• Title/Summary/Keyword: 호남고속철도

Search Result 96, Processing Time 0.022 seconds

A Study on $CO_2$ and PM10 Changes by Operation of KTX HVAC-Pressurization Equipment in Tunnel Sections (터널구간 운행시 KTX HVAC-여압장치 작동에 따른 $CO_2$와 PM10 변화연구)

  • So, Jin-Sub;Yoo, Seong-Yeon
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.6
    • /
    • pp.723-729
    • /
    • 2007
  • The Ministry of Environment established a guide line in December 2006, "Indoor Air Quality Management guidelines in Public Facilities." As the items of the guideline, $CO_2$ (Carbon dioxide) and PM10 (particulate matter) is shown to Level 1 and 2. Therefore trains and subways are included. There are a lot of tunnels by the lay of mountains on KTX (Korean Train Express) service. HVAC (Heating Ventilating and Air-conditioning)-pressurization equipment on KTX is various functioning flaps blocking outside pressure waves. At that time, the fresh air is blocked by flap operation and the air is circulated by return air. In this study, we measured the time series of $CO_2$ and PM10 concentrations in the KTX passenger cabin during the train service of Gyongbu line (Seoul-Busan) and Honan line (Yongsan-Mokpo) from July 2006. Also, analyzed the air quality by operation of KTX HVAC-pressurization equipment in tunnel passing point. As a result, PM10 concentration was totally lower than the regulation values. However, $CO_2$ was highly correlated with several tunnels, such as Oksan-Otan, Godeung-Hyudae and Gaechak-Iijik tunnel. but, the indoor air quality of KTX train have been proved satisfy the recommendation the Ministry of Environment guidelines.

Data Analysis of Inertial Sensors for Train Positioning Detection System (열차위치검지 시스템을 위한 관성센서 데이터 분석 연구)

  • Kim, Seong Jin;Park, Sungsoo;Lee, Jae-Ho;Kang, Donghoon
    • Journal of the Korean Society for Nondestructive Testing
    • /
    • v.35 no.1
    • /
    • pp.18-24
    • /
    • 2015
  • Train positioning detection information is fundamental for high-speed railroad inspection, making it possible to simultaneously determine the status and evaluate the integrity of railroad equipment. This paper presents the results of measurements and an analysis of an inertial measurement unit (IMU) used as a positioning detection sensors. Acceleration and angular rate measurements from the IMU were analyzed in the amplitude and frequency domains, with a discussion on vibration and train motions. Using these results and GPS information, the positioning detection of a Korean tilting train express was performed from Naju station to Illo station on the Honam-line. The results of a synchronized analysis of sensor measurements and train motion can help in the design of a train location detection system and improve the positioning detection performance.

The review about ultra long subsea tunnel design under high water pressure (고수압 초장대 해저터널에 관한 연구)

  • Jun, Duk-Chan;Kim, Ki-Lim;Hong, Eui-Joon;Kim, Chan-Dong;Lee, Young-Joon;Hong, Cheor-Hwa
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.6
    • /
    • pp.829-843
    • /
    • 2017
  • Subsea tunnel needs to be built over 50 km long to connect between nations and continents. However there are only 19 tunnels longer than 5 km until recently. And there is no history of constructing and operating tunnel longer than 50 km. In Korea, subsea tunnels with a length of more than 50 km are being planned, such as Korea~Japan, Korea~China, Honam~Jeju subsea tunnels. Because of the geographical conditions of Korea, most of these tunnels are inter-contry tunnels. So technology preemption for the subsea tunnel construction is getting more and more important. Most of these subsea tunnels are ultra-long tunnels under high water pressure conditions. So new technologies are required such as ventilation and disaster prevention of high-speed tunnels, securing of structural stability under high pressure conditions, and pressure reduction in high-speed conditions. These technologies are different from those of ground tunnels. Therefore, this paper describes the ultra-long subsea tunnel design under high water pressure of maximum 16 bars through the Honam (land) - Jeju (island) virtual subsea project. We proposed a reasonable solution to various problems such as securing structural stability in high pressure condition and ventilation disaster prevention system of ultra long-tunnel.

