• Title/Summary/Keyword: 현장 분석

검색결과 11,458건 처리시간 0.042초

Comparison the Effect of In-situ Mixing Method and Mixed Laying Method for Construction of Stabilizing Layer on Heavy Metal Contaminated Soil (중금속 오염토양 안정화층 시공을 위한 원위치 교반방식과 혼합포설방식의 효과비교)

  • Lee, Sang-Moo;Kim, Jin-Hwan;Yun, Yeo-Joon;Kim, Yoon-Su;Park, Nam-Seo
    • Tunnel and Underground Space
    • /
    • 제25권6호
    • /
    • pp.505-514
    • /
    • 2015
  • In this study, a stabilizing equipment was developed to resolve the problems of existing stabilization construction method for contaminated soil. The field application and workability of the stabilizing equipment were verified through field demonstration tests and laboratory tests. The field application of the stabilizing equipment was identified through field demonstration tests. As a result of laboratory tests for field mixed soil, the mixing capability of stabilizer of the developed construction method was better than that of existing construction method.

An Experimental Study on Behavior of Field Splice Joints of Longitudinal Rib in Orthotropic Steel Decks (강상판 종리브 현장연결부의 실험적 거동 특성)

  • Choi, Dong Ho;Choi, Hang Yong
    • Journal of Korean Society of Steel Construction
    • /
    • 제13권6호
    • /
    • pp.621-629
    • /
    • 2001
  • This study consists of static and fatigue tests to evaluate the behavior on the field splice joint of longitudinal rib in orthotropic steel deck specimens. Specifically, static and influence surface tests are performed for the stress distribution at the scallop area and high-strength bolt connection of longitudinal rib to examine the existence of handhole cover plate and the effect of eccentric loads. The ultimate strength of the field splice joint of longitudinal rib is obtained. In fatigue tests, cracks are observed at the scallop in the lower level test and the catastrophic failure of longitudinal rib is occurred following the failure of handhole cover plate in the higher level test. This study gives a basis for the better understanding of the field splice joint of longitudinal rib.

  • PDF

The Development of Visual Inspection System for National Road Facility Maintenance Management (국도 시설물 유지관리를 위한 현장점검시스템 개발)

  • 주기범;김태학;박상근
    • Proceedings of the CALSEC Conference
    • /
    • 한국전자거래학회 2003년도 종합학술대회 논문집
    • /
    • pp.72-77
    • /
    • 2003
  • Visual inspection works are very important part of facility maintenance and management life cycle as a step of creating base data for decision making and maintenance and repair. But currently, visual inspection works have been performed unefficiently and unreliably as works on hand, duplication of works, decisions of defect state, unutilization of inspection history, lack of professional and so on. In this research, we developed visual inspection system that processes inspection work efficiently and provides reliability of inspection output, as a target of bridges, tunnels, underground roadway on national road. We defined problems through visual inspection work analysis, examined the solutions and reflected to functional design of system. We will plan to utilize this system in HMCS(Highway Maintenance and Construction Service).

  • PDF

Analog Type Instrument Panel Recognition in the Nuclear Power Plant using an Image Processing Technology (원자력 발전소 아날로그 계기판 영상인식)

  • Cho, Jai-Wan;Jeong, Kyung-Min
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 한국정보처리학회 2013년도 춘계학술발표대회
    • /
    • pp.277-280
    • /
    • 2013
  • 원자로 건물 내부에는 원자로의 안전운전을 위한 다수의 계통, 구조물 및 기기들이 위치하고 있다. 원자로의 안전과 직결되는 안전계통 변수 (수위, 압력) 들은 경우에 따라서는 현장확인이 요구된다. 원자로 가동 중에 운전원에 의한 안전계통변수의 현장확인이 용이하도록 원자로 건물 내부의 출입구 (2 중문) 부근에 수위계, 압력계 등의 현장계기가 위치하고 있다. 본 논문에서는 일본의 (주) 동경전력이 공개한 후쿠시마 제 1 원자력발전소 1 호기 원자로건물의 IC (비상용 복수기, isolation condenser) 조사영상에 나타나는 현장계기의 영상인식에 대해 기술한다. 조사 영상의 분석에 의하면 현장계기들은 기계식의 아날로그 타입이다. 아날로그 타입의 기하구조를 이용하여 계기판 눈금을 인식하고, 계기판 바늘의 기울기 계산을 통해 계기판을 영상 판독할 수 있었다. 이러한 계기판의 영상판독은 후쿠시마 원전 사고와 같이, 고방사선 피폭 우려로 인해 사람대신에 로봇이 원자로 건물내부에 진입하여 주요 계통, 구조물 및 기기의 현장계기를 판독한다고 가정하면, 유용한 기능이다.

Shaft Resistance Characteristics of Rock-Socketed Drilled Shafts Based on Pile Load Tests (현장 말뚝재하시험을 통한 암반에 근입된 현장타설말뚝의 주면마찰력 결정)

  • Seol, Hoon-Il;Jeong, Sang-Seom
    • Journal of the Korean Geotechnical Society
    • /
    • 제23권9호
    • /
    • pp.51-63
    • /
    • 2007
  • Behavior of rock-socketed drilled shafts subjected to axial load was investigated on the basis of pile load tests. The emphasis was laid on analyzing the shear load transfer characteristics from the shafts to surrounding rock. Field load tests were performed on nine test shafts under various conditions such as weathering of rock mass, borehole roughness, pile diameters, and loading directions. The borehole roughness at each test site was profiled using a laser borehole profiler. In order to evaluate and to propose ultimate shaft resistance($f_{max}$) of drilled shafts in rock of Korean peninsular, also, database of pile load tests was developed by reviewing various literature and technical reports.

