• Title/Summary/Keyword: 합벽

Search Result 16, Processing Time 0.022 seconds

Cost Analysis of Construction Phase in Basement Composite Wall Form (지하 합벽 거푸집의 시공단계별 원가 분석에 관한 연구)

  • Choi, Oh-Young;Heo, Kyoung-Moo;Kim, Tae-Hui;Kim, Jae-Yeob;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.6
    • /
    • pp.189-195
    • /
    • 2009
  • Recently, the urban centralization phenomenon appears to be growing. As a result, many vigorous efforts for the use of underground space are being made. In particular, the basement depth of construction in the downtown area has deepened and construction is often done close to adjacent buildings. In this case, generally, the underground construction approach mainly used is the composite basement wall system. However, a cost analysis of the basement composite wall system does not exist. Therefore, in this study, the cost of the composite basement wall system was analyzed. The percentage breakdown of costs were: buttress work processes, 3% form work processes, 26% reinforcement work processes, 12% support work processes, 42% and other processes,17%. Accordingly, it will be necessary when developing new technology and construction methods to determine the development focus.

Work Time of Basement Composite Wall Form Assembly by Work Time Analysis (작업분석을 통한 합벽거푸집 구성 요소별 작업소요시간에 관한 연구)

  • Heo, Kyoung-Moo;Kim, Myoung-Hyun;Kim, Tae-Hui;Kim, Jae-Yeob;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.9-13
    • /
    • 2009
  • Recently, construction in downtown is often done closely at the adjacent building. In this case, underground construction need to Basement Composite Wall(BCW) construction. However, generally, during the construction process of BCW form works have many problems that are narrow working space and inefficient time consuming. Despite of these problems, there was no quantitative research for the work time of BCM assembly. Therefore, in this study, work time of CBW form assembly in underground construction is identified by the work analysis. The results of this study reveal that buttress work of basement form take lots of time in the entire work process of Basement Composite Wall form assembly.

  • PDF

Thermal Cracking Control of Mass Concrete by Vertical Pipe Cooling Method (연직파이프쿨링 공법에 의한 매스콘크리트 온도균열 제어)

  • Seo, Tae-Seok;Lim, Chang-Keun;Cho, Yun-Gu
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.2 no.3
    • /
    • pp.233-238
    • /
    • 2014
  • In case of the slender mass concrete like attached wall, retaining wall and bridge tower, the low heat cement and the control joint are mainly used for thermal cracking control. However, even if these cracking control methods are considered, it is impossible to control thermal cracks perfectly, because the external restraint is largely in these mass concrete. Because these cracks occurring in slender mass concrete members almost penetrate concrete member, the special cracking control is demanded in these mass concretes. The vertical pipe cooling method improving existing pipe cooling method was developed for the active thermal cracking control of slender mass concrete, and applied at the field attached wall. In results, the maximum temperature dropped more than $10^{\circ}C$ by vertical pipe cooling method, and the cracks decreased about more than 50%.

An Analysis of External Waterproofing Materials and Construction Technology Status on Single Side Wall in Underground Structures (지하구조물 합벽구간 적용 외방수 재료 및 시공기술 현황 분석)

  • Kim, Meong-Ji;Kim, Soo-Yeon;Oh, Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.222-223
    • /
    • 2019
  • Waterproofing techniques used in underground structures do not reflect material and construction environments, but rely only on material properties, which inevitably lead to their limits in durable life. In particular, the government intends to investigate the current underground water treatment method and analyze the problems in order to prevent serious corrosion and aging of structures caused by underground water leaks and poor construction.

  • PDF

Anti-Seismic Evaluation of Waterproofing Materials for Positive-Side wall and pile wall of Underground Concrete Structures (합벽구간 및 지하구조물 외벽에 사용되는 방수재료 내진 성능실험방법)

  • Oh, Kyu-hwan;Kim, Soo-Yeon;Oh, Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.210-211
    • /
    • 2021
  • This study introduces and demonstrates the application of an experimental regime for anti-seismic performance evaluation of waterproofing materials to used for concrete pile walls. Concrete pile walls are subject to high degree of seismic load, and the occurring stress can affect the waterproofing integrity of the structure, but there is currently no existing methodology or standard for evaluating this property of waterproofing materials. To propose and conduct this evaluation, a new testing apparatus was designed and manufactured intended to be able to test an installed waterproofing material's seismic resistance performance.