Characteristics of Curved Track Behaviors according to Traveling Tilting Train (틸팅차량 주행에 따른 기존선 곡선 궤도의 거동 특성)

  • Park, Yong-Gul;Choi, Jung-Youl;Sung, Deok-Yong;Chun, Dae-Sung
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.6
    • /
    • pp.692-700
    • /
    • 2007
  • A trial run of locally-developed tilting train has been in process on Chungbuk line since the test vehicle was first produced. For the system stabilization, interface verification among the systems including track, structure, catenary and signaling system, not to mention the rolling stock, is very crucial. In the area of wayside structure, the stability of track structure and train run shall be evaluated through the review of impact by increased speed by developed train on track structure. The study thus was intended to evaluate the impact on track while a tilting train is running the curve section, which is vulnerable to accelerated train speed. The analysis of tilting train test running the part of Chungbuk line and Honam line was conducted to identify the impact on existing track performance by tilting train. To identify the movement behavior of each part of track while tilting train, high speed train and traditional train (Mugunghwa and freight train) were running the existing line, wheel load, lateral wheel load, rail bending stress, vertical and lateral displacement of rail and vertical displacement of sleeper were compared and analyzed so as to evaluate the expected impact by tilting train for improving the train speed.

Railway Line Planning Considering the Configuration of Lines with Various Halting Patterns (다양한 정차 패턴을 고려한 열차 노선계획의 수립)

  • Park, Bum-Hwan;Oh, Seog-Moon;Hong, Soon-Heum;Moon, Dae-Seop
    • Journal of Korean Society of Transportation
    • /
    • v.23 no.6 s.84
    • /
    • pp.115-125
    • /
    • 2005
  • The line planning problem is to determine the origin and destination stations of the lines with their frequencies so as to meet the OD demands. Since the advent of high speed trains, Korea railway is confronted with the urgent difficulty to reconstruct the line configuration with the frequencies of each line and each fleet type so the demands could be newly created as well as satisfied. Furthermore. the existing trains except the high speed trains suffer from a longer traveling time than before. Now, to reduce the passenger traveling time, the trains with the various halting patterns are run in the same line. Therefore, it is necessary to develop a new line planning model to consider the various halting patterns. Most of studies find the frequencies of each lines which meet the link traffic loads or minimum link frequencies. But these are based on the assumption of all stop patterns. Furthermore, it is not easy to include the actual constraints as like the minimum number of stops at a station, the maximum number of stops or a train, etc. We develop the line planning model considering not only the various halting patterns but also the actual constraints which is based on the multicommodity network flow model with the additional constraints.

A Study on Standard Construction Process Management System for Prediction of Proper Construction Period of Subsea Tunnel (해저터널 적정 공사기간 예측을 위한 표준공정관리 체계 연구)

  • Bae, Keunwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.4
    • /
    • pp.36-47
    • /
    • 2017
  • As a typical domestic subsea tunnel construction the Gadeok subsea tunnel applying the method of immersed tunnel has been completed and the Boryeong-Taean subsea tunnel is under construction using NATM. The high-speed railway subsea tunnels between the Honam and Jeju are under consideration, and the feasibility of constructing subsea tunnels with Japan and China is also under consideration. However, it is difficult to provide the process plan information for the construction work such as the analysis of the feasibility of the subsea tunnel and the prediction of the proper construction period because there is no case of domestic construction for it applying the shield TBM method. Due to economic and other reasons, government organizations are reluctant to apply the shield TBM, and there is lack of data on the construction process management field using the shield TBM method. Therefore, a standard construction process management system for the subsea tunnel is needed to analyze the feasibility of the subsea tunnel and to predict the proper construction period. By presenting the standard construction process management system of subsea tunnels such as WBS, Network Diagram, and construction period calculation model, I hope to contribute technically and economically to future subsea tunnel projects.