A Case Study on Improvement of Field Training Coursework for Engineering Education - Comparison Korea with France (한국과 프랑스의 현장 실습 중심의 공학 교육 운영에 관한 사례 분석)

  • Kim, Hyeon-A;Hong, Chol-Ho;Kim, Byeong-Sam
    • Journal of Engineering Education Research
    • /
    • 제10권2호
    • /
    • pp.5-18
    • /
    • 2007
  • This paper presents a concept of training coursework for engineers in cooperation with the industry combining system, comparing Korea with France. The students, after first two years in a university for the foundation/basic courses, will be centered in the industry, rather than at an academic institution, where field training engineering coursework will be offered in structured or capstone design(problem based learning) formats through the industry. This study on the improvement of the concept has several advantages including the followings ; 1) Industry hiring local-area students who have the potential to be long-term employees; 2) Industry's immediate access to employees with developing engineering skills; 3) On-the-job training reduced industry training costs after graduation; 4) More effective learning through observing complex operations; 5) Students and industry input for continuous improvement of the curriculum; 6) Greater amenability on the part of industry to actively participate in research and development; 7) Increasing in the flow of real research problems for engineering. Finally, the implications for student quality, accreditation, assessment of partnership, academic freedom, and fundraising for scholarships and researches are discussed briefly.

A Comparative Analysis of Hindrance Factors to Labor Productivity in Each Construction Site Using the IPA (IPA를 이용한 건설 현장별 노동생산성 저해요인 비교)

  • Jeong, Jae-Ho;Lee, Suk-Won;Ahn, Byung-Ju;Jee, Nam-Yong;Kim, Jae-Ju
    • Korean Journal of Construction Engineering and Management
    • /
    • 제15권6호
    • /
    • pp.71-82
    • /
    • 2014
  • Korea's labor productivity in construction sites is dependent on experience and act in accordance with the human element of the construction workers. In order to increase the work productivity of the construction site that requires a strategic management to potentially hindrance factors of labor productivity. However, without considering the potential problems, management of labor productivity in prior studies is focused only on the immediate problems. The purpose of this study is to compare the site-specific analysis of labor productivity impediments using easy IPA to identify potential causes. As a result of the analysis was to identify the realistic problems of job insecurity and poor working conditions as well as economic problems. It is expected that it is possible to provide the basic data to strategy suggestions for long-term labor productivity improvement of the construction site.

A Study on Possibility of Research Community for Mathematics Classroom of Expert-Inservice Teacher-Preservice Teacher (전문가-현장교사-예비교사 수학수업 연구 공동체의 가능성 탐색)

  • Kang, Hyun Young;Tak, Byungjoo;Ko, Eun-Sung
    • School Mathematics
    • /
    • 제18권4호
    • /
    • pp.857-880
    • /
    • 2016
  • The development of teacher's professionalism through teacher education is a key element in the improvement of school education. However, there has been criticism that the mathematics teacher education in Korea do not provide given enough opportunities for the classroom experience during preservice teacher education period. For development of inservice mathematics teachers and preservice teachers' teaching professionalism, this study develops a research community for mathematics classroom consisting of experts, inservice mathematics teachers, and preservice teachers. And the study explores the possibilities of the model as an educational space for inservice teachers and preservice teachers by participating in a series of courses such as task development and revision, and observation and analysis of classes. As results, inservice teachers and preservice teachers were able to enhance the practical experience and understanding necessary for the class, and they were also positively influenced in teacher efficacy and view of teaching on the model. Based on this, we suggest the possibility of the model as a teacher education system.

A Study on the Prevention for Differing Site Conditions Claims - Focused on Design-Build Project in Public Sector - (현장여건상이로 인한 클레임의 예방에 관한 연구 -공공부문의 설계$\cdot$시공일괄공사를 중심으로-)

  • Chung Myung-Woo;Lee Hwa-Young;Seo Yong-Chil;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.46-53
    • /
    • 2001
  • Differing Site Conditions('DSC') Claims among construction claims are on the increase as a direct result of the steady construction of Social Overhead Capital Facilities initiated by Government. As DSC claims generally became apparent during the intial stage of the construction project, it is necessary to timely review and study the proposal on the prevention of DSC claims because delayed settlement will incur more substantial damages to all parties concerned. This research is focused on the identification and analysis of the causes for DSC claims as applicable to design-build project in public sector and it presents the possible short term, medium and long term proposals on the improvement of causes related with DSC claims. The major results of this research are summarized as follows: 1. Improvement of contractor's tender practice 2. Contractor's division of responsibility on the site survey 3. Improvement of owner's exculpatory clause 4. Flexibility on the adjustment of contract amount The proposals stated above could be useful in resolving the DSC claims between owner and contractors.

  • PDF

A Study on the Development of a Construction Field Management Model based on BIM (BIM기반 건설현장 관리모델 개발에 관한 연구)

  • Jun, Young-Woong;Lee, Myoung-Sik
    • Journal of the Korea Institute of Building Construction
    • /
    • 제10권1호
    • /
    • pp.127-135
    • /
    • 2010
  • As the amount of construction information used in the growing construction field increases, the importance of efficient construction field management has been growing. Accordingly, this study aims to identifythe application situation and possibility of BIM through theoretical examinations and domestic & overseas case studies of BIM, and attempts to suggest an approach to the formulation of an efficient construction field management model through the implementation of phase-oriented and cooperation entity-oriented analysis in the construction field. In the future, the conclusions of this study should be used to formulate an actual construction field management model and apply it in the field.