• Title/Summary/Keyword: 해외건설 수주액

Search Result 32, Processing Time 0.019 seconds

An Analysis of Concentrate Competency in Bidding Process for Overseas Project of Domestic Construction Companies (국내건설기업의 해외 프로젝트 입찰단계 우선집중역량 분석)

  • Kim, Ji Hyung;Kim, Yea Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.23-30
    • /
    • 2014
  • Overseas construction orders of domestic companies had been increased significantly in a short period from $10.9 billion in 2005 to $64.9 billion in 2012. However experts are concerned that quality of growth will not support quantitative growth. This study suggest concentrate competencies for not only winning in bid but also successful execution of domestic companies. 4 Steps which are Pre-Marketing, Bid-Preparation, Bidding, Contract Phase are defined for competency assessment. After drawing specific tasks by phase, survey asking importance and capability of the tasks to the person in charge of bidding and site was conducted by utilizing Likert 7 point scale. According to the result of IPA analysis, domestic construction companies need to ensure internal competencies; Project risk review, Bid team organization, and external competencies; Client needs grasp, Localization strategy, Cooperation establishment. Hearafter domestic construction companies will be able to utilize the result of the study for setting bidding strategy for winning in bid and improving earning rate.

A Research on Development Measures of Information Services for Construction Technology (건설기술 정보서비스 구축 방안에 관한 연구)

  • Ok, Hyun;Kim, Jin-Uk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.8
    • /
    • pp.5707-5715
    • /
    • 2015
  • Recently, construction industry has won an increasing number of orders for overseas construction projects, thereby achieving an external growth, but its competiveness is concentrated on the construction execution field. In particular, the plant field occupies most of the entire orders, which are concentrated regionally in the Middle East and Asia. In addition, low-cost orders are frequently caused by excessive competition. But its high value-added construction engineering(Below, CE) field's overseas market share and technological capacity are very low. Also, technological competiveness, in terms of order amount and other factors, is deepening in polarization between large CE companies and small and medium-sized CE firms. It is noted that the existing CE information systems mostly simply accumulate data such as design and specification standards and provide the information thereon to users, and thus have yet to provide the information essential for the CE and support such efforts. This study sought to prepare a system designed for sharing outstanding design documents information necessary for the CE industry, by category of construction so as to support the technological enhancement of the CE field. Toward that end, this study presented measures for constructing the system and services designed to exchange and share the outstanding design documents information and know-how by construction category necessary between ordering agencies and CE companies.

Problems And Improvements of the Standards Code for Plant Design (플랜트 설계를 위한 표준코드의 문제점 및 개선방향)

  • Gu, Bon-Hak;Kim, Tae-Hui
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.659-662
    • /
    • 2006
  • Plant industry is very important industry that dominate 70% of standard foreign countries construction acceptance an order woe 2004 years. Technique of plant industry is state that secure part equipment connection detailed design and construction class' competitive power. But, high added value creation among plant industry need technique elevation because available plan, basic design technology is insufficient. Therefore, high added value creation wishes to present problem of standard code and improvement direction for plant design to improve available plan, basic design technology competitive power.

  • PDF

Development of Construction Benchmarking for Oversea Industrial Projects (해외플랜트 공사 벤치마킹 프로그램 개발)

  • Park, Hee-Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.3
    • /
    • pp.1165-1171
    • /
    • 2013
  • The oversea construction contract amount has sharply increased since 2003. The contractor's capability for EPC and project management is a key factor for a successful industrial construction project. Construction performance measurement and evaluation is needed to improve contractor's project management capability. Therefore, this paper proposes the construction performance benchmarking program for oversea industrial projects. Performance metrics consists of project cost, schedule, quality, and safety. Data from 10 oversea industrial projects were collected and analyzed. Also, this paper describes the process for development of the benchmarking program and lessons learned from industry are summarized. Finally, this paper recommends how sustainable benchmarking program should be established and implemented.

The Development of a Standardized Work Process for Planning of Plant Project - Focus on Excavating and Investing Participation Plan - (플랜트 프로젝트 사업기획단계 표준 업무 프로세스 개발 - 사업발굴 및 사업참여 결정을 중심으로 -)

  • Lee, Do-yun;Choi, Chang-Hoon;Won, Seo-kyung;Cho, Moon-Young;Han, Choong-Hee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.3-11
    • /
    • 2016
  • Recently, overseas plant orders of domestic enterprises are steadily increased, and the amount of orders in the first half of 2014 were 93% increased compared to the previous year. In addition, now which is the third quarter of 2015, overseas plant orders are already over 249.8 billion dollars so the interests of plant industry research has been increased. In the life cycle of the plant project, CM before the construction stage is to complement the uncertainties that are inherent in the early stages of the project, and from the viewpoint of supporting the rational decision-making, the importance of its role is on the rise. Among them, excavating and investing participation plan in the planning stage is an important work that has a large impact force to influence the success and failure of future project. However, the work has become a problem with frequent consultations due to decision-making, continuous modification, and inefficient repetitive tasks. Therefore, it is needed that work process should be changed to effectively accommodate. The purpose of this paper is to derive the major work items for excavating and investing participation plan in the planning stage of the plant project, and establish a standardized work process through the Delphi analysis. The result of this study is expected to be utilized for EPC companies in ensuring the technical competitiveness in planning on overseas markets, and improve the efficiency of work.

