength Concrete Using Hauyne C/K System Additives (아원계 조강재를 이용한 1일 공용 콘크리트 개발연구)

  • 박정준;백상현;신영훈;김병권;윤경구;엄태선
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1999.10a
    • /
    • pp.73-76
    • /
    • 1999
  • In recent, concrete material like specific cement and additives having many functions hsa been developed. In road pavement, ultra high early strength cement or organic material are used to open the road early, but there are many restrictions like workable time and special equipment. We aim to developed specific concrete which 1 day strength is over 300kgf/$\textrm{cm}^2$ to open the road within one day and workable time is maintained over 1 hour that can make the concrete ready mixed concrete. In this study, we are convinced if the ratio of hauyne clinker or its additive is increased early strength property is progressed and if the ratio of non hydrous gypsum is increased longtime strength is progressed. The concrete strength is 290-310 kgf/$\textrm{cm}^2$ at 1 day, 570-640 kgf/$\textrm{cm}^2$ at 28 day and the workable time is maintained over 30 minutes. As the results of this experiments We find out the possibility to developed the 1 day usable ready mixed concrete with high early strength.

  • PDF

A Study on the quality of High Early Strength Concrete as Whitetopping Materials (Whitetopping 포장재의 시험포설 및 시공품질에 대한 평가연구)

  • 임채용;엄태선;유재상;이종열;엄주용;조윤호
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2002.10a
    • /
    • pp.507-512
    • /
    • 2002
  • In road pavements, it is known that cement concrete pavement has superior durability. But in repairing pavement, cement concrete pavement is not usually applied because of the length of time while the road is interrupted when using Ordinary and Rapid-hardening Portland Cement. And Super High Early Strength Cement and Ultra Super High Early Strength Cement are not favorable for ready mixed concrete because of rapid setting time, high slump loss and other restrictions. We developed special cement developing 1 day strength of over 30.0N/$mm^2$ to open the road within 1 day and workable time is maintained over 1 hour so that it can be used as ready mixed concrete. We performed experimental overlay construction with concrete and evaluated the properties of the fresh and hardened concrete. The flexural strength was over 5.0N/$mm^2$ and the compressive strength was over 30N/$mm^2$ at 1 day. So it is thought that the road can be open to traffic within 1 day after placement.

  • PDF

A Study on the Effects of Molding Water Content and Cement Content on Unconfined Compressive Strength of Soil Cement Mixtures (시멘트함량 및 다짐함수비가 Soil Cement의 압축강도에 미치는 영향에 관한 연구)

  • 김재영;강예묵
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.17 no.1
    • /
    • pp.3685-3701
    • /
    • 1975
  • This study was conducted to investigate the strength of soil cements for varied molding water content and cement content(3,6,9,12%) in four cementstabilized soils(KY: sand, MH: sad, SS: sandy loam, JJ: loam). The eoperimental results obtainedfrom unconfined compressive strength tests are asfollows: 1. The optimum moisture content increased in accordance with the increase of the cement while maximum dry density didn't change uniformly. 2. The moisture content for maximum strength was higher than the optimum moisture content in the higher cement content. Moisture-density curves showed a dull peak in the higher cement contents, on the other hand, a sharp peak in the lower cement contents. 3. In molding the specimen with the approximate optimum moisture content, the maximum strength showed at the wet side of the optimum moisture content. 4. SS and JJ maybe used as cement-stabilized base of road to require 300PSI of compressive strength cured seven days, but MH and KY may be not adequate. 5. In soil cement, the better the grain size distribution was, the stronger the compressive strength was itn general. 6. The relation between 28-day strengh and 7-day strength in the cementstabilized four soils may be expressed as follows: q28=1.55q7+1.5 in which q28:28-day strength. q7:7-day strength.

  • PDF

A Study on Design of High Early Strength Cement and Concrete for Road Way Pavements (신속개방형 콘크리트 도로포장재의 설계를 위한 실험실적 평가 연구)

  • 임채용;엄태선;신국재;이종열;엄주용;조윤호
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.05a
    • /
    • pp.295-300
    • /
    • 2001
  • In road pavements, it is known that cement concrete pavement has superior durability, safety in compared with asphalt concrete pavement. But in reparing pavement cement concrete pavement is not usually applied because of the length of time while the road is interrupted when using Ordinary and Rapid-hardening Portland Cement. And Super High Early Strength Cement and Ultra Super High Early Strength Cement are not favorable for ready mixied concrete because of rapid setting time, high slump loss and other restrictions. We aim to develope specific cement and concrete developing 1 day strength of over 300 kg/$cm^{2}$ to open the road within one day and workable time is maintained over 1 hour that can be used as ready mixed concrete. In this study, we Produced cement using rapid-hardening cement, Hauyne clinker, anhydride gypsum and accelerator and studied on its properties. The concrete strength was over 300 kg/$cm^{2}$ at 1 day and 550 kg/$cm^{2}$ at 28 day and workable time was maintained for over 1 hour.

