• Title/Summary/Keyword: 화약발파

Search Result 873, Processing Time 0.02 seconds

Explosive Demolition of Special Structure of Soongeui Complex Stadium (숭의종합운동장 특수구조물 발파해체)

  • Suk, Chul-Gi;Park, Hoon;Kim, Nae-Hoi;Song, Young-Suk;Jung, Woo-Jin;Han, Dong-Hun
    • Explosives and Blasting
    • /
    • v.28 no.2
    • /
    • pp.108-118
    • /
    • 2010
  • Soongeui complex stadium is a reinforced concrete frame structure composed of columns, slabs and beams. The stadium, however, is also a special structure because it has a tall tower of electronic display board and slabs inside its own structure which is different from the structures that had been demolished using blasting by then. Explosive demolition for the stadium was carried out from the left-hand side of the outfield stand to the right considering 2 rows of columns supporting the stand as a blasting unit. An overturning demolition method was applied to the tower of electronic display board. Water bags that played the role of multipurpose protection were applied to control the dust. As a result, the demolition project of the special structure of Soongeui complex stadium was judged to be a great success.

A Case Study on the Prediction of Underwater Sound by Measuring Ground Vibration (지반진동 측정을 통한 수중소음 예측 및 관리 적용사례)

  • Lim, Dae-Kyu;Cho, Kwang-Hyun;Jun, Yang-Bae
    • Explosives and Blasting
    • /
    • v.28 no.2
    • /
    • pp.86-98
    • /
    • 2010
  • As the quality of life is being upgraded, the public complaints about noise and vibration from construction sites are growing. Despite the disputes over the blasting damage on aquatic lives in river, ocean, and aquarium near construction sites tend to increase, most of existing solutions or regulations on the damages caused by blasting are established for the damages on land. Although the estimated amount of damage is up to several millions of USD, there is no guideline for resolving the dispute related to the underwater vibration. This paper presents an example where the public grievance about the underwater noise was successfully resolved by elucidating the characteristics of underwater sound, deducing the correlations between ground vibration and underwater sound during blast, and predicting the underwater sound level during blasting from the ground vibration measured on the ground near an aquarium basin.

Pre-weakening Analysis for the Explosive Demolition on the Structural System Consisted of Load Bearing Wall (내력벽으로 구성된 구조물의 발파해체를 위한 사전취약화 해석)

  • Choi, Hoon;Hong, Soon-Joong;Mun, Byung-Hwa;Kim, Hyo-Jin;Yoon, Soon-Jong
    • Explosives and Blasting
    • /
    • v.28 no.2
    • /
    • pp.76-85
    • /
    • 2010
  • In this paper, we present the result of an analytical investigation concerning the demolition range for the pre-weakening of load-bearing wall in explosive demolition. Pre-weakening of load-bearing wall is usually conducted based on field experience because reliable specifications or guidelines for the design of pre-weakening have not yet been established in Korea. This study is one of the efforts to develop such a reliable specification or guideline for the pre-weakening process. Hence, the focus of the study is on the estimation of pre-weakening range of load-bearing wall. For the purpose, a finite element analysis (FE analysis) was conducted, and a pre-weakening range of load-bearing wall was suggested based on the analysis result.

Case Study for the Improvement of Tunnel Advance Rate & the Time Reduction of Working Process in Long Hole Blasting About Tunnel Excavation (터널 장공발파에서 굴진율 개선 및 작업공정 시간 단축 사례)

  • Kim, Hee-Do;Lee, Jun-Won;Lee, Ha-Young
    • Explosives and Blasting
    • /
    • v.31 no.2
    • /
    • pp.32-39
    • /
    • 2013
  • Generally, The way of long hole blasting is carried out in coal-face, basic excavation for dam, mine etc. Recently, this long hole blasting has been implemented in civil engineering for efficiency & economic feasibility. National express no.600 of Pusan outer high-express ${\bigcirc}$ construction site with four lanes of the length of 8km was also a site applied by long hole blasting. But After blasting, tunnel advance rate is less than 75%. As a result of that, Follow-up working time is influenced. Thereby, The total of working process is significantly so increased that planned excavation cannot be implemented many times. For not only improve excavation rate but reduce working process time in job site, we introduce blasting case which apply the ${\phi}36mm$ explosive suited for high desity of charging among long hole blasting in order to overcome mentioned problem.

