• Title/Summary/Keyword: 프로젝트 참여주체

Search Result 76, Processing Time 0.023 seconds

Measuring of the Performance of a Construction Management Project from Viewpoints of Project Participants -Focusing on Owner, Construction Manager, Designer and Constructor- (건설사업 참여주체(발주자, CMr, 설계자, 시공자) 관점에서 건설사업관리 성과측정에 관한 연구)

  • Ahn, Eun-Jin;Yoo, Byeong-Gi;Lee, Yoon-Sun;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.194-205
    • /
    • 2008
  • The production process of construction industry is different from thing of the general manufacturing, likewise various participants make temporary teamwork for success of the project through sharing of information. But, the each role of participants is Individually changed to step in construction process stage and moreover it has complicated, entangled interests. The CM(so it called Construction Management as an abbreviation word) system was inducted for the effective management and operation of construction project. The key of the CM success depends on the cooperative relationship relation to major participants. There are lots of studies and efforts for the performance measures of the CM, however existing performance index is only measured as the viewpoint of project owner. Therefore it needs to make up for balanced view through combination of the four-way view of participants. In this study, we should search for cooperative relationship of project participants, and then we should suggest to define the difference of project in their viewpoints.

Data Model for Document Exchange of Construction Projects (건설 프로젝트 문서교환을 위한 데이터모델)

  • An Sun-Ju;Son Bo-Sik;Lee Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.569-572
    • /
    • 2003
  • A construction process involves many designers, engineers, contractors, consulting engineers and government officials. Thus, it is essential to promote collaboration among such participants through of effective document exchange. There have been efforts to Improve efficiency of document exchange through Web. Also XML/EDI is recommended by its method. So the purpose of the research was to establish the data model for document information management in document exchange for construction participants using web-based XML/EDI. This research proposed a method of modeling document information for systemic management of document information that exchanged by XML/EDI in central and explained concept of application document information that stored in database. This research classified construction document according to its information relation.

  • PDF

The Simulation Function Analysis for BIM based construction planning (BIM기반 시공계획의 시뮬레이션 기능 분석 연구)

  • Jun, Ki-Hyun;Kim, Chang-Seob;Yun, Seok-Heon
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.95-98
    • /
    • 2011
  • 건설공사 프로젝트는 사전 기획 단계, 설계, 계약, 시공, 운영 및 유지관리 등 각 단계의 다양한 참여 주체에 의해 프로젝트가 진행되고 각 분야 간의 원활한 의사소통을 통한 협력 작업으로 일을 진행한다. 그러나 각 단계별 참여주체간의 협업이 어렵고 정보교류가 원활하지 못한 문제점들이 있다. 또한 건설공정은 현장여건의 변화와 불확실성으로 인해 예측이 어렵고, 보다 신뢰성이 있는 계획의 부재로 인하여 각종 세부 공정들 간의 간섭을 유발하고 계획된 일정을 준수하기 어려워 불필요한 비용의 낭비와 공사기간의 증가를 야기한다. 이러한 낭비요인을 최소화하고 건축 프로젝트를 진행하는데 있어서 효율성을 높이기 위해서는 시공계획 단계의 신뢰성을 높여야 한다. 따라서 시공전의 계획 단계에서부터 4D 시뮬레이션을 통하여 이러한 문제점들을 파악하고 개선하는 것이 중요하다. 본 연구에서는 BIM기반의 시뮬레이션 프로그램의 기능분석을 통하여 효율적인 적용과 발전과정을 알아보고자 한다.

  • PDF

Critical Environmental Management Factor by Project Participants for Considering Work Importance and Difficulty (업무 중요도-난이도를 고려한 프로젝트 참여주체별 핵심 환경관리 항목 도출)

  • Hong, Suk-Kyoo;Kim, Chang-Won;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.214-215
    • /
    • 2013
  • Recently, Construction industry has been trying to reduce environmental impacts reflecting the global trend 'Green Growth'. However most of previous studies focused on operation & maintenance phases and do not have been approached construction phases. In addition, environmental management factors by project participants are assessed with only weight of factors, overlooking these work difficulty. Therefore This study aims to deducted the critical environmental management factors by project participants considering work difficulty in plan, design and construction phase. The basis data is collected through literature reviews and interview targeting each project participant and analyze these data using importance-difficulty analysis(IDA).

  • PDF

영국지역상권활성화정책:영국TCM과BID

  • Seo, Yong-Gu
    • Proceedings of the Korean DIstribution Association Conference
    • /
    • 2005.11a
    • /
    • pp.463-485
    • /
    • 2005
  • 2000년대 이후 영구 지방 정책의 목표는 지역의 ‘균형 발전’과 ‘지속 가능 발전’을 촉진하는 것이다. 최근 영국에서는 미국에서 도입된 BID 제도가 정부의 적절한 지원과 개발 주체들의 협업의 성공으로 영국 전역에 급속히 퍼지고 있다. 성공사례를 분석한 결과 다양한 프로젝트 참여자들의 이해관계와 참여를 조정하는 ‘프로젝트 매니저’의 역량이 가장 중요하며 영국 TCM과 BID 제도의 핵심은 지역 마케팅(place marketing)이자 지역 브랜딩 (place branding)임을 알 수 있었다. 한국의 경우 영국형 TCM과 BID가 도입되기 위해서는 정보의 섬세한 마스터 플랜과 프로젝트 ‘종합성과평가’(CPA)가 먼저 준비되어야 하며 동시에 지역 마케팅에 대한 이해와 인식을 지금보다 획기적으로 제고 시켜야 한다.

