• Title/Summary/Keyword: 하수처리시스템

Search Result 271, Processing Time 0.028 seconds

The Development of Cleaning and Monitoring System for Pipeline Type UV Sterilizer (관로형 UV 소독기를 위한 세척 및 모니터링 시스템 개발)

  • Park, Byeung-Jun;Ryu, Ji-Hyoung;Park, Jae-Byung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.12
    • /
    • pp.6434-6440
    • /
    • 2013
  • In this paper, an integrated control system is proposed for automatic control and remote monitoring of pipeline type UV sterilizer. The proposed system can control the cleaning wiper in the sterilizer with various cleaning motions, and periodically check the contamination level of the UV lamps with the UV power sensors. Therefore, sterilizer repair and maintenance can be more effectively done. In addition, the control system based on the open-source processor can communicate with external smart devices via Bluetooth, and thus wirelessly exchange control commands and sensor data. Furthermore, the system is able to flexibly cope with changes of cleaning motions and sensors since its firmware can be wirelessly upgraded by using the smart device. Consequently, the proposed system is suitable to construct a smart sewage treatment system in small towns.

The test-bed construction and water purification assessment of the eco-convergence type aerated string contacted oxidation system (생태융합형 접촉산화수로 Test-Bed 구축 및 정화효율 평가)

  • Choi, Sunhwa;Lee, Seung-Heon;Jang, Kyusang;Kim, Heungseop
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.592-592
    • /
    • 2016
  • 국내에는 17,500여개의 농업용 저수지가 전국적으로 분포하고 있다. 국내 농업용 저수지는 대부분이 소규모이며, 연중 수량 변동이 심하고, 유역배율이 작아 태생적으로 수질오염에 취약한 구조로 되어 있다. 특히 농업용 저수지는 도시 근교나 농촌지역에 많이 위치하고 있어 유역 내 축산 농가나 미처리 생활하수에서 유래된 유기물 및 영양염류 유입에 의한 수질오염도가 높다. 저수지에 고농도로 유입되는 유기물, TN, TP를 처리하기 위하여 농어촌연구원과 수생태복원(주)에서는 공동으로 친환경 수처리시설인 생태융합형 접촉산화시스템을 개발하였다. 생태융합 접촉산화수로는 상부 식생과 수로 내의 섬유상 끈상 미생물 접촉재를 이용하여 오염수가 수로를 흐르면서 침전, 여과, 흡착, 산화, 흡수 등 물리학적, 화학적, 생물학적 원리를 이용하여 고농도의 유기물과 질소, 인을 제거하는 물리적, 생물학적 공정을 융복합 기술이다. 본 연구에서는 경기도 시흥시에 소재하고 있는 M 저수지에 현장 Test-bed를 구축하여 수질정화효율을 평가하였다. M 저수지는 유효저수지량이 약 23만톤에 해당하는 소규모 저수지로, 1941년도 준공된 아주 노후화된 저수지로 평균 수심이 2m 이하이고 연중 수질오염도가 높은 저수지이다. 매화저수지 수변에 설치된 생태융합형 접촉산화수로의 전체규모는 길이 8.6m, 폭 2m, 수심 2m에 해당하며, 끈상 미생물 메디아조 3개($2{\times}2{\times}6m^3$), 침전조 1개($2{\times}2{\times}2m^3$)로 구성되어 있다. 기타 부대 장치로는 끈상 메디아조에 산소공급을 위한 Air-mist(마이크로 버블 발생장치), 자동운전계기판, 유입펌프 등이 있다. 생태융합형 접촉산화수로의 처리 공정은 유입수${\rightarrow}$에어미스트${\rightarrow}$고속복합응집장치${\rightarrow}$융복합 산화조(3조)${\rightarrow}$침전조${\rightarrow}$방류로 구성되어 있다. 테스트 베드는 2015년 8월 말경에 구축 완료하였으며, 끈상 미생물 메디아조의 수질정화효율을 평가하기 위하여 9월부터 11월까지 총 7회 걸쳐 유입수와 유출수를 각각 조사하였다. 현장 측정항목인 수온, pH, EC, DO 등은 유입수 및 유출수간 큰 차이가 없었고, COD, SS, Chl-a, TP 등은 수처리시스템 초기 가동시에는 메디아에 미생물 부착율 저조로 유입수 및 유출수 수질농도에 큰 차이가 없었으나, 운영시간의 경과와 함께 메디아의 미생물 충진율이 높아짐에 따라 처리효율이 최대 SS 69.6%, Chl-a 89.3%, TP 89%까지 도달하는 것으로 나타났다. 생태융합 접촉산화수로는 부지 집약적인 컴팩트한 수처리 시설로서 현재 널리 이용되고 있는 인공습지를 대체할 수 있는 경제적인 시설로 판단된다.

