• Title/Summary/Keyword: 호남고속철도

Search Result 96, Processing Time 0.03 seconds

Study on the mutual interference of mixed mode operation between KTX and AREX train at the airport linked line (공항철도연계 구간의 고속열차(KTX)와 전동열차(AREX) 혼용운용에 따른 ATP지상설비간 상호간섭 영향에 관한 연구)

  • Kim, Su-Bong;Song, In-Kuen
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.7
    • /
    • pp.23-30
    • /
    • 2016
  • ccording to the airport railroad linkage facility expansion project constructing a connecting line to the airport railway and improving the signal system and Gyeongui Susaek Station, a high-speed train is able to run directly from Gyeongbu and Honam to the airport railway. According to mixed operation of high-speed Korea Train Express (KTX) and Airport Railroad Express (AREX) trains, to establish ERTMS/ETCS L1 ATP to operate the KTX train, the signaling system of the AREX train is the same as the existing ATC/ATO, but its operation became impossible because the high-speed train causes mutual interference between the "high-speed train (KTX) and AREX ground signaling equipment" and between the "AREX train and KTX (high-speed train) ATP ground equipment." Thus, it was necessary to have a supplemental technical interference analysis comparing the characteristics of the AREX beacon and the KTX balise. So, we resolve the problems of mutual interference between the "high-speed train (KTX) and AREX ground signaling equipment" and between the "AREX train and KTX (high-speed train) ATP ground equipment" with a test using an actual train, and we confirm the technical validity with three types of test module.

Field Measurements to Predict the Wind Gust under Train at the Speed-up of Conventional Railway Lines (기존선 고속화 시 열차 하부 열차풍 예측을 위한 현장 측정 시험)

  • Kwon, Hyeok-Bin;Nam, Seong-Won;Ko, Tae-Hwan;Jeon, Byung-Kill;Kim, Man-Cheol
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.4
    • /
    • pp.376-381
    • /
    • 2010
  • In this study, field measurements on KTX, Nuriro and TTX train have been conducted at Kyeongbu and Honam line to predict the wind gust under train at the speed-up of major conventional railway lines using Kiel-probe array and multi-channel pressure scanning system. The results show that the average wind velocity during train passage normalized by train speed is independent to train speed, thus the wind gust for a given train type at the speed-up condition could be predicted. The relationship between the shape of underbody and the characteristics of the underbody wind gust has been discussed.

The Analysis on Competitiveness of Railroad Transport Focused on Container, Cement, Steel (컨테이너, 양회, 철강을 중심으로 한 철도의 화물수송경쟁력 분석)

  • Kim, Eun-Mi;Park, Dong-Joo;Ko, Young-Seung;Kim, Hyun-Seung;Park, Hyeong-Jun
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.5
    • /
    • pp.613-622
    • /
    • 2009
  • The modal spilt of highway has been increased and the one of railway has been decreased from 17.2%(1990) to 6.3%(2006). In this context, it is meaningful to examine the competitiveness of the railroad of Korea. The objective of this study is to analyze the competitiveness of railroad with the highway so that countermeasures improving the competitiveness of railroad could be suggested. For this, firs of all, indicators representing the competitiveness of the railroad transport are determined. The main influencing factors for mode choice include transport time, transport cost and level of service. Three types of commodity, container, cement and steel are the target for the analysis. It was found that the overall competitiveness of railroad transport is weaker compared with highway even for the main freight origin-destination pairs. It means that the freight transport system is focused on road rather than railroad. Therefore, we need to remeasure the competitiveness of railroad transport related to methods for freight railroad competitiveness improvement.

A Study on Estimation of Air Tightness for Train (철도차량의 공기압 기밀도 평가에 관한 연구)

  • Nam, Seong-won
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.5
    • /
    • pp.576-584
    • /
    • 2016
  • In this study, we measured the air tightness of a train using pressure variation in tunnels. To estimate the air tightness of a train is essential to comprehend the pressure variation of the cabin because air tightness is strongly related with ear discomfort. If we can determine the air tightness, we can predict the pressure variation of the cabin. Also, ear discomfort is a problem that can be caused in a high speed train, as well as in Korea's Great Train Express. In this study, we compared the various international standards for ear discomfort and estimated the air tightness of each vehicle based on experimental data obtained using the ITX, KTX and KTX-sancheon(honam) vehicles. The internal pressure variation of the trains is numerically calculated using the air tightness value. The results are good compared to the experimental results. Instead of flap type ventilation, in the future, continuous ventilation equipment will be needed for speed-up.