Determining Parameters of Dynamic Fracture Process Analysis(DFPA) Code to Simulate Radial Tensile Cracks in Limestone Blast (석회암 내 방사상 발파균열을 예측하기 위한 동적파괴과정 해석법의 입력물성 결정법에 관한 연구)

  • Kim, Hyon-Soo;Kang, Hyeong-Min;Jung, Sang-Sun;Kim, Seung-Kon;Cho, Sang-Ho
    • Explosives and Blasting
    • /
    • v.31 no.2
    • /
    • pp.6-13
    • /
    • 2013
  • Recently, complaints or environmental problems caused by the noise and dust generated from crusher of the mine and quarry are emerging. Therefore mining facilities such as crushers and mills have been installed in an underground. In order to facilitate crusher equipments in the underground, excavation of large space is required and then the stability of the large space underground structure is an important issue. In this study, the blast experiments, which use a block of the limestone, are performed. Based on the blast experiments, the numerical model was prepared and simulated using dynamic fracture process analysis code(DFPA) with considering the rising time of applied borehole pressure and microscopic tensile strength variation. Comparing the non-dimensional crack length and no-dimensional tensile strength obtained from blast experiments and numerical analyses, the input parameters of DFPA code for predicting a radial tensile crack in limestone blasting were determined.

A Study on the Nano-Plasma Rock Breaking Blasting Method Using Rapidly Expansive Metal Mixture (급팽창 금속혼합물을 이용한 나노프라즈마 바위 파쇄공법에 관한 연구)

  • Kim Sung-Kook;Ahn Myung-Seog;Cho Myung-Chan
    • Explosives and Blasting
    • /
    • v.23 no.3
    • /
    • pp.57-74
    • /
    • 2005
  • In the past, explosives like dynamite was used to blast rock. However, today it is difficult to use explosives in urban blastinglike excavation for subway, building, and housing land. According to Korea Department of Construction and Transportation's proposal for blasting design manual and test blasting, from TYPE I blasting to TYPE IV blasting are recommended when we determine 0.3cm/sec(centisec) as a maximum allowable ground vibration with a distance between $25m\~120m$ from structures. This article was written to introduce one of TYPE I (reck blasting within 25m from structures) blasting method, Nano-Plasma blasting method. When Nano-Plasma blasting method is applied in urban blasting job, ground vibration (15m away from blasting point) is expected 0.1cm/sec, which is only half of a ground vibration when low ground vibration blasting method is applied. By this unique characteristic, Nano-Plasma blasting method is epochal urban blasting technique.

A Study of Cutting Method of H-Pile for Explosive Demolition of SRC Structure (철골구조물 발파해체를 위한 H형강 절단방법에 대한 연구)

  • Min Hyung-Dong;Lee Yun-Jae;Song Young-Suk;Kim Hyo-Jin
    • Explosives and Blasting
    • /
    • v.23 no.3
    • /
    • pp.83-89
    • /
    • 2005
  • It follows in deterioration of the steel frame structure and becomes remodeling and removal. The construction work characteristic, economical efficiency and stability environment characteristic are planned and considered hereafter control plan of the steel frame structure which is deteriorated currently to cutting mettled plentifully sued on gas cutting of H beam. However it will not be able to apply from the explosives demolition which is makes a weak instantaneously and then collapses the building at the time. In this study, shape charge was used for cutting of the H-beam. That is the element testing to estimate explosives demolition for steel frame structure. As a result, it is found for single-side rutting method, both-sides rutting methods by H-beam thickness and pre-rutting process. It confirmed an affix method and an ease characteristic by fixing tool. Also, it is shown that air blasting decreased about 8dB(A) in order to reduce air blasting used by sand box. However, it will be required to reduce air blasting little more because explosives demolition will be done in urban site.