  • PDF

A Case Study on Cost-Benefit Analysis of the Septic Tank and Exclusive Sewage Pipe Line in Designing the large Building at Combined Sewer District (합류식 하수도 지역에 대형 건축물 설계시 정화조 및 전용오수관로의 비용편익분석 사례연구)

  • Oh, Hyun-Taek;Kim, Sung-Tai;Lim, Byung-In;Kang, Byong-Jun;Park, Kyoo-Hong
    • Journal of Digital Convergence
    • /
    • v.17 no.6
    • /
    • pp.169-175
    • /
    • 2019
  • The aim of this study is to examine the relative economic benefits between the septic tank and exclusive sewage pipe line in designing the large building at combined sewer districts. With the case study of Lotte World Tower Building, we analyze a cost-benefit between two alternatives. The research results showed 2 years of payback period, about ₩6.17 billion of NPV, and 1.93 of B/C ratio for installing the exclusive sewage pipe line in comparison with septic tank. This results provide useful guidelines for policy establishment of the septic tank closure and for plausibility of installing exclusive sewage pipe line when constructing a large building. In the future, it will be necessary to consider additional cost-benefit analysis including burden charge borne by causers, the burden of management responsibility with a exclusive sewage pipe line, and the economic benefits of reducing odor.

A study on ecological reprocessing and creation of biotope by reuse of treated waste water and nonpoint pollution source of stream (하수처리수와 하천 비점오염원을 이용한 생태적 재처리 효과와 생물 서식처 창출 방안 - 왕포천 생태적수질정화비오톱(Sustainable Structured wetland Biotop) 시스템 사례를 중심으로 -)

  • Byeon, ChanWoo;Lee, JongnChan
    • Journal of Wetlands Research
    • /
    • v.21 no.4
    • /
    • pp.374-383
    • /
    • 2019
  • The Wangpo stream located in the Buyeo-gun was a small stream with both low water quality and quantity due to the cultivated land and settlement area through the stream. In order to restore ecosystem, the Sustainable Structured wetland Biotop system was applied to treat 1,500 to 7,000 ㎥/d amount of effluent water pumped from the Buyeo sewage treatment plant facility as well as inflowed from nonpoint pollution source of Wangpo stream. As a result of continuous monitoring for 2 years from 2016 to 2018 after completing restorative construction, the average BOD5 as an index of organic pollution was 7.3 mg/L and the average effluent concentration became 2.1 mg/L, showing an improvement by 71.2%. The average inflow concentration of T-N was 7.953 mg/L and the average outflow concentration was 3.379 mg/L, showing 57.5% of improvement. The average inflow concentration of T-P was 0.177 mg/L and the average outflow concentration was 0.052 mg/L, showing about 70.7% improvement. The results of ecological monitoring after creating biotope by reuse of treated waste water and nonpoint pollution source of the Wangpo Stream are as follows. The plant taxa founded in water SSB(Sustainable Structured wetland Biotop) system of the Wangpo Stream was total 41 species in 21 families, showing a higher proportion of naturally introduced plant than that of artificially planted species. In case of other terrestrial animals, both amphibian and reptile group were confirmed as 3 species in 6 families, avian group was 25 species of 15 families, and mammal group observed 5 species in 5 families, respectively. All species have been created and enhanced through purified water inhabited in the SSB(Sustainable Structured wetland Biotop) system as a treatment wetland, eventually migrating to the Wangpo Stream.