  • PDF

Early Prediction of Concrete Strength Using Ground Granulated Blast Furnace Slag by Hot-Water Curing Method (열수양생법에 의한 고로슬래그미분말 혼합 콘크리트의 강도 추정)

  • Moon Han-Young;Choi Yun-Wang;Kim Yong-Gic
    • Journal of the Korea Concrete Institute
    • /
    • v.16 no.1 s.79
    • /
    • pp.102-110
    • /
    • 2004
  • Recently, production cost of ready mixed concrete(remicon) has been increased due to the rising cost of raw materials such as cement and aggregate etc. cause by the upturn of oil price and increase of shipping charge. The delivery cost of remicon companies, however, has been decreased owing to their excessive competition in sale. Consequently, remicon companies began to manufacture the concrete by mixing ground granulated blast furnace slag(GGBF) in order to lower the production cost. Therefore, the objective of this study was to predict 28-day strength of GGBF slag concrete by early strength(1 day-strength, 7 day-strength) for the sake of managing with ease the quality of remicon. In experimental results, the prediction equation for 28 day-strength of GGBF slag concrete could be produced through the linear regression analysis of early strength and 28 day-strength. In order to acquire the reliability, all mixture were repeated as 3 times and each mixture order was carried out by random sampling. The prediction equation for 28 day-strength of GGBF slag concrete by 1-day strength(hot-water method) won the good reliability.

A new strength model for the high-performance fiber reinforced concrete

  • Ramadoss, P.;Nagamani, K.
    • Computers and Concrete
    • /
    • v.5 no.1
    • /
    • pp.21-36
    • /
    • 2008
  • Steel fiber reinforced concrete is increasingly used day by day in various structural applications. An extensive experimentation was carried out with w/cm ratio ranging from 0.25 to 0.40, and fiber content ranging from zero to1.5 percent by volume with an aspect ratio of 80 and silica fume replacement at 5%, 10% and 15%. The influence of steel fiber content in terms of fiber reinforcing index on the compressive strength of high-performance fiber reinforced concrete (HPFRC) with strength ranging from 45 85 MPa is presented. Based on the test results, equations are proposed using statistical methods to predict 28-day strength of HPFRC effecting the fiber addition in terms of fiber reinforcing index. A strength model proposed by modifying the mix design procedure, can utilize the optimum water content and efficiency factor of pozzolan. To examine the validity of the proposed strength model, the experimental results were compared with the values predicted by the model and the absolute variation obtained was within 5 percent.

A study on the change of limb muscle atrophy by the period of limited activities following the heart surgery in congenital heart disease children (선천성 심장질환아의 수술후 활동제한 기간에 따른 사지근 위축 변화에 관한 연구)

  • Choe Myoung Ae
    • Child Health Nursing Research
    • /
    • v.4 no.1
    • /
    • pp.17-30
    • /
    • 1998
  • In order to investigate the effects of a decreased activity on skinfold thickness, circumference and muscle strength of the extremities during the recovery period following heart surgery, skinfold thickness, circumference and muscle strength of the extremities were measured on days 0, 3, 6, and 9 following the surgery, and compared with those on the arrival day of intensive care unit. Skinfold thickness was measured using a skinfold caliper(Saehan Cor., Korea), circumference of the limbs were measured with a tape measure, upper extremity strength was determined using the Takei grip dynamometer and lower extremity strength was measured by pressing the flatfoot on an electronic digital health meter while tying on a bed. Results from this study were thus : 1. Skinfold thickness of triceps, quadriceps and gastrocnemius muscle on days 3, 6, 9 following the heart surgery was not significantly different from that of on the day of operation. 2. Circumference of midupperarm and midthigh on days 3, 6, 9 following the heart surgery was not significantly different from that of on the day of operation. Circumference of midcalf on days 3, 6 following the heart surgery was not significantly different from that of on the day of operation, while that of midcalf on day 9 following the surgery decreased significantly compared with that of on the day of operation. 3. Muscle strength of the upper extremity was not significantly different from that of on the day of operation, while that of the lower extremity on day 9 following the surgery decreased significantly compared with that of on the day of operation. From these results, it may be concluded that circumference and muscle strength of lower extremity can be decreased due to the postoperative inactivity following heart surgery in congenital heart disease children.

