• Title/Summary/Keyword: 환경개선예산

Search Result 192, Processing Time 0.025 seconds

Improvement plan and factual survey for weirs, drop structures and bridges in medium scale streams of Kyonggi province (경기도 지방하천에서의 보, 낙차공 및 교량 시설물의 실태 및 개선 방안 제시)

  • Noh, Huiseong;Ahn, Taejin
    • Journal of Wetlands Research
    • /
    • v.22 no.1
    • /
    • pp.31-38
    • /
    • 2020
  • Weirs are to secure amount water of streams and drop structures are to enhance stabilization of stream bed and bridges are to connect isolated region, which are called stream crossing structures. In the stream design criteria, directions for minimum size of structures are suggested to secure stability of stream crossing structures. However the sizes of almost all existing weirs and drop structures are not satisfied with the stream design criteria and only 22 percent of the peirs of bridges are satisfied. To enhance hydraulic stability of existing weirs and drop structures, it is required that the ratio of bed protection to apron should be above 3.3. According to factual survey of structures in the sample streams, it has been shown that the longitudinal slope of rapid works with 1:20 is the most reasonable to design velocity if existing weirs and drop structures are rehabilitated into rapid works. It has been known that violating freeboard and span length of piers should make existing bridges reconstructed or removed. However, comprehensive review including deterioration level of bridges, special regulation for span length, etc. should be considered to determine rehabilitation plan of bridges. In this study, a procedure has been suggested to improve hydraulic stability of weirs, drop structures and piers of bridges. Sound environment of stream and reduction of natural disaster could be achieved by improving stability of cross structures, which could be obtained by governmental budget and active stream management including observance of design criteria.

Establishment of Overseas Expansion Support Policy for Green/Climate Technology SMEs: Integrated Viewpoints of Policy Makers and Beneficiaries (녹색/기후기술 중소기업의 해외진출 지원정책 수립 : 정책수혜자와 정책수립자 통합관점)

  • Kim, Sun-Hye;Oh, Myeong-Ji;Lee, Su-Yeong;Yoon, Byung-Un
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.7
    • /
    • pp.201-211
    • /
    • 2020
  • Green/climate technology has been emphasized as a growth engine that can boost the global economy via environmentally friendly products. Recently, SMEs in Korea have been recognized as a critical actor in the globalization of green/climate technologies. However, there has been no survey and few studies on the satisfaction level of the support for the overseas expansion of SMEs in the green/climate technology field. Therefore, this study aims to support a policy for the establishment of SMEs' green/climate technology by investigating and analyzing expert opinions on SMEs. Through a literature survey, support policies were classified into four types, and then according to the types, satisfaction factors and obstacle factors for overseas expansion were derived and analyzed. In the results, the SMEs overall showed low levels of awareness and satisfaction and were found to be struggling due to all obstructive factors. In addition, the most important success factor for overseas expansion was found to be the policy related to funding support. Thus, it is necessary to improve the accessibility, advertisement, and support strategies of support policies, and in particular, appropriate budget allocation should be made available by considering the characteristics of companies.

Estimation of Design Service Traffic Volume for 2+1 Roads Based on Korean Two-Lane Highway Conditions (국내 2+1차로 도로의 적정 교통량 및 계획기준 개발)

  • Lee, Dong Min;Chae, Chan Dle;Cho, Hanseon;Lee, Suk Ki
    • Journal of Korean Society of Transportation
    • /
    • v.31 no.2
    • /
    • pp.3-10
    • /
    • 2013
  • Two-lane roads that occupy more than a half of rural highways in Korea have operational problems such as traffic congestion problems due to relatively high traffic volume and safety problems due to overtaking risks in two-lane highways. To solve these problems, a 2+1 road pattern that enables to improve traffic safety and operational efficiency of two-lane highways has been applied in Europe. In this study, in-depth applicability of 2+1 roads to Korean rural highways was investigated based on review results of the successful experience of European 2+1 roads. Then, given the Korean two-lane highway conditions, the service traffic volumes for Korean 2+1 roads was estimated. The analysis results showed that 17,000 veh./day might be the maximum traffic volumes for Korean 2+1 roads.