Nutrient Recovery from Sludge Fermentation Effluent in Upflow Phosphate Crystallization Process (상향류 인 결정화공정을 이용한 슬러지 발효 유출수로 부터의 영양소 회수)

  • Ahn, Young-Ho
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.28 no.8
    • /
    • pp.866-871
    • /
    • 2006
  • The nutrient recovery in phosphate crystallization process was investigated by using laboratory scale uptlow reactors, adopting sequencing batch type configuration. The industrial waste lime was used as potential cation source with magnesium salt($MgCl_2$) as control. The research was focused on its successful application in a novel integrated sludge treatment process, which is comprised of a high performance fermenter followed by a crystallization reactor. In the struvite precipitation test using synthetic wastewater first, which has the similar characteristics with the real fermentation effluent, the considerable nutrient removal(about 60%) in both ammonia and phosphate was observed within $0.5{\sim}1$ hr of retention time. The results also revealed that a minor amount(<5%) of ammonia stripping naturally occurred due to the alkaline(pH 9) characteristic in feed substrate. Stripping of $CO_2$ by air did not increase the struvite precipitation rate but it led to increased ammonia removal. In the second experiment using the fermentation effluent, the optimal dosage of magnesium salt for struvite precipitation was 0.86 g Mg $g^{-1}$ P, similar to the mass ratio of the struvite. The optimal dosage of waste lime was 0.3 g $L^{-1}$, resulting in 80% of $NH_4-N$ and 41% of $PO_4-P$ removal, at about 3 hrs of retention time. In the microscopic analysis, amorphous crystals were mainly observed in the settled solids with waste lime but prism-like crystals were observed with magnesium salt. Based on mass balance analysis for an integrated sludge treatment process(fermenter followed by crystallization reactor) for full-scale application(treatment capacity Q=158,880 $m^3\;d^{-1}$), nutrient recycle loading from the crystallization reactor effluent to the main liquid stream would be significantly reduced(0.13 g N and 0.19 g P per $m^3$ of wastewater, respectively). The results of the experiment reveal therefore that the reuse of waste lime, already an industrial waste, in a nutrient recovery system has various advantages such as higher economical benefits and sustainable treatment of the industrial waste.

Influence of Membrane Material and Structure on Fouling of a Submerged Membrane Bioreactor (침지형 막 분리 활성슬러지법에서 막의 재질 및 구조가 파울링에 미치는 영향)

  • Choi, Jae-Hoon;Kim, Hyung-Soo
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.30 no.1
    • /
    • pp.31-36
    • /
    • 2008
  • This work was performed to evaluate the effect of membrane material and structure on fouling in a submerged membrane bioreactor(MBR). Three types of microfiltration membranes with the same pore size of 0.1 $\mu$m but different materials, polytetrafluoroethylene (PTFE), polycarbonate(PCTE) and polyester(PETE), were used. While PETE membrane exhibited the most rapid flux decline throughout the operation, PCTE and PTFE had a similar tendency with regard to permeability. Difference in permeability between PETE and the other membranes gradually decreased with time, which was probably due to chemical cleaning. The higher TOC rejection of PETE membrane could be attributable to its faster fouling, resulting from a larger amount of foulants to get attached to the membrane in a shorter time. DOC fractionation using a DAX-8 resin showed that the composition of each fraction between the supernatant and permeates did not change significantly with operation time, indicating that membrane hydrophilicity/hydrophobicity was not a dominant factor affecting to MBR fouling in this study. Compared to other membranes, the fouling of PETE membrane was more influenced by pore clogging (irreversible fouling), which would probably contribute to a higher organic rejection of the PETE membrane.

Development and Application of Modified SWMM to Simulate Permeable Pavement and Infiltration Trench (투수성 포장과 침투 트렌치를 고려한 수정 SWMM의 개발 및 적용)

