• Title/Summary/Keyword: 항만건설작업선

Search Result 7, Processing Time 0.018 seconds

Application Range of "Temporary Alteration" in the Article 10 of Ship Safety Act (항만건설작업선의 선박안전법 제10조제3항(임시변경) 적용범위에 관한 연구)

  • Yeong-Tae Son
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.29 no.2
    • /
    • pp.177-187
    • /
    • 2023
  • The Ship Safety Act prescribes matters necessary for the maintenance of seaworthiness and safe navigation of ships. In this regard, Article 10 of this Act requires shipowner to undergo occasional survey if he/she wants to temporarily change intends to modify the details entered in a ship survey certificate. Such measures are in accordance with the maintenance of the state of the ship after the ship inspection under Article 15 of this Act, and this Act includes "harbor construction work ship" under Article 39 Paragraph (1) of the Harbor Act. However, although the harbor construction work ship originally showed the same operating system as the barge, it was not applied to the Ship Safety Act and was registered and surveyed under the Construction Machinery Management Act. Then "Seokjeong No. 36" sinking accident in Ulsan on December 14, 2012, led to the amendment of the Harbor Act in 2016, and considering the fact that it was added to the Ship Safety Act and applied, there is a realistic limit to applying all the regulations stipulated in the Ship Safety Act to the harbor construction work ship. Accordingly, this study discusses the work characteristics through concept, registration, work area, survey regulations, application case of temporary alteration etc. of harbor construction work ships and controversial issues related to the scope of application of the Ship Safety Act of actual harbor construction work ships, and also the appropriate scope of "temporary alteration" among temporary inspections prescribed in Article 10 of the Ship Safety Act in consideration of the legislative purpose of incorporating harbor construction work ships into the survey subject to the Ship Safety Act in accordance with the revision of the Harbor Act.

Application Case of Shipbuilding F/D for Port Construction (조선용 F/D의 항만건설현장 적용사례)

  • Kim, Yeong-Hak;Jeong, Uk-Jin;Hong, Jang-Ho
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2018.11a
    • /
    • pp.52-54
    • /
    • 2018
  • 울산신항 북방파제(제3공구)축조공사에서는 국내 최초로 선박제조용 F/D(Floating Dock)선을 적용하여 케이슨 제작 및 거치공사를 실시하였으며, 공장형 슬립폼 제작장(IP-CCV)를 적용한 경우 보다 공기단축 및 원가절감의 효과가 있었다. F/D선 공법 순서는 작업부두에 F/D선 접안, 케이슨 제작, F/D선 진수장 이동, F/D선 및 케이슨 진수, 케이슨 예인 및 거치의 순서로 시행되었으며, 현재 턴키공사의 설계특화 내용으로 활용되어 시공안정성 향상 및 공기, 공사비 절감 방안으로 적용되고 있다. 향후 남북관계가 원만히 해결되어 동해안 항만개발이 가속화되면 국외특허공법(IP-CCV)에 의존없이 경쟁력있는 공법이라 판단된다.

  • PDF

새천년대교 항행안전 확보에 관한 연구

  • Park, Seong-Buk;Gang, Sang-Geun;Jeong, Jae-Yong
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2012.06a
    • /
    • pp.377-379
    • /
    • 2012
  • 새천년대교 건설을 위하여 설치된 공사용 구조물, 작업용 선박 및 바지선 등 새로운 항행장애물 발생으로 인하여 항행여건이 더욱 열악하게 됨으로써 해양사고 발생 가능성이 증가하고 있어 이에 대한 안전대책을 수립 시행하여 해양사고를 예방하고자 한다.

  • PDF

Safe Navigation Plan for Dredging Operations to build Sunken Tunnel for Access Road between Busan-Geoje (부산-거제간 연결도로 침매터널공사의 준설작업에 따른 안전통항방안)

  • Kim, Jung-Hoon;Gug, Seung-Gi
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • v.1
    • /
    • pp.509-514
    • /
    • 2006
  • This research does by purpose that present safe navigation plan for ships during doing dredging construction with dredger crossing waterway of Gadeok. Dredging operations need to build sunken tunnel that cross the bottom of the sea under waterway of Gadeok for access road construction between Busan- Geoje. Accordingly, dredger must cross and dredge waterway of Gadeok fatally. There is possibility of marine accident of collision for latent danger situation of ships to navigate waterway of Gadeok relatively. Therefore, safe navigation plan of ship is groped in reply and its countermeasure is presented.

  • PDF

Safe Navigation Plan for Dredging Operations to build Sunken Tunnel for Access Road between Busan-Geoje (부산-거제간 연결도로 침매터널공사의 준설작업에 따른 안전통항방안)

  • Kim, Jung-Hoon;Gug, Seung-Gi
    • Journal of Navigation and Port Research
    • /
    • v.30 no.10 s.116
    • /
    • pp.825-831
    • /
    • 2006
  • This research does by purpose that present safe navigation plan for ships during doing dredging construction with dredger crossing waterway of Gadeok Dredging operations need to build sunken tunnel that cross the bottom of the sea under waterway of Gadeok for access road construction between Busan- Geoje. Accordingly, dredger must cross and dredge waterway of Gadeok fatally. There is possibility of marine accident of collision for latent danger situation of ships to navigate waterway of Gadeok relatively. Therefore, safe navigation plan of ship is groped in reply and its countermeasure is presented. Firstly, navigating traffic in daytime was forecasted less than 20% of its maximum capacity through estimating the traffic volume and traffic congestion The proposal was presented to execute dredging operations in three-step and to establish temporary waterway after reviewing waterway design principles. The role of VTS center was emphasized in the new Busan Port, lastly.

The Seiches At Pohang Harbor (포항항의 해면부진동 현상)

  • Chu, Kyo-Sung
    • 한국해양학회지
    • /
    • v.11 no.2
    • /
    • pp.51-56
    • /
    • 1976
  • A statistcal investigation was made on the seiches at Pohang harbor, east of Korea, based on the data of observations for the year 1973 and 1974. Pohang harbor has a most remarkable seiches comparing to the major harbors in Korea. The frequently observed conspicuos seiches at the harbor have a period of 20 to 24 minutes mostly and 60 to 84 minutes in the next place. Maximum height of seiches were 50cm in 1973 and 60cm in 1974, respectively, which were occured at the expansions of cold-dry continental high pressure and on the following day of passages of lowest pressurs. Minus tides at Pohang were occured more frequently than that of seiches and the minus tides falled more greatly at the time of seiches.

  • PDF

A Study on the Maneuvering Area of Ship in Moving at Single Point Mooring (SPM 이안 선박의 조종영역에 관한 기초 연구)

  • Kim Jin-Soo;Jong Jae-Yong;Kim Kyung-Tae
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.11 no.2 s.23
    • /
    • pp.19-25
    • /
    • 2005
  • The work of VLCC SPM mainly is accomplished on the open sea. On the open sea as a result of meteorological condition and the ocean wave influence, When the weather condition is get bed, peremptorily moving to the safety place, bemuse of the gale and the billow, almost happened frequently, the pilot is unable to go on board and the tug is also unable to be used Now bemuse of the bad weather the VLCC SPM moving to the other safety place frequently happened in the ulsan port. the construction of new harbor, it constructed many break water around SPM. So that it is necessary to propose the new standard about how to maneuvering area actually. Now our country is at the blank stage about the establishment of SPM research Most of the situations refer to overseas standards. But these standards lack consistency and clarity. So when moving to the another safe place from SPM, we must Carry through the research and study on the ships using sailing through AIS Data We must put forward a new standard about maneuvering area of ships moving at SPM.

  • PDF