• Title/Summary/Keyword: 플랜트 전문가

Search Result 56, Processing Time 0.027 seconds

A Study on Development of Plant Educational Contents For Training the Plant Experts in the Abroad Construction Market (해외건설시장의 플랜트 전문가 육성을 위한 교육 컨텐츠 개발 연구)

  • Park, Eun-Soo;Jang, Kyung-Soo;Koh, Sung-Won;Lee, Tai-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.695-698
    • /
    • 2007
  • As the world plant market extends, the number of the domestic construction company expansion to the abroad plant market is increasing. However, there is a lack of plant experts for opening domestic and abroad plant market; call in plant experts from abroad. Moreover, domestic plant education programs are not well constructed. And the education programs are not characterized by field, environment, and position. Thus, we should develop contents and establish the foundation for the plant education programs to train appropriate plant experts who will lead the world plant market. The purpose of the study is to develope educational contents for plant experts to be compatible in the abroad plant market. The contents developed by this study may practically used as the fundamental material for the future educational program.

  • PDF

A Study of Strategy for Activating Offshore Plant Industry R&D (해양플랜트 산업 활성화를 위한 R&D전략 연구)

  • Kim, June-Su;Kim, Sun-Jae;Kim, Hong-Young
    • Proceedings of the Korea Technology Innovation Society Conference
    • /
    • 2017.11a
    • /
    • pp.145-157
    • /
    • 2017
  • 최근 해양플랜트 시장은 저유가의 영향 등으로 인해 신규 해양플랜트 발주가 거의 없는 불황상태에 직면해 있다. 해양플랜트산업은 자원개발 및 부품 기자재 산업 등 전후방 연관산업에 대한 파급효과 측면에서 중요한 의미가 있으며, 미래 성장동력 창출의 관점에서 경쟁력 강화 및 체질 개선이 시급한 문제로 떠오르고 있다. 이에 본 연구에서는 해양플랜트 산업 R&D 현황을 살펴보고, 전문가 설문조사를 통해 이슈를 도출한 후 국내 해양플랜트 산업의 활성화 방안을 R&D 관점에서 제언하고자 한다.

  • PDF

Safety Management Factor Analysis of Expert Perceptions Based on 4M Method for Plant Construction Phase (플랜트 시설물 시공단계의 4M기법을 활용한 전문가 인식조사에 의한 안전관리요인 분석)

  • Kim, Kyujin;Choi, Byungsun;Chun, Jaeyoul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.18-27
    • /
    • 2016
  • The purpose of this study is to classify main risk factors on a construction phase of a plant project and analyze importance by the risk factors. Plant Industry is continuing boom and the increase in overseas plant orders in 2014 has showed a performance increase of 61% of the total orders, as the plant industry are risk factors for the construction phase, safety management target recognition and variety of accident prevention and safety factors by importance, etc. a situation that requires the development and introduction of management. So, it is performed that collected disaster conditions data on a construction phase of a plant project, is questioned by plant construction professional and is classified by 4M. Then, it is performed that is questioned by plant construction and safety professional in order to apply AHP method, and is presented from analyzing the risk factors, which are results of the survey, by importance and priority. This study will recognize from identifying the main risk factors in advance and will be utilized as a basic data is to prevent the risk factors.

A Study on the Critical Success Factors for Engineering step on Plant Project (플랜트 설계단계 핵심성공요인(CSF) 도출에 관한 연구)

  • Son, Jae-Ho;Han, Choong-Hee;Kim, Jae-On;Lee, Sang-Youb
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.227-234
    • /
    • 2007
  • 현재 플랜트 산업이 해외 건설 부문에서 차지하는 비중은 해외 건설 수주액의 60% 이상에 달하고 있다. 하지만 시공부문의 높은 기술경쟁력에 비하여 고부가가치 창출이 가능한 설계부문은 그 기술이 미흡한 실정이다. 따라서 본 연구에서는 플랜트산업의 우수설계능력 확보를 위하여 플랜트 설계단계의 성공에 대한 정의를 내리고, 플랜트 설계업무를 분석한 뒤, 설문조사를 통하여 플랜트 설계단계 프로세스의 업무별 중요도를 파악하였다. 또한 이렇게 파악된 중요도 점수를 공정관리 프로그램에 적용하였고, 이를 바탕으로 제시된 결과에 대한 전문가의 검토를 통하여 최종적으로 플랜트 설계단계의 핵심성공요인(CSF)을 도출하였다. 본 연구의 결과는 플랜트 설계단계 성공의 요인을 파악하고 확인 및 관리를 위한 요소들을 제시하여 설계단계 업무수행의 가이드라인으로 활용될 수 있을 것으로 기대된다. 또한, 향후에는 도출된 핵심성공요인을 이용하여 플랜트의 성공과 실패를 가름할 수 있는 정량적 평가모델 개발 등의 연구가 수행될 수 있을 것이다.

냉각장치의 고장징후에 대한 전문가시스템의 개발-크실렌 산화 공정을 중심으로-

  • 심종칠;김창은;주용준
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.717-722
    • /
    • 1996
  • 본 연구는 위험성이 큰 화학플랜트에서 크실렌 산화공정의 냉각계통에 잠재한 위험성을 HAZOP (Hazard and Operability Studies) 기법을 통하여 잠재한 위험공정부분을 미연에 파악하고 이를 평가하여 안전의 효율성을 높이며, 또한 평가후 이를 전문가시스템을 통하여 취약점을 미연에 파악할 수 있도록 냉각장치의 전문가시스템을 제시하고자 한다.