  • Lee, Jung-Min;Lee, Sang-Ho;Park, Jae-Hyeon;Lee, Kil-Seong
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2007.05a
    • /
    • pp.326-330
    • /
    • 2007
  • 도시화 면적이 증가하면 불투수 면적이 증가하고 그에 따라 도시 하천의 평상시 유출이 감소한다. 도시유역의 평상시 수량을 회복시키는 방법으로는 침투 증진시설(투수성 포장, 침투 트렌치, 침투 측구 등)의 설치, 하수의 고도처리 후 방류 저수지에 의한 유황 개선, 지하철 용출수 활용 등이 있다. 우리나라의 경우에 일부 도시하천의 수량 감소가 심각한 상황에 이르고 있으며 이를 해결하고자 하는 노력이 최근에 나타나고 있다. 수량을 회복하려면 유량 평가를 위한 현장조사, 수량회복 계획, 재원의 반영, 수량회복 시설의 설치 및 관리의 순서로 단계별 사업이 수행되어야 한다. 계획 단계의 과업에서 필요한 사항은 여러 가지 수량 회복 방법의 영향을 정량 평가하는 것이다. 이에 핵심이 되는 것은 수량 회복 요소를 포함하거나 추가한 수문순환 평가 도구이다. 침투시설 중 투수성 포장과 침투 트렌치를 모의하도록 기존의 SWMM 모형을 수정하였다. 그 과정에서 증발량 처리와 지하수 출력기능에 대한 오류도 수정되었다. 수정 개발된 SWMM을 침투시설 모형실험 결과와 비교하여 수정된 프로그램의 적합성을 검증하였다. 투수성 포장과 침투 트렌치를 고려하여 수정된 프로그램을 안양천의 지류인 학의천 유역에 적용하여 침투시설의 효과를 분석하였다. 만일 학의천 불투수 면적의 10%를 투수성 포장으로 교체하면 하류 비산교 지점의 저수량$(Q_{275})$이 3 %, 갈수량$(Q_{355})$이 17 % 증가하는 것으로 분석되었다. 침투 트렌치의 경우 학의천 소유역 별로 100m 트렌치를 $5{\sim}10$개 시공할 경우 저수량은 약 1 %, 갈수량은 약9 %가 증가하였다. 수정 개발된 SWMM을 사용하면 침투 트렌치와 투수성 포장 이 도시 유역의 건기 수량회복에 미치는 영향을 분석할 수 있다.해 경보발령 이전에 한계수위를 넘어서는 경우(case_3)로서 분석되었다. 이러한 실패한 경보발령의 경우에 대한 원인분석 결과, 기존의 모형화를 통해 고려되지 못하였던 해안도시 홍수의 특성 중 총강우량에 대한 고려, 선행강우 여부 및 강우 지속시간, 지속시간 내 강우집중도 그리고 선정지점 내 조위의 영향과 유역내 합류식 하수관거 시스템의 영향 등 자연유역과는 다른 다소 복잡한 요소를 고려한 해안도시홍수 경보발령 기준에 대한 개선이 필요함을 확인할 수 있었다.이 좋다고 고찰된다. 6. 우리 나라의 현행 수도작기로 본 기온 및 일조조건은 수도의 분얼전기에 대해서는 호조건하에 놓여 있으나, 분얼후기인 7월 중ㆍ하순 경의 일조부족과 고온다습조건은 병해, 특히 도열병의 유발원인이 되고 있다. 7. 우리 나라의 현행수도작기로 본 전국각지의 수도의 출수기는 모두 일조시간이 적은 부적당한 시기에 처해 있다. 8. 출수후 40일간의 평균기온에 의한 적산온도 88$0^{\circ}C$의 출현기일은 수원에서 8월 23일이었고, 년간편차를 고려한 안전출수기일은 8월 19일로서 적산온도면에서는 관행 출수기일은 약간 늦다고 보았다. 9. 등열기의 평균기온에 의한 적산온도는 현행 수도작기로서는 최종한계시기에 놓여 있으며, 평균기온의 년간편차와 우리 나라의 최저기온이 낮은 점을 고려할 때, 현행출수기는 다소 늦은 것으로 보았다. 10. 생육단계별의 수도체내의 질소함량은 영양생장기의 질소함량이 과다하였으며, 출수 이후에 영양조락을 여하히 방지하느냐가 문제된다고 보았다. 11. 수리불안전답 및 천수답이 차지하는 전답면적의 비율은 차차 감소되고 있는데, 이와 전체 10a당 수량의 증가율과의 상관계수를 산출하였는데, 수리불안전답과의 상관계수 (4)는 +0.525였으며, 천수답과는 r=+0.832, 그리고 수리불안전답과 천수답을 합계한 것과의

  • PDF

Integrated System of RBC-lime Precipiatation for Simultaneous Removal of Organics and Nutrients (회전원판공정과 화학침전공정 조합을 이용한 유기물과 질소*인의 동시제거)