  • PDF

A Study on the Post Management Impact of Consulting Service for Small and Medium Enterprise in Korea (한국중소기업을 위한 컨설팅서비스의 사후관리 효과에 관한 연구)

  • Jung, Goo-Sang;Lee, Sung-Hee;Kim, Young-Jin;Kim, Sun-Ah;Kim, Tae-Sung
    • Journal of Digital Convergence
    • /
    • v.10 no.6
    • /
    • pp.159-169
    • /
    • 2012
  • The purpose of this study is to analyze the post management impact of consulting service for small and medium enterprise in Korea using hierarchical multiple regression analysis. The results show that first, consulting activities have an effect on the consulting performance. Second, this research found that post management is an important moderate variable between consulting activities and performance. This study have an important meaning that we confirm a part of the knowledge management service for the consulting service, which is considered temporary task, to practice sustainability business.

Owner-driven Lean Construction based on Participants' Needs Analysis (건설주체간의 니즈분석을 통한 발주자 참여형 린 건설 연구)

  • Lee, Kang-Woo;Ryu, Chung-Gyu;Park, Hee-Dae;Han, Seung-Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.222-226
    • /
    • 2008
  • The construction industry has remained stagnant for a long time. So many researchers have wanted to solve this problem not only focusing on enhancement of construction process, but also introducing the culture of cooperation. The Last Planner System(LPS), one of the elementary techniques of Lean Construction, aims for improving the work reliability and reducing variability by measuring and managing the daily or weekly performance for overcoming the weakness of recent complex schedule management tools such as Critical Path Method. This research propose a framework for implementation of LPS conducted by owner focused on construction stage and introduce optimal owner participation model in plant construction, based on needs analysis for construction participants. Furthermore, this research introduce a modified needs analysis, so called IPBA(Importance-Performance-Betterment Analysis), and an advanced LPS procedure which add the needs analysis during pre-LPS and(or) main LPS stages.

  • PDF

A Platform Design Study of Intelligent Program Management Information System (iPMIS) (지능형 종합사업관리 시스템 플랫폼 디자인 방안에 관한 연구)

  • Yeom, Ji-Woong;Kim, Ju-Hyung;Ahn, Byung-Ju;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.716-719
    • /
    • 2008
  • Yongsan International business Center, Incheon Songdo City, Roppongihill sand Midtown, including the most of latest internal and external construction projects become larger and more complicated than before. Mega project is one of most complicated project type as public and private sectors involve and the space will be construed in all directions i.e. horizontal, vertical, underground and ground. Therefore mega projects need a new program management information system to start the project's success. So this paper proposes a platform design study to intelligent program management information systems to mange mega projects.

  • PDF

The Current State and Tasks of Citizen Science in Korea (한국 시민과학의 현황과 과제)

  • Park, Jin Hee
    • Journal of Science and Technology Studies
    • /
    • v.18 no.2
    • /
    • pp.7-41
    • /
    • 2018
  • The projects of citizen science which is originated from citizen data collecting action driven by governmental institutes and science associations have been implemented with different form of collaboration with scientists. The themes of citizen science has extended from the ecology to astronomy, distributed computing, and particle physics. Citizen science could contribute to the advancement of science through cost-effective science research based on citizen volunteer data collecting. In addition, citizen science enhance the public understanding of science by increasing knowledge of citizen participants. The community-led citizen science projects could raise public awareness of environmental problems and promote the participation in environmental problem-solving. Citizen science projects based on local tacit knowledge can be of benefit to the local environmental policy decision making and implementation of policy. These social values of citizen science make many countries develop promoting policies of citizen science. The korean government also has introduced some citizen science projects. However there are some obstacles, such as low participation of citizen and scientists in projects which the government has to overcome in order to promote citizen science. It is important that scientists could recognize values of citizen science through the successful government driven citizen science projects and the evaluation tool of scientific career could be modified in order to promote scientist's participation. The project management should be well planned to intensify citizen participation. The government should prepare open data policy which could support a data reliability of the community-led monitoring projects. It is also desirable that a citizen science network could be made with the purpose of sharing best practices of citizen science.

Development of Gateway Review System for Supporting Collaborative Decision-Making through Project Life Cycle (사업 단계별 의사결정 지원 게이트웨이 리뷰 체계 구축)

  • Shin, Seung-Woo;Yi, June-Seong;Lee, Jee-Hee;Park, Kyung-Rog;Lim, Ji-Youn
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.43-54
    • /
    • 2010
  • As Urban Regeneration is being carried out, stakeholders are most likely to have disagreements on their interests. Besides, dispersion of numerous communication routes and obscure decision processes aggravate the situation. Eventually, fragmented decision-making processes and complex structure lead to inefficient outcome and delay of projects. This paper is a study on decision-making support not only helps the program manager have more efficient and optimum decision, but also provides alternatives for Urban Regeneration. This study is conducted as follows. Firstly, the project process and the decision-making structure among stakeholders in Urban Regeneration are analyzed, and then the current status of decision-making in Urban Regeneration project is classified. Secondly, with literature study on "Gateway Review", the decision-making gateway review process in Urban Regeneration is defined, and then the "Gateway Review Elements" are listed. Thirdly, to establish gateway review process, this paper presents a check points, namely gate which supports a program manager to monitor and to control the program management in Urban Regeneration. Each gate has several supporting tools such as diagram of critical decision points relation, scheme of stakeholder, checklist. Fourthly, the proposed concept is verified by experts who have been carefully selected to provide their respective reviews. Finally, decision-making support gateway review system is modified based on their critiques and suggestions.