Study on the Research and Education (R&E) Programs in the Science High Schools and Gifted High Schools: Focusing on the Current Status (과학고 및 영재고 Research and Education (R&E) 운영 현황 및 실태 분석)

  • Jung, Hyun-Chul;Chae, Yoo-Jung;Ryu, Chun-Ryol
    • Journal of Gifted/Talented Education
    • /
    • v.22 no.3
    • /
    • pp.597-617
    • /
    • 2012
  • The purpose of this study was to investigate the current status of Research and Education (R&E) program. The sample included 21 high schools(18 science high schools and 3 gifted high schools) and 1,466 students and 310 mentors. The results are as follows. Total 502 R&E projects were planned and completed. 72.1% of the total research works were guided by professors only, 23.3% were guided by teachers only, and 4.6% were guided by professors and teachers together. Total R&E mentors were 861(385 professors and 476 teachers) and mentees were 2,168. The total budget of 2011 R&E was approximately 4.5 billion won. The needs for program improvement R&E were as follows. 1) When selecting R&E topics, mentors need to consider students' current knowledge level and school curriculum. 2) Mentors should provide enough opportunities to master topic-related basic knowledge. 3) The performance should be monitored periodically. 4) The support for continuous research and improvement of research environment were requested.

Economic Evaluation System for Deteriorated Military Facilities (노후 군시설물의 경제성 평가 시스템)

  • Jang, Won-Suk;Lim, Tae-Kyung;Lee, Dong-Eun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.2
    • /
    • pp.181-192
    • /
    • 2013
  • Given both structural safety and economic benefits of aging facilities, remodelling of the existing facilities is preferable to reconstruction. This recognition provides an opportunity to reduce the commitment of resources and national budget. However, when a subordinate troop asks for remodeling or reconstruction of a deteriorated facility, it is difficult to ensure the consistency and objectivity in the process of decision making for the alternatives due to the absence of systematic and quantitative rating methodology. Their economic evaluation methodology only exists in a manual format. Thus, further research is required for converting the methodology into an automated system in view of practicality such as rapid and accurate data processing. The contributions of this study are as follows: 1) Literature review found out a representative economic evaluation model focused on military facilities, and comparative analysis with a similar study identified the strength and weakness. 2) this study presented how to convert the theoretical framework which enables to solve a specific subject matter into an automated system. 3) it developed a user friendly interfaces which consist of four functional modules by considering the usability and accessibility of the system user. 4) the developed system was verified by a case study in terms of four kinds of performance indicators.

Time Series Analysis and Forecast for Labor Cost of Actual Cost Data (시계열분석을 통한 실적공사비의 노무비 분석 및 예측에 관한 연구)

  • Lee, Hyun-Seok;Lee, Eun-Young;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.24-34
    • /
    • 2013
  • Since 2004, the government decided to gradually introduce Actual Cost Data into cost estimate for improving problems of below-cost tendering and to reflect fair market price through competition and carry contract efficiently. However, there are many concerns that Actual Cost Data has not reflected real market price, even that has contributed to reduce the government's budget. General construction firm's burden for labor cost is imputed to specialty contractors and eventually it becomes construction worker's burden. Therefore, realization of Actual Cost Data is very important factor to settle this system. To understand realization level and make short term forecast, this paper drew construction group of which labor cost constitutes more than 95% of direct cost, and compares their Actual Cost Data with relevant skilled workers's unit wage and predicts using time series analysis. The bid price which is not be reflected market price accelerates work environment changes and leads to directly affect such as late disbursement of wages, bankruptcy to workers. Therefore this paper is expected to be used to the preliminary data for solving the problem and establishing improvement of Actual Cost Data.

A Study on the Architecture Modeling of Information System using Simulation (시뮬레이션을 이용한 정보시스템 아키텍쳐 모델링에 관한 연구)

  • Park, Sang-Kook;Kim, Jong-Bae
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2013.10a
    • /
    • pp.455-458
    • /
    • 2013
  • The conventional design of the information system architecture based on the personal experience of information systems has been acted as a limit in progress utilizing appropriate resource allocation and performance improvements. Architecture design depending on personal experience makes differences in variance of a designer's experience, intellectual level in related tasks and surroundings, and architecture quality according to individual's propensity. After all these problems cause a waste of expensive hardware resources. At working place, post-monitoring tools are diversely developed and are running to find the bottleneck and the process problems in the information operation. However, there are no simulation tools or models that are used for expecting and counteracting the problems at early period of designing architecture. To solve these problems we will first develop a simulation model for designing information system architecture in a pilot form, and will verify validity. If an error rate is found in the permissible range, then it can be said that the simulation reflects the characteristic of information system architecture. After the model is developed in a level that can be used in various ways, more accurate performance computation will be able to do, getting out of the old way relying on calculations, and prevent the existence of idle resources and expense waste that comes from the wrong design of architecture.