  • 박종안;허준무;손부순
    • Journal of Environmental Health Sciences
    • /
    • v.24 no.1
    • /
    • pp.132-140
    • /
    • 1998
  • Laboratory-scale experiments were conducted using a three-stage rotating biological contactor unit followed by lime precipitation and sedimentation with effluent recycle to the first stage. The purpose of this study was to evaluate the effects of hydraulic loadings of 0.031-0.076 $m^3/m^2/d and recycle ratio of 1 to 3 on the simultaneous removal of organics and nutrients from domestic wastewater. Lime was added to maintain pH of 10.4-11.0 in the coagulation-flocculation reactor. Results showed that the highest nitrogen removal rate of 70.5% occurred at the lower hydraulic loading of 0.031 $m^3/m^2/d at a recirculation rate of 300%, and similarly, highest nitrification occurred at the same hydraulic loading and recycle ratio. Concentration of ammonia nitrogen in the effluent was less than 1 mg/l at the same operating conditions for higher nitrogen removal. Whereas, high BOD and COD removal was observed at hydraulic loading rate of 0.054 $m^3/m^2/d, and high removal of organic matter was evident from the consistent low COD and BOD value. Results obtained from the operating condition of higher loading rate, 300% of recycle rate showed the highest removals. Increasing in recycle rate and hydraulic loading rate increased the volatile solids fraction of the sludges generated to the extent of 47% at 0.076 $m^3/m^2/d hydraulic loading and 300% recirculation rate. Since pH in the flocculator was maintained at the pH of 10.4-11.0, above 90% removal of phosphorus was obtained. Average concentration of suspended solids was always maintained over 40 mg/l in the effluent. Therefore an RBC unit operating at a hydraulic loading near 0.031 $m^3/m^2/d with a recycle rate of 300% is a viable and feasible alternate conditions to produce an effluent with relative low organic matter and phosphorus, provided that there is a neutralization unit to control the pH and SS of the effluent.

  • PDF

A Study on Advanced Municipal Wastewater Treatement by Daewoo Nutrients Removal (DNR) System (DNR 시스템에 의한 하수(下水)의 고도처리(高度處理)에 관한 연구(硏究))

  • Park, Myung-Gyun;Chang, Yun-Seok;Park, Chul-Hwi;Park, Chil-Lim
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.9 no.4
    • /
    • pp.115-123
    • /
    • 1995
  • The purpose of this study is to investigate the characteristics and performance of nitrogen and phosphorus removal system, Daewoo Nutrients Removal(DNR) system, and to find out the operating parameter for the system. During the study, $10m^3$ pilot plant was operated for the demonstration experiment and the primary effluent was taken from K domestic sewage treatment plant. The TN in the influent had been removed to approximately 70% through the nitrfication in the oxic tank and the denitrfication in the anoxic tank and the $PO_4-P$ and TP in the influent had been removed to 85% and 83% through anaerobic reaction and oxic reaction. The BOD and SS removal rate were 85 to 95% through the system. As the results, the values of effluent BOD, SS and slouble phosphorus were lower than A/O and $A^2/O$ processes. The SPRR (specific phosphorus release rate) at the anaerobic state of DNR system was ranged from 2.2 to 2.6mg SP/g VSS/h. The nutrient removal efficieny of the DNR system in view of the characteristics of the domestic sewage was higher than the pre-established A/O and $A^2/O$ processes. Finally, we believe that the DNR system was superior to the processes deveolped recently.

  • PDF

Evaluation Methodology and Comprehensive Performance Evaluation for Optimization of BNR Wastewater Treatment (BNR 하수처리 최적화를 위한 평가방법론 및 Comprehensive Performance Evaluation)

  • Shin, Hyung-Soo;Chang, Duk;Ryu, Dong-Jin
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.23 no.4
    • /
    • pp.417-430
    • /
    • 2009
  • A BNR comprehensive performance evaluation (BNR CPE) system was established employing system-oriented evaluation methodology for biological nutrient removal (BNR) processes based on the CPE techniques developed by U.S. EPA for evaluation of conventional biological processes. The BNR CPE system applied to five domestic BNR plants adopting $A^2/O$ process confirmed that all target plants except the smallest one had not any serious defective performance and process stability was enhanced with increasing plant size. The system also clearly verified relatively poor performances in anoxic reactors without exception mainly due to influent carbon limit rather than functional defect. Consistent good performances were confirmed even during both winter season and wet weather generally known to be difficult to achieve satisfactory removals. Presentation of evaluation results by modified radar chart system simplified and clarified the evaluation and analysis procedures. The BNR CPE system could not only discover readily the causes of present and prospective poor performances but also facilitate the suggestion of their optimization options. Mutual effect and cause-and-effect among operation parameters and unit processes were also found easily using the evaluation system. The system justified that the adverse effect of defective operating parameters could be compensated by other favorable parameters, especially in anaerobic and anoxic reactors as well as during the winter season.