  • PDF

A Study on Evaluation of High Early Strength Concrete as Pavement Overlay Materials for Early Traffic Opening(2) (신속개방형 콘크리트 도로포장재의 설계를 위한 평가 연구(2))

  • 엄태선;임채용;유재상;이종열;엄주용;조윤호
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.11a
    • /
    • pp.233-238
    • /
    • 2001
  • In road Pavements, it is known that cement concrete pavement has superior durability, safety compared with asphalt pavement. But in repairing pavement, cement concrete pavement is not usually applied because of the length of time while the road is interrupted when using Ordinary and Rapid-hardening Portland Cement. And Super High Early Strength Cement and Ultra Super High Early Strength Cement are not favorable for ready mixed concrete because of rapid setting time, high slump loss and other restrictions. We aim to develope special cement and concrete developing 1 day strength of over 300 kg/$\textrm{cm}^2$ to open the road within one day and workable time is maintained over 1 hour that can be used as ready mixed concrete. In this study, we produced cement using rapid-hardening cement, Hauyne clinker, anhydride gypsum and accelerator and studied on its properties. The comperssive strength was over 400 kg/$\textrm{cm}^2$ and tensile at 1 day and workable time was maintained for over 1 hour.

  • PDF

A Study and Evaluation of Super High Early Strength Concrete as Pavement Overlay Materials for Early Traffic Opening(3) (신속개방형 콘크리트 도로포장재의 설계를 위한 평가 연구(3))

  • 임채용;엄태선;유재상;이종열;엄주용;조윤호
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2002.05a
    • /
    • pp.607-612
    • /
    • 2002
  • In road pavements, it is known that cement concrete pavement has superior durability, safety compared. But in repairing pavement, cement concrete pavement is not usually applied because of the length of time while the road is interrupted when using Ordinary and Rapid-hardening Portland Cement. And Super High Early Strength Cement and Ultra Super High Early Strength Cement are not favorable for ready mixed concrete because of rapid setting time, high slump loss and other restrictions. We developed special cement developing 1 day strength of over 30.0N/mm$^2$ to open the road within 1 day and workable time is maintained over 1 hour so that it can be used as ready mixed concrete. We performed experimental overlay construction with the cement and evaluated the mechanical property and the durability. At curing temperature of 8-l8$^{\circ}C$,the flexural strength was 6.4N/mm$^2$at 1 day, so that the road can be open to traffic within 1 day. In durability test, the hardened concrete showed higher durability than Portland cement concrete.

  • PDF

Effect of a decreased activity following THRA on circumference, volume and strength of normal and operated lower extremities (고관절 전치환술(Total Hip Replacement Arthroplasty) 환자의 수술후 활동저하가 하지근 위축에 미치는 영향)

  • 채영란;최명애
    • Journal of Korean Academy of Nursing
    • /
    • v.24 no.1
    • /
    • pp.115-128
    • /
    • 1994
  • The purpose of this study was to observe the change of circumference, volume and strength of normal and operated lower extremities on 3rd, 7th, 10th, and 14th days of postoperation following THRA compared with their condition on preoperation day. Subjects consisted of 13 male and 7 female Patients operated with THRA between the age of 20 and 69 years with a mean age of 38.55(SD=15.1). Circumference of upper and lower leg was measured by tape, leg volume was determined according to formula (Moor & Thornton, 1987) with measurement of 8 circumferences of leg. Leg strength was measured by pressing the center of digital health meter in supine position. The results can be summarized as follows : 1. Circumference of operated thigh decreased significantly at 14 following THRA compared with preoperative value, while that of normal thigh decreased significantly at day 3, 7, 10 and 14 after THRA compared with preoperative value. 2. Circumference of midcalf in both operated and normal limb decreased significantly at day 3, 7, 10 and 14 following THRA compared with preoperative value. 3. Leg volume of operated lower limb decreased significantly at 10, 14 following THRA compared with preoperative value, while that of normal limb decreased significantly at day 7 & 10 after THRA compared with preoperative value.4. Leg strength of operated limb decreased significantly at day 3, 7, 10, 14 following THRA compared with preoperative value. No significant difference of normal leg strength was shown following THRA. 5. Circumference of midcalf differed significantly at day 14 after THRA between normal and operated extremity. From these results, it can be suggested that a decreased activity after THRA caused muscle atrophies in normal and operated extremity.

  • PDF