A Case Study on the Construction of Concrete Lining in Parallel with Blasting in a Long Tunnel (장대터널 굴착시 발파-라이닝 병행시공 사례연구)

  • Ryu Joung-Hoon;An Hyung-Jun;You Jin-O;Choi Byung-Hee
    • Explosives and Blasting
    • /
    • v.24 no.1
    • /
    • pp.39-48
    • /
    • 2006
  • The various alternatives to reduce the construction period and cost in the wide and long tunnel have been attempted recently. However, the concrete lining forming process after finishing tunnel excavation may delay construction period considering the specific conditions of the wide and long tunnel. The concrete lining is indispensible for the road tunnel. For this reason, the blasting-lining synchronizing study had been carried out to reduce construction period in the Gyea-Ryong Tunnel. Lining models were installed at four different distance conditions the floor of the tunnel. After model installation, hundreds of blasting vibration measurements and concrete material tests were performed to calculate the safe distance between blasting point and concrete lining form. The study also introduces a method which can obtain the better ability of construction by improving working environment with the ventilation and the relocation of tunnel equipments in the working places.

Blast Design Technique Using the Bulk Emulsion Explosives in Tunnel (터널에서 벌크에멀젼 폭약을 이용한 발파설계기법 연구)

  • Lee Jin-Moo;Lee Heoy;Lee Sang-Hun;Kim Hee-Do;Choi Sung-Hyun
    • Explosives and Blasting
    • /
    • v.24 no.1
    • /
    • pp.29-37
    • /
    • 2006
  • The demand of the bulk emulsion explosives is being increased more and more by using the mechanization loading system in a domestic tunnel sites. Thus, a rational design criteria that is suitable for rock and circumstance condition has been required. In this study, authors investigated a optimum specific charging weight and resonable charging weight based on domestic blasting construction cases, which were performed by using a mechanization bulk emulsion explosives loading system up to now. Authors also analyzed the blasting results and got the following formula $({\Upsilon}= 0.669 + (0.0154{\times}RMR),\;r=0.81)$ from the relationship between a optimum specific charging weight of bulk exp. and rock mass rating. A range of resonable charging weight with a drilling depth is calculated considering a rock conditions.

A Study on the effective Oscillation Characteristics of the Constructions of Blasting Operations in Seaside (수중 발파시 인근 구조물에 미치는 진동의 영향 연구)

  • Lee, Sin;Kang, Dae-Woo;Park, Hak-Bong
    • Explosives and Blasting
    • /
    • v.19 no.1
    • /
    • pp.71-84
    • /
    • 2001
  • Korean peninsula has the most mountainous areas such as mountains and hilly country, and it is surrounded by the sea on all sides but one. In this respect, a large scaled construction works have frequently been conducted. However, it is not easy to porform a large scale blasting work without giving any harm to houses or facilities nationwide. Therefore, blasting work becomes more closely related to maintenance thing due to the development of the downtown or a large structure for key facilities. Many researches on blast in the open space and tunnel blasting have been conducted. On the contrary, research on underwater blasting operations is comparatively scanty even though much more necessity of marine development is required. In this respect, this study aims to investigate the characteristics of underwater blasting operations and to make a comparative study with blast in the open space. As a result of examining into the characteristics during underwater blasting operations, the around oscillation in case of underwater blasting operations shows significantly low compared to that in case of blast in the open space, and this means that much more cautious altitude must be taken in designing underwater blasting operations compared to the design of blast In the open space. As a result of analysis on the difference between a square root and a cube root In the equation of estimating oscillations in the actual site, it is shown that it is shown to apply a square root for the estimation of oscillation at 60 meters in case of underwater blasting operations and at 22 meters case of general blast in the open space.

  • PDF