Analysis of Dynamic Response Characteristics for KTX and EMU High-Speed Trains on PSC-Box Railway Bridges (PSC-box 철도교량의 KTX 및 EMU 고속열차에 대한 동적 응답 특성 분석)

  • Manseok Han;Min-Kyu Song;Soobong Shin;Jong-Han Lee
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.28 no.2
    • /
    • pp.61-68
    • /
    • 2024
  • The majority of high-speed railway bridges along the domestic Gyeongbu and Honam lines feature a PSC-box type structure with a span length ranging from 35 to 40m, which typically exhibits a first bending natural frequency of approximately 4 to 5Hz. When KTX high-speed trains transverse these bridges at speeds ranging from 290 to 310km/h, the vibration induced by the trains approaches the first bending natural frequency of the bridge. Furthermore, with the upcoming operation of a EMU-320 high-speed train and the anticipated increase in the speeds of these high-speed trains, there is a need to analyze the dynamic response of high-speed railway bridges. For this, based on measured responses from actual railway bridges, a numerical model was constructed using a numerical model updating technique. The dynamic response of the updated numerical model exhibited a strong agreement with the measured response from the actual railway bridges. Subsequently, this updated model was utilized to analyze the dynamic response characteristics of the bridges when KTX and EMU-320 trains operate at increased speeds. The maximum vertical displacement and acceleration at the mid-span of the bridges were also compared to those specified in the railway design standard with the increasing speed of KTX and EMU-320.

Study on the Behavior of Curved Track in Honam High-Speed Line considering the Running Performanace for HEMU 430-X (HEMU 430-X 주행특성을 고려한 호남고속철도 곡선궤도구조의 거동연구)

  • Kang, Yun-Suk;Um, Ki-Young;Kim, Seog-Won
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.8
    • /
    • pp.4068-4076
    • /
    • 2013
  • The wheel-rail interaction forces are influenced by the velocity of vehicle, wheel load, alignment (curve radius, cant etc). For the safety of track structure, it is required to evaluate the influences for track and influential factors. Recently, the HEMU 430-X, which was developed by Next Generation High-Speed Rail Development R&D Project, achieved 421.4km/h in a test run of Daegu.Busan section of the Gyeongbu high speed rail on March in 2013. In the case of additional speed-up test on Test-Bed Section(Gongju.Jeongeup: KP 100~128km Osong starting point), the analysis of track forces is required for outer rail by the increase of dynamic force and centrifugal force of vehicle. In this paper, the vehicle speed variation on HSL line is evaluated by TPS analysis considering the tractive effort of HEMU 430-X, tested running resistance and alignment of Honam HSR. And the track forces are evaluated by centrifugal force and impact factor on curved track.

Estimation of Soft Ground Characteristics using the Piezo-Cone Penetration Tests(CPTu) on Honam High-Speed Railway Planning Line (호남고속철도 계획노선에서의 피에조콘 관입시험(CPTu)에 의한 연약지반 특성 평가)

  • Lee, Il-Wha;Kwon, Oh-Jung;Kwen, Jin-Su;Min, Kyoung-Nam
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1796-1801
    • /
    • 2007
  • Piezocone penetration testing(CPTu) results such as cone resistance$(q_c)$, sleeve friction$(f_s)$, and pore pressure(u), have been carried out at 5 sites in Honam high-speed railway areas of Korea, in order to continuously estimate the characteristics of soil layers and the undrained shear strength$(S_u)$ in a soft ground. For the applications of the conventional CPTu results to undrained shear strength, the cone factors$(N_{kt})$ were deduced based on Field vane tests, and Monte-Carlo Simulation(MCS). Moreover the correlations of the undrained shear strength of CPTu by soil depths were compared and revised with the results of triaxial compression(UU test), field vane and Dilatometer tests(DMT). The depths of soft foundation at 5 sites in Honam high-speed railway areas were calculated based on the results of the various field tests in addition CPTu. The applicability of CPTu for a soft foundation criterion referred to the criteria of high-speed railway and related agencies in Korea was evaluated.