  • PDF

Activation Strategy of Plant Education Programme for Construction through Abroad Case (해외 사례를 통한 플랜트 교육 프로그램 활성화 방안)

  • Lee, Tai-Sik;Park, Eun-Soo;Lee, Dong-Wook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.332-337
    • /
    • 2006
  • Plant technology is integrated technology of industry which has big ripple effect to related industries but long-term investment is required in order to have technology power and long-term development plan must be set up and consistently managed by nationwide or similar industries. In addition, plant education program need to be developed to train high level technicians. Under this current situation, this research aims to seize current pictures of plant education internally and externally thru survey in the construction and to conduct basic research to develop education program for domestic improvement of plant technology power.

  • PDF

A Study on the Risk Assessment Methodology and Application for International Plants Construction (해외 플랜트 공사 리스크 평가 방안 및 적용에 관한 연구)

  • An, Sung-Hoon;Lee, Young-Nam;Jo, Ho-Kyoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.1
    • /
    • pp.134-142
    • /
    • 2008
  • Recently, international plants construction markets are expending. Specially, oil/gas plants constructions in Middle-East are booming. However, international plants construction projects are high risky. So a risk assessments and managements methodology for international plants construction is needed. In this study, the risk assessment methodology for international plants construction is proposed on the basis of the literature review in the international construction risk assessment methods and the knowledge of experts explored by interview. In addition, case study in Middle East was applied for reviewing these risk assessments and managements methodology for international plants construction.

Risk Identification and Priority method for Overseas LNG Plant Projects - Focusing on Design Phase - (해외 LNG 플랜트 리스크요인 도출 및 우선순위 평가 - 설계단계를 중심으로 -)

  • Jang, Woo-Sik;Hong, Hwa-Uk;Han, Seung-Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.146-154
    • /
    • 2011
  • Korean contractors have been maintained sustainable growth since entering into overseas construction market for the first time in 1960' s. In 2010, Korean contractors ordered 761 billion (USD) from overseas markets. Especially, billion (USD) were earned by Korean contractors in overseas plant construction market which account for more than 80% of the total amount by Korean contractors. Nevertheless, many Korean contractors are suffering from lack of technological competitiveness and construction management skills in the design phase compared with global leading contractors. These conditions have directly effect on the success of projects in terms of cost, duration, and quality. So, this study focused on identifying the risk factors and developing risk priority method for the design phase of LNG plant projects whose market is expanding. Research procedures were conducted by the following three steps. First, total 57 risk factors were identified in design phase through extensive literature reviews and experts survey. Second, the authors developed risk priority method which are more suitable for design phase of LNG plant projects by using three criteria, Probability(P), Impact(I), and Coordination Index(CI). Finally, the suitability of risk priority method and practical applicability were verified through expert survey and interview. Consequently, if korean contractors use the suggested risk factors and priority method based on their own know-how and experiences, then more reasonable and rational risk management will be conducted in the design phase of LNG plant projects.

Parameter tuning of Kalman fulter Using a Fuzzy Logic Control (퍼지 논리를 이용한 칼만 필터의 파라메터 조정)

  • 방은오;강성인;이상배
    • Proceedings of the Korean Institute of Intelligent Systems Conference
    • /
    • 1997.10a
    • /
    • pp.346-349
    • /
    • 1997
  • 칼만 필터는 피드백 제어의 형태를 사용하는 플랜트를 추정한다. 플랜트의 잡음이나 측정 외란이 발생하더라도 상태를 추정하여 최적의 제어를 행한다. 상태를 추정하기 위하여 칼만 필터의 이득 Kk를 저절하고, 이 이득은 칼만 필터의 파라메터인 측정 오차 공분산 Rk과 프로세서 잡음 오차 공분산 Qk를 조정함으로써 뛰어난 필터 수행을 얻을 수 있다. 그러나 필터 파라메터 Rk, Qk는 필터 연산 이전에 측정되어야 하지만, 현재는 전문가가 전문적인 지식을 바탕으로 파라메터를 조정하여 시스템을 제어하고 있다. 따라서 이러한 비효율적인 작업을 퍼지 논리 제어기를 이용하여 온-라인에서 최적의 파라메터 Rk를 구하고자 한다.

  • PDF

Plant equipment data system development based of ISO 15926 (ISO 15926 국제표준을 이용한 플랜트 기자재 정보 시스템 구축)

  • Ahn, Ho-Jun;Park, Ho-Byung;Choe, Jee-Woong
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2007.05a
    • /
    • pp.477-480
    • /
    • 2007
  • 국제표준규격인 ISO 10303(STEP), ISO 13584(PLIB), ISO 15926을 연구하고 해외건설 플랜트의 기자재 데이터를 입수하여 전문가를 통한 분석, 분류 및 국제표준규격(ISO 15926 RDL) 기반과 비교하여 분류체계 구축 및 속성정보 정의 작업을 수행하였다. 통합 및 분리가 필요한 기자재 클래스에 대해서는 통합, 분리 작업을 수행하였고 적용 가능한 속성정보가 있을 경우는 클래스별로 확장 적용하였다. 이에, 5단계 레벨, 637개의 분류체계가 구성되었고 개방형 구조의 XML으로 플랜트 기자재 정보를 구축하여 계층구조 분류트리 표현 및 해당 기자재의 제품에 대한 상세 정보를 나타내었다. 또한, 제품정보를 통합검색, 카테고리검색, 상세검색, 논리검색 기능으로 검색, 확인할 수 있고 표준 및 제품, 업체, 시스템을 관리하는 기자재 정보 관리 시스템을 구현하였다.