  • PDF

Mitigation Plan for Expectation-Performance Gap of Information Systems Audit Services (정보시스템 감리서비스의 기대-성과 차이 완화 방안)

  • Ji, Kyoung Sook;Kim, Hee Wan
    • Journal of Service Research and Studies
    • /
    • v.10 no.3
    • /
    • pp.67-80
    • /
    • 2020
  • The information system audit service has been recognized for its effectiveness in improving the management efficiency of informatization projects in the public sector and improving the quality of information systems. However, according to several recent studies, it is not very helpful in securing quality by indicating formal audit performance and incorrect functions or errors in a short audit period. So, if the effectiveness of audit is proved to ensure the quality of the information system from the perspective of the software life cycle and to successfully operate and maintain it, the use of audit for the successful construction of the information system will be an essential factor. Therefore, this study investigated whether the current audit service users are satisfied with the current information system audit and what they expect. If it is different from what was expected, the difference between expectations and performance was analyzed to improve user satisfaction, and a survey was conducted through interviews with experts in the information system field. Based on the empirical results through the questionnaire, in order to reduce the difference in expectations from the user's point of view in the information system audit service, a plan to improve the audit system suitable for the new audit environment was proposed.

Police Officers' Cognitions of Police Investigation Specialization (수사경과제에 대한 경찰공무원의 인식)

  • Choi, Mu-Chan
    • The Journal of the Korea Contents Association
    • /
    • v.9 no.6
    • /
    • pp.289-299
    • /
    • 2009
  • This study set out to analyze the perceptions of investigative police officers and division police officers regarding Police Investigation Specialization, which had been in effect for four years, identify the problems, and search for alternative policies. The results led to the following alternative policies; first, the communication among the members should be facilitated by trading the jobs between investigative policemen and division members in certain percentage regularly, integrating job education and special work, and developing diverse support programs for detective activities to provide them with opportunities to experience and understand investigation. The second suggestion concerns the investigation members' morale. There should be a range of measures to boost their moral such as allocating separate budget and personnel to support the investigation department and the treatment of major criminal and civil cases, giving each investigation team an office and investigation room to improve their working environment, readjusting the promotion ratio of Police Investigation Specialization to introduce a promotion system proper for each investigation's characteristics. The third suggestion is to secure job efficiency. It's required to reinforce the current short-term specialized education program to bring up practical and professional investigators, open the certification exam of professional investigators to all members so that every policeman can have their abilities recognized and approved as long as they have the demanded capabilities, and create a system of shedding off the members idle at work by reflecting low performance records when evaluating the members to decide who to dismiss from Police Investigation Specialization. And finally, it's important to divide duties rationally. The rationality of duties division can be guaranteed by setting the guidelines for direct handling for the team leader to help him devote himself to his duties, defining objective criteria of measuring investigation workload, and creating devoted systems and teams for simple and small accidents so that experienced investigators can deal with high-profile cases.

A Study on Management and Present-Condition of Invasive Alien Species (외래식물 분포 및 관리방안)

  • Park, Sang-Heon;Lee, Hae-Seung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.11
    • /
    • pp.488-496
    • /
    • 2018
  • This study examined the Gangwon Province's current implementation of its elimination of invasive plants and explored a plan to effectively manage invasive plants. The percentage of the distribution of the plants was 39.6% for riverside areas, 23.3% for roadside areas, 12.4% for roadside & riverside areas, and 4.6% for areas around farm land and river banks. To ensure the systematic management of invasive plants, the current study suggests a) developing an invasive plants monitoring and management system; b) reinvigorating the participation of residents, private organizations, and military posts; c) planting of native replacement plants and the conversion of the locations as attractions, and d) nurturing the project for using invasive plants. For policy directions to be pursued based on the results of the study, the following are suggested: a) improving laws and systems regarding invasive plants, b) developing a cooperative system for managing invasive plants, c) implementing the training of civilian professionals, d) implementing the elimination of invasive plants, e) developing replacement plants for cities and counties, f) fostering industries that tap into invasive plants, and g) using the Han River Water System Management Fund for funding and greater efficiency.