A Study on the Financing Methods and Risk Management for Expansion of Overseas Investment Infrastructure Projects (해외투자개발형 인프라사업 확대를 위한 금융조달 및 위험관리 방안)

  • Jung, Chang-Go
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.2
    • /
    • pp.427-435
    • /
    • 2017
  • Korea's overseas construction awards reached US $750 bn for more than 50 years since it first entered the market in 1966. In particular, the company won US $540 bn over 10 years from 2007, achieving 72% of the total contracts. However, in recent two years, awarded amounts have decreased by 40% each year. The most significant decline is due to the impact of international oil prices, which have plummeted since end of 2014, as oil-producing nations, which are Korea's major target countries, are struggling to cancel or postpone infrastructure orders. In order to lessen the impact of raw material price fluctuations, the recent trend is that even countries with relatively loose government financing conditions are rapidly changing their ordering methods to investment development forms such as PPP. The Korean government and companies have been already preparing for this for several years, but they are still not doing so well. The main reason is the lack of understanding about the investment development type project, especially financing methods and the aggravated fear of exposing it to various risks due to the characteristics of the development project, which takes a long time to collect the investment. In this paper, I propose a more systematic solution to financial process and risk management, which is recognized as a obstructive factor for Korean companies, in line with the recent government-led establishment of overseas infrastructure development support organizations. I would like to serve as a investment guide.

An Analysis of the International Competitiveness of Productivity in the Korean Construction Industry (한국 건설 산업 생산성의 국제경쟁력 분석)

  • Won, Jong-Sung;Lee, Ghang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.75-83
    • /
    • 2008
  • In the previous comparative studies of international competitiveness conducted before 2003, Korean construction productivity had been estimated to be lower (or poor) than that of developed countries such as US, UK, and Japan. However, the amount of international contracts Korean has won increased substantially, and Korean construction has progressed with creating two skyscrapers such as Petronas Tower and Burj Dubai. At this point we need to reevaluate what we are capable of. In this paper, we evaluated international competitiveness of our construction industry comparing to advanced countries by analyzing labor productivity. For evaluating construction competitiveness we measured labor productivity using the value of construction work in US dollar per hour based on domestic and foreign statistical data and analyzing completion days per a story and the ratio of underground floors to ground floors of buildings in Korea and Japan. As a result, although our construction productivity is not yet competitive with the US and Japan yet, we excel the UK.

Domestic Economic Effects of Overall Industrial Complex Construction - Based on the Induced Coefficients by Development Stage of Industrial Complex - (해외 산업단지 건설의 국내경제 파급효과 분석 - 산업단지 개발단계별 유발계수를 기준으로 -)

  • Choi, Myoungsub;Cho, Kang-Joo;Kim, Myeong-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.117-125
    • /
    • 2019
  • This study was aimed to derive measures for maximizing ripple effect of construction of overseas industrial complexes on domestic economy. The induced coefficients were estimated for each step of development of industrial complexes by applying the raw data of ICAK and the input-output mode. As a result, for urban service, the fraction of labor costs was high, and for civil engineering, the fraction of profit & loss was high. However, the proportion of intermediate and profit & loss was high in Architecture. Consequently, compare to the same type of overseas constructions, larger effects were seen at urban service in terms of employment, at civil engineering and architecture in terms of business, and at national economy in terms of architecture. These results suggest that in order to maximize ripple effect of construction of overseas industrial complex on domestic economy, it will be needed to seek an order strategy including not only simply sell a land and but also building factories in the industrial complex.

Application System Improvement of the Codes and Standards for Plant Design (플랜트 설계를 위한 표준코드의 활용체계 개선방안)

  • Gu, Bon-Hak;Kim, Tae-Hui
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.81-89
    • /
    • 2007
  • Plant industry is one of important industry that possesses 70% of fund in construction contracts for oversea customers at 2004. It is called E(Engineering), P(Procurement), C(Construction) industry. Plant industry of Korea has a competitive power of the detail design and operation for the establishment construction. But among E, P, C at plant industry, technic of E part which is able to make higher profits; Planning and basic designing; are poor. They should have much more improvements. Thus to enhance a competitive power of planning and basic designing, we are going to analyze problems of utilizing a standard code for plant design and present plans for their improvements.

A Study on the Effect and Improvement Direction of the Credit Rating of Large Construction Firms by the Reinforced Real Estate Regulations and the Raising of the Base Rate (정부 부동산규제 강화와 기준금리 인상이 대형건설사 신용등급에 미치는 영향과 개선방향에 관한 연구)

  • Lee, YunHong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.1
    • /
    • pp.90-102
    • /
    • 2018
  • In preparation of the increase in the domestic debts and the rise in the US interest rate, the Korean government has started to strengthen the regulation on the property market since 2017. So, it is likely that the sales in the domestic construction market would be decreased. Even in the overseas plant projects market, as there has been the continuous increase in the cost and the resulting increase in the losses, it looks hard for the large construction companies to keep their credit ratings as they are now. This study is designed to check Korean government's property policy and any possible problems caused by the overseas and domestic economic environment, which include the property market policy, interest rate, rise in the property price and lackluster sales in housing market. It showed the change in the credit ratings by finding out the sales, work capability, sales in non-governmental projects, operating profits and PF contingency liabilities. For this study, the questionnaires were sent to 30 practical experts to analyze the effect of the risk factor on the outside credit rating of large construction companies.