  • PDF

A Study on the Applicability of Non-Supporting System Forms for Single Face Walls in Underground Construction (지하층 합벽 무지주 시스템 거푸집의 적용성에 관한 연구)

  • Kim, Jae Yeob;An, Sung-Hoon;Sohn, Young-Jin
    • KIEAE Journal
    • /
    • v.8 no.2
    • /
    • pp.87-92
    • /
    • 2008
  • Underground building constructions are recently more important because the ratio of underground area is increasing in the huge and high-rise building construction projects. For reducing the total building construction periods, it is required to reduce not only the over-ground structural work periods but also the underground structural work periods. Therefore, this study is proposed the non-supporting system forms for single face walls in underground building construction by one of the methods for reducing the underground structural work periods and investigated the applicability of the non-supporting system forms by analyzing the case-study in civil construction project. In regard of construction duration, the results of analyzing the case-study showed that the non-supporting system forms are better than the euro forms with soldier system for single face walls in underground building construction. In addition, it is showed that the cost of these two forms is similar and usage the working space and safety in non-supporting system forms are better that those of the euro forms with soldier system, too.

A Case Study on the Method of High-rise Wall in Rammed Earth Construction (고층형 흙다짐 공법의 사례 연구)

  • Lee, JongKook;Kim, HoChun;Lee, SangWon
    • KIEAE Journal
    • /
    • v.8 no.3
    • /
    • pp.85-91
    • /
    • 2008
  • We intends to understand the rammed earth method and suggest the possibilities of adoption on high-rise rammed earth structures through the case study on the method. The rammed earth construction has been regarded as one of the solutions in the modern environmental-friendly construction field, thus according to such trend, this study tries to find out the limitations of the rammed earth structures to be multistory and grope for solutions in the attached wall construction method. The procedures of this research is to figure out the limitations of rammed earth structures through theoretical consideration on those structures and analyze the actual cases of them, and to assure the possibilities on the development of the rammed earth method that can make the structures multistory earthen structures in the rammed earth method and induce immediate issues for it.

A Study on the Seismic Performance Design of Waterproofing Materials Applied to Single-side Walls of Underground Structures (지하 구조물 합벽구간에 적용되는 방수재료의 내진성능설계를 위한 기초 자료조사 연구)

  • Kim, Soo Yeon;Na, Mi Ok;Lee, Sung Jin;Kim, Meong Ji;Oh, Sang Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.220-221
    • /
    • 2019
  • At a time when the recent earthquake in Pohang, Korea requires the need for seismic performance design not only for concrete structures but also for construction materials used in construction structures, the possibility of applying the seismic performance design of waterproof materials constructed in the form of direct or partial adhesion to concrete structures in the underground Single-side walls section was confirmed.

  • PDF

A Study on the Outside Waterproof Method of Ground using Wire-mesh and Non-hardening Viscosity WaterproofBusiness (비경화성 점착 방수제와 보강메쉬를 이용한 지하 외방수 공법에 관한 연구)

  • Moon, You-Seok;Lee, Sin-Chun;Gwon, Gi-Ju;Oh, Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.213-217
    • /
    • 2009
  • Underground structures are built into concrete like a architecture and public works. Concrete has watertightness as such, But buildings are leaking from the cracks. Recently, construction method do a lot of close construction in the downtown area. So architects are using the method for the outer layer of a two-layer wall to save spaces. They have been using Top-down method and waterproof agent method and others to outer layer of a two-layer wall method. But, There are many leakage in underground structure from lack on requirements performance of materials. Therefore, I hope to test the outside Waterproof Method of Ground using Wire-mesh and Non-hardening Viscosity Waterproof. In addition to, I wish to apply as outside waterproof method for the section for the outer layer of a two-layer wall in underground structure.

  • PDF

Design and Construction of the Green Wall System considering Distribution Effect of Earth Pressure by Soil Nail (쏘일네일의 토압분담효과를 고려한 그린월 시스템의 설계 및 시공)

  • Park, Si-Sam;Cho, Sung-Han
    • Journal of the Korean Geosynthetics Society
    • /
    • v.5 no.3
    • /
    • pp.1-7
    • /
    • 2006
  • The Green Wall system, developed in Austria early 1960, is one of segmental concrete crib type earth retaining wall. Green wall is constructed as procedures that lay the front stretchers, rear stretchers and headers then making a rigid body through harden filled soil of interior cell. Green wall has pro-environmental advantages that able to grow grass in front space of stretchers and decrease cutting ground. In Europe, Green wall used without other reinforcement method. However, green wall used with other reinforcement method like a soil nailing because of environmental problem. This study was performed to introduce the design case by 'Two-Body Translation mechanism' to be able to consider distribution of earth pressure in the soil nailing when designing the green wall using soil nailing system. Also, this study attempts to evaluate the earth pressure change when advanced soil nailing system is constructed using $FLAC^{2D}$ ver. 3.30 program and 'Two-Body Translation mechanism'.

  • PDF