  • PDF

Analysis of the Relationship between Concrete Slab Track Life and Secondary Compression Characteristics in Soft Clay (점토의 2차 압축특성과 콘크리트궤도 수명과의 상관성 분석)

  • Lee, Sang-Cheol;Cho, Kook-Hwan
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.2
    • /
    • pp.195-203
    • /
    • 2016
  • Concrete slab track was applied to the Gyeoungbu High Speed Railroad step 2 and the Honam High Speed Railroad. Concrete slab track incurs higher construction cost and lower maintenance cost than existing gravel track. For these reasons, the use of concrete slab track has increased in Korea. The biggest problem in the use of concrete slab track is repairing damage from settlement that can occur while trains are in service. High speed railroad design standards require allowable residual settlement of concrete slab track of less than 25mm. In order to satisfy the requirement of long term stability of concrete slab track, it is necessary to manage the secondary compression settlement within the allowable residual settlement. This study is to evaluate the secondary compression settlement with the variation of the secondary compression index, thickness of soft ground, and concrete slab track life. Statistical analysis is performed to determine the probability of distribution of areas where serious problems will be caused after the concrete slab track is constructed.

Railroad Noise and its Impact (철도소음과 그 영향)

  • 강대준;나진균
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 1995.04a
    • /
    • pp.100-109
    • /
    • 1995
  • 철도는 대량수송 및 정시제 운행이라는 중요한 역할을 하면서도 다른 한편으로는 철도연변에 거주하고 있는 사람들에게 상당한 소음공해를 미쳐 정온한 생활환경을 누릴 권리를 침해하고 있음에도 불구하고 철도소음을 관리하는 기준이나 대책등이 아직 미미한 실정이다. 향후 5년 내에는 고속철도의 등장도 확실하지만 기존 재래식 철도에 대한 소음 실태 자료마저 충분치 않아 철도연변의 소음진동 문제를 해결하기 위한 기본적 수단인 소음 기준 제시를 위해서는 폭넓은 기초 자료확보와 새로운 관련연구가 요청되었다. 이러한 필요성에 따라 전기기관차를 중심으로 영동선, 중앙선, 태백선, 경인선, 경원선 및 대도시 도심지를 관통하는 호남선 및 경부선 중에서 측정환경이 양호한 22개 지역을 선정하여 기존 철도의 구간별 30분, 1시간, 2시간, 3시간 등가소음도를 측정하였고 선로의 조건, 열차의 종류 및 속도, 거리권별 등에 따른 개별열차 통행시의 소음특성을 조사하여 철도소음의 기준 설정과 방지대책 강구시에 활용할 수 있도록 하며, 열차 통행속도로부터 최고소음도를 추정하여 주변지역의 등가소음도를 산정할 수 잇는 예측식을 도출하여 측정방법 개정에 활용하고, 그리고 선로변에 위치한 공동주택을 대상으로 층별 철도소음 노출도와 열차통과시의 공동주택 실내.외의 소음도를 비교조사하여 벽체 차음 효과를 조사하였고 철도소음에 대한 주민반응 조사를 하였다.

  • PDF

A study on quantitative risk assessment for railway Tunnel fire (철도터널에서 차량화재시 정량적 위험도 평가에 관한 연구)

  • Yoo, Ji-Oh;Nam, Chang-Ho;Jo, Hyeong-Je;Kim, Jong-Won
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.12 no.4
    • /
    • pp.307-319
    • /
    • 2010
  • As we learned in Daegu subway fire accident, fire in the railway tunnel is prone to develop to large disaster due to the limitation of smoke control and smoke exhaust. In railway tunnel, in order to ensure fire safety, fire prevention and fighting systems are installed by quantitative risk assessment results. Therefore, in this research, developed the program to establish quantitative risk assessment and suggested quantitative safety assessment method including fire scenarios in railway tunnel, fire and evacuation analysis model, fatality estimate model and societal risk criteria. Moreover, this method applys to plan preventing disaster for Honam high speed railway tunnel. As results, we presented the proper distance of escape route